2nd of 25 from Andhra Pradesh
Allocated limit
₹7.31 Cr
Median ₹8.60 Cr
Fund utilisation
100%
₹7.31 Cr recommended · 137 works
About the median
Paid to vendors
₹7.31 Cr
100% of allocation
Above median (88%)
Works completed
137
100% of recommended
Above median (83%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP137 works
₹7.31 Cr · 100% of the ₹7.31 Cr allocated
- Sanctioned by the district137 works
100% sanctioned · took 18 days on average (due within 45 days)
- Completed137 works
₹7.31 Cr final cost · 10.6 months from recommendation on average
In plain words
What the numbers say
- Recommended 137 works worth ₹7.31 Cr, a fund utilisation of 100%, higher than 86% of 17th Lok Sabha MPs.
- The district has sanctioned 137 of them, taking 18 days on average.
- ₹7.31 Cr has been paid to vendors, 100% of the allocation.
- 137 works are complete, typically 10.6 months after recommendation. 120 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 51 vendors. The largest received 18%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 98/100: finishing works counts most
- Works completed 30%100Completed ÷ recommended works.
- Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%88Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%100Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: K SURYA SHAKE SHAVEL REDDY, 18% of payments across 51 vendors.
District sanction speed
100/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%100Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
137 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Extension of pipe line at SC and BC colony in Cheruvupalli(V) of Banaganapalli(M) in Nandyal District(2022-23 2017-18 Year Fund)
Drinking waterProviding supply pipelines for drinking water· Nandyal· #67023
₹7.0 L Completed 27 Aug 2026Rec. 21 Dec 2023Paid ₹7.0 LProviding Installation of CC Cameras in Uyyalawada,Survaipalli,Peddayemmanuru,Mayaluru,Kondupalli,Pampalli,Injedu,Kakarawada,villages of Uyyalawada Mandan in Nandyal Dist(2022-23 2018-19 Year Fund)
Safety & securityProviding CCTV camera system for security of public areas· Nandyal· #67852
₹6.2 L Completed 14 May 2026Rec. 22 Dec 2023Paid ₹6.2 LProviding CC Road with drains from Sama Thimmaiah(H) to Yellaiah(H) & Other streets in Kolumulapalli(V)(2022-23 2017-18 Year Fund)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nandyal· #67768
₹2.8 L Completed 31 Mar 2026Rec. 22 Dec 2023Paid ₹2.8 LNew formation of approach road with gravel surface from R & B to Baraka Sanjeevarayudu temple Ch.1/040 to 1/340
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nandyal· #53665
₹5.0 L Completed 28 Mar 2026Rec. 28 Nov 2023Paid ₹5.0 LNew formation of approach road with gravel surface from R&B to Baraka Sanjeevarayudu temple Ch.1/340 to 1/640
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nandyal· #53667
₹5.0 L Completed 28 Mar 2026Rec. 28 Nov 2023Paid ₹5.0 LNew formation pf approach roads with gravel surface from R & B to Baraka Sanjeevarayudu temple ch.1/6400 to 1/710
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nandyal· #53682
₹2.4 L Completed 28 Mar 2026Rec. 28 Nov 2023Paid ₹2.4 LFormation of approach roads with gravel surface from Nandikotkur - Nagalooty main road to Devunimanyam Ch.0/530 to 1/060
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nandyal· #53718
₹5.0 L Completed 28 Mar 2026Rec. 28 Nov 2023Paid ₹5.0 LProviding Infrastructure facilities to Community hall
Community buildings & public spacesConstruction of community centers and community halls· Nandyal· #60446
₹4.9 L Completed 28 Mar 2026Rec. 12 Dec 2023Paid ₹4.9 LProviding Flooring in Community Hall Premises
Community buildings & public spacesConstruction of community centers and community halls· Nandyal· #60447
₹4.8 L Completed 28 Mar 2026Rec. 12 Dec 2023Paid ₹4.8 LProviding CC Road with drains from Airtel cell tower to Bodduraj & Other streets in Gudipadu(2022-23 2017-18 Year Fund)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nandyal· #67770
₹4.9 L Completed 28 Mar 2026Rec. 22 Dec 2023Paid ₹4.9 LConstruction of compound wall to the South side of EDGAH(2022-23 2017-18 Year Fund)
Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Nandyal· #67773
₹99,964 Completed 28 Mar 2026Rec. 22 Dec 2023Paid ₹99,964New formation of approch roads with gravel surface from Damagatla ZPHS School to NDK-Nagalooty Road CH 0.02to 0/614 at Damagatla Village (2022-23 2018-19 Year Fund)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nandyal· #67840
₹5.0 L Completed 28 Mar 2026Rec. 22 Dec 2023Paid ₹5.0 LNew formation of approch roads with gravel surface from Damagatla ZPHS School to NDK-Nagalooty Road CH 0/614 to 1/674 at Damagatla Village (2022-23 2018-19 Year Fund)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nandyal· #67841
₹5.0 L Completed 28 Mar 2026Rec. 22 Dec 2023Paid ₹5.0 LNew formation of approch roads with gravel surface from Damagatla ZPHS School to NDK-Nagalooty Road CH 1/674 to 2/730 at Damagatla Village (2022-23 2018-19 Year Fund)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nandyal· #67843
₹5.0 L Completed 28 Mar 2026Rec. 22 Dec 2023Paid ₹5.0 LConstruction of Baffel wall for Surplus weir of Kypa MI Tank
Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Nandyal· #53630
₹16.2 L Completed 26 Mar 2026Rec. 28 Nov 2023Paid ₹16.2 L
17th Lok Sabha MPs from Andhra Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Vanga Geetha Viswanath · Kakinada | 100% | 99% | 127 | 99 |
| 2 | Pocha Brahmananda Reddy · Nandyal | 100% | 100% | 137 | 98 |
| 3 | Srinivas Kesineni · Vijayawada | 89% | 89% | 91 | 97 |
| 4 | Nandigam Suresh · Bapatla | 95% | 93% | 118 | 97 |
| 5 | Dr Sanjeev Kumar Singari · Kurnool | 90% | 89% | 359 | 96 |
| 6 | Smt Chinta Anuradha · Amalapuram | 98% | 86% | 176 | 96 |
| 7 | Jayadev Galla · Guntur | 100% | 97% | 132 | 95 |
| 8 | Talari Rangaiah · Anantapur | 87% | 84% | 191 | 94 |
| 9 | Shri N Reddeppa · Chittoor | 96% | 81% | 141 | 91 |
| 10 | Kinjarapu Ram Mohan Naidu · Srikakulam | 95% | 81% | 106 | 89 |
| 11 | Kuruva Gorantla Madhav · Hindupur | 85% | 83% | 63 | 89 |
| 12 | Midhun Reddy · Rajampet | 86% | 73% | 196 | 89 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.