Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Midhun Reddy

Lok SabhaRajampet · Andhra Pradesh

MP score89/100190th of 539 in the 17th Lok Sabha
12th of 25 from Andhra Pradesh
Re-elected to the 18th Lok Sabha Then: 96% utilisation, 211 works completed, score 70.

Allocated limit

₹9.92 Cr

Median ₹8.60 Cr

Fund utilisation

86%

₹8.51 Cr recommended · 237 works
Below median (98%)

Paid to vendors

₹7.22 Cr

73% of allocation
Below median (88%)

Works completed

196

83% of recommended
About the median

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP237 works

    ₹8.51 Cr · 86% of the ₹9.92 Cr allocated

  2. Sanctioned by the district237 works

    100% sanctioned · took 38 days on average (due within 45 days)

  3. Completed196 works

    ₹6.71 Cr final cost · 6.9 months from recommendation on average

In plain words

What the numbers say

  • Recommended 237 works worth ₹8.51 Cr, a fund utilisation of 86%, higher than 10% of 17th Lok Sabha MPs.
  • The district has sanctioned 237 of them, taking 38 days on average.
  • ₹7.22 Cr has been paid to vendors, 73% of the allocation.
  • 196 works are complete, typically 6.9 months after recommendation. 196 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 108 vendors. The largest received 4.2%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 89/100: finishing works counts most

  1. Works completed 30%83Completed ÷ recommended works.
  2. Spending efficiency 20%93Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%86Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%73Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: M MALLIKARJUNA REDDY, 4.2% of payments across 108 vendors.

District sanction speed

100/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%100Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

237 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Providing CC Drains (Reach - II) at B.C. Colony of Nallaguttapalli Village of Ramapuram Mandal

    Sanitation & drainageProviding drains and gutters for public drainage· Annamayya· #81558

    ₹5.0 L Completed 17 Oct 2026Rec. 13 Jan 2024Paid ₹5.0 L
  • Providing Borewell at Kothapalli (V), Thatiguntapalli G.P

    Drinking waterInstalling tube-wells and borewells· Annamayya· #125952

    ₹1.5 L Completed 16 Oct 2026Rec. 12 Mar 2024Paid ₹1.5 L
  • Providing Syntex Tank at Venkateswarapuram ST Colony, T.Kammapalli G.P. Pullampeta (M)(2023-24 WK 86)

    Drinking waterConstruction of water tanks· Annamayya· #83381

    ₹49,932 Completed 15 Oct 2026Rec. 17 Jan 2024Paid ₹49,932
  • Providing Borewell at Thanevaddipalli (V) Near Venketeswara Swamy Temple, Mudupulavemula (G.P)

    Drinking waterInstalling tube-wells and borewells· Annamayya· #115948

    ₹1.2 L Completed 13 Oct 2026Rec. 2 Mar 2024Paid ₹1.2 L
  • Providing Borewell at Oil Seeds Back Side, Yerraguntapalli G.P

    Drinking waterInstalling tube-wells and borewells· Annamayya· #115960

    ₹1.4 L Completed 13 Oct 2026Rec. 2 Mar 2024Paid ₹1.4 L
  • Providing Borewell at CM Gudrevaripalli (V),Near Gutta Kada, MV Palli G.P

    Drinking waterInstalling tube-wells and borewells· Annamayya· #116277

    ₹1.3 L Completed 13 Oct 2026Rec. 2 Mar 2024Paid ₹1.3 L
  • Providing Borewell at Poolakuntavaripalli (V), Noothanakaluva G.P

    Drinking waterInstalling tube-wells and borewells· Annamayya· #116916

    ₹1.1 L Completed 13 Oct 2026Rec. 2 Mar 2024Paid ₹1.1 L
  • Providing Pipe Line at M Chandra Naik Bazar, H/o Sugali Thanda G.P

    Drinking waterProviding supply pipelines for drinking water· Annamayya· #113929

    ₹1.2 L Completed 4 Oct 2026Rec. 24 Feb 2024Paid ₹1.2 L
  • Providing R.O Plant at Peddireddi Ramachandra Reddy Colony, Piler (G.P)

    Drinking waterInstalling community drinking water plants· Annamayya· #121005

    ₹5.0 L Completed 1 Sept 2026Rec. 5 Mar 2024Paid ₹5.0 L
  • Providing Pipe Line at B Chandra Naik Bazar, H/o Sugali Thanda G.P

    Drinking waterProviding supply pipelines for drinking water· Annamayya· #113927

    ₹0 Completed 29 Aug 2026Rec. 24 Feb 2024
  • Construction of Community Hall at Chowdepalli Near CSI Church, Chowdepalle Mandal (2022-23-21019)

    Community buildings & public spacesConstruction of community centers and community halls· Chittoor· #85479

    ₹5.0 L Completed 27 Aug 2026Rec. 20 Jan 2024Paid ₹5.0 L
  • Construction of compound wall to community hall in LR Palle (V and M) Reach-I.

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Annamayya· #214728

    ₹2.5 L Completed 18 Mar 2026Rec. 8 Dec 2023Paid ₹2.5 L
  • Construction of Compound wall to community hall of LR Palle (V and M), Reach-II.

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Annamayya· #214730

    ₹2.4 L Completed 18 Mar 2026Rec. 8 Dec 2023Paid ₹2.4 L
  • Providing Motor and Accessories, Pipeline at Nettamvaripalli(V), Garalamadugu(G.P).

    Drinking waterProviding supply pipelines for drinking water· Annamayya· #214765

    ₹43,264 Completed 26 Dec 2025Rec. 8 Dec 2023Paid ₹43,264
  • Construction of Compound wall near Edgha at Guttapalem (V). Kalikiri (M)

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Annamayya· #214682

    ₹2.4 L Completed 7 Nov 2025Rec. 8 Dec 2023Paid ₹2.4 L

17th Lok Sabha MPs from Andhra Pradesh

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Vanga Geetha Viswanath · Kakinada100%99%12799
2Pocha Brahmananda Reddy · Nandyal100%100%13798
3Srinivas Kesineni · Vijayawada89%89%9197
4Nandigam Suresh · Bapatla95%93%11897
5Dr Sanjeev Kumar Singari · Kurnool90%89%35996
6Smt Chinta Anuradha · Amalapuram98%86%17696
7Jayadev Galla · Guntur100%97%13295
8Talari Rangaiah · Anantapur87%84%19194
9Shri N Reddeppa · Chittoor96%81%14191
10Kinjarapu Ram Mohan Naidu · Srikakulam95%81%10689
11Kuruva Gorantla Madhav · Hindupur85%83%6389
12Midhun Reddy · Rajampet86%73%19689

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.