Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Pocha Brahmananda Reddy

Lok SabhaNandyal · Andhra Pradesh

MP score98/10010th of 539 in the 17th Lok Sabha
2nd of 25 from Andhra Pradesh

Allocated limit

₹7.31 Cr

Median ₹8.60 Cr

Fund utilisation

100%

₹7.31 Cr recommended · 137 works
About the median

Paid to vendors

₹7.31 Cr

100% of allocation
Above median (88%)

Works completed

137

100% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP137 works

    ₹7.31 Cr · 100% of the ₹7.31 Cr allocated

  2. Sanctioned by the district137 works

    100% sanctioned · took 18 days on average (due within 45 days)

  3. Completed137 works

    ₹7.31 Cr final cost · 10.6 months from recommendation on average

In plain words

What the numbers say

  • Recommended 137 works worth ₹7.31 Cr, a fund utilisation of 100%, higher than 86% of 17th Lok Sabha MPs.
  • The district has sanctioned 137 of them, taking 18 days on average.
  • ₹7.31 Cr has been paid to vendors, 100% of the allocation.
  • 137 works are complete, typically 10.6 months after recommendation. 120 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 51 vendors. The largest received 18%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 98/100: finishing works counts most

  1. Works completed 30%100Completed ÷ recommended works.
  2. Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%88Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%100Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: K SURYA SHAKE SHAVEL REDDY, 18% of payments across 51 vendors.

District sanction speed

100/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%100Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

137 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Extension of pipe line at SC and BC colony in Cheruvupalli(V) of Banaganapalli(M) in Nandyal District(2022-23 2017-18 Year Fund)

    Drinking waterProviding supply pipelines for drinking water· Nandyal· #67023

    ₹7.0 L Completed 27 Aug 2026Rec. 21 Dec 2023Paid ₹7.0 L
  • Providing Installation of CC Cameras in Uyyalawada,Survaipalli,Peddayemmanuru,Mayaluru,Kondupalli,Pampalli,Injedu,Kakarawada,villages of Uyyalawada Mandan in Nandyal Dist(2022-23 2018-19 Year Fund)

    Safety & securityProviding CCTV camera system for security of public areas· Nandyal· #67852

    ₹6.2 L Completed 14 May 2026Rec. 22 Dec 2023Paid ₹6.2 L
  • Providing CC Road with drains from Sama Thimmaiah(H) to Yellaiah(H) & Other streets in Kolumulapalli(V)(2022-23 2017-18 Year Fund)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nandyal· #67768

    ₹2.8 L Completed 31 Mar 2026Rec. 22 Dec 2023Paid ₹2.8 L
  • New formation of approach road with gravel surface from R & B to Baraka Sanjeevarayudu temple Ch.1/040 to 1/340

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nandyal· #53665

    ₹5.0 L Completed 28 Mar 2026Rec. 28 Nov 2023Paid ₹5.0 L
  • New formation of approach road with gravel surface from R&B to Baraka Sanjeevarayudu temple Ch.1/340 to 1/640

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nandyal· #53667

    ₹5.0 L Completed 28 Mar 2026Rec. 28 Nov 2023Paid ₹5.0 L
  • New formation pf approach roads with gravel surface from R & B to Baraka Sanjeevarayudu temple ch.1/6400 to 1/710

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nandyal· #53682

    ₹2.4 L Completed 28 Mar 2026Rec. 28 Nov 2023Paid ₹2.4 L
  • Formation of approach roads with gravel surface from Nandikotkur - Nagalooty main road to Devunimanyam Ch.0/530 to 1/060

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nandyal· #53718

    ₹5.0 L Completed 28 Mar 2026Rec. 28 Nov 2023Paid ₹5.0 L
  • Providing Infrastructure facilities to Community hall

    Community buildings & public spacesConstruction of community centers and community halls· Nandyal· #60446

    ₹4.9 L Completed 28 Mar 2026Rec. 12 Dec 2023Paid ₹4.9 L
  • Providing Flooring in Community Hall Premises

    Community buildings & public spacesConstruction of community centers and community halls· Nandyal· #60447

    ₹4.8 L Completed 28 Mar 2026Rec. 12 Dec 2023Paid ₹4.8 L
  • Providing CC Road with drains from Airtel cell tower to Bodduraj & Other streets in Gudipadu(2022-23 2017-18 Year Fund)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nandyal· #67770

    ₹4.9 L Completed 28 Mar 2026Rec. 22 Dec 2023Paid ₹4.9 L
  • Construction of compound wall to the South side of EDGAH(2022-23 2017-18 Year Fund)

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Nandyal· #67773

    ₹99,964 Completed 28 Mar 2026Rec. 22 Dec 2023Paid ₹99,964
  • New formation of approch roads with gravel surface from Damagatla ZPHS School to NDK-Nagalooty Road CH 0.02to 0/614 at Damagatla Village (2022-23 2018-19 Year Fund)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nandyal· #67840

    ₹5.0 L Completed 28 Mar 2026Rec. 22 Dec 2023Paid ₹5.0 L
  • New formation of approch roads with gravel surface from Damagatla ZPHS School to NDK-Nagalooty Road CH 0/614 to 1/674 at Damagatla Village (2022-23 2018-19 Year Fund)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nandyal· #67841

    ₹5.0 L Completed 28 Mar 2026Rec. 22 Dec 2023Paid ₹5.0 L
  • New formation of approch roads with gravel surface from Damagatla ZPHS School to NDK-Nagalooty Road CH 1/674 to 2/730 at Damagatla Village (2022-23 2018-19 Year Fund)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nandyal· #67843

    ₹5.0 L Completed 28 Mar 2026Rec. 22 Dec 2023Paid ₹5.0 L
  • Construction of Baffel wall for Surplus weir of Kypa MI Tank

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Nandyal· #53630

    ₹16.2 L Completed 26 Mar 2026Rec. 28 Nov 2023Paid ₹16.2 L

17th Lok Sabha MPs from Andhra Pradesh

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Vanga Geetha Viswanath · Kakinada100%99%12799
2Pocha Brahmananda Reddy · Nandyal100%100%13798
3Srinivas Kesineni · Vijayawada89%89%9197
4Nandigam Suresh · Bapatla95%93%11897
5Dr Sanjeev Kumar Singari · Kurnool90%89%35996
6Smt Chinta Anuradha · Amalapuram98%86%17696
7Jayadev Galla · Guntur100%97%13295
8Talari Rangaiah · Anantapur87%84%19194
9Shri N Reddeppa · Chittoor96%81%14191
10Kinjarapu Ram Mohan Naidu · Srikakulam95%81%10689
11Kuruva Gorantla Madhav · Hindupur85%83%6389
12Midhun Reddy · Rajampet86%73%19689

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.