Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Midhun Reddy

Lok SabhaYSRCPRajampet · Andhra Pradesh

MP score70/10090th of 542 in the 18th Lok Sabha
6th of 25 from Andhra Pradesh
Also an MP in the 17th Lok Sabha Then: 86% utilisation, 196 works completed, score 89.

Allocated limit

₹17.90 Cr

Median ₹14.70 Cr

Fund utilisation

96%

₹17.23 Cr recommended · 540 works
Above median (76%)

Paid to vendors

₹6.41 Cr

36% of allocation
About the median

Works completed

211

39% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP540 works

    ₹17.23 Cr · 96% of the ₹17.90 Cr allocated

  2. Sanctioned by the district514 works

    95% sanctioned · took 35 days on average (due within 45 days)

  3. Completed211 works

    ₹4.89 Cr final cost · 7.9 months from recommendation on average

26 works are still awaiting sanction, 23 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 540 works worth ₹17.23 Cr, a fund utilisation of 96%, higher than 85% of 18th Lok Sabha MPs.
  • The district has sanctioned 514 of them, taking 35 days on average.
  • ₹6.41 Cr has been paid to vendors, 36% of the allocation.
  • 211 works are complete, typically 7.9 months after recommendation. 214 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 97 vendors. The largest received 5.5%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 70/100: finishing works counts most

  1. Works completed 30%39Completed ÷ recommended works.
  2. Spending efficiency 20%76Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%96Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%36Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: N KAMALAKAR REDDY, 5.5% of payments across 97 vendors.

District sanction speed

98/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%98Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

543 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Providing Borewell in Nayunivaripalli (V), Jogivaripalli (G.P)

    Drinking waterInstalling tube-wells and borewells· Chittoor· #151568

    ₹1.6 L Completed 31 Oct 2026Rec. 14 Nov 2024Paid ₹1.6 L
  • Providing pipeline at Nagari HW Bommaiahgari palle G.P

    Drinking waterProviding supply pipelines for drinking water· Chittoor· #198065

    ₹2.6 L Completed 30 Oct 2026Rec. 10 May 2025Paid ₹2.6 L
  • Providing pipeline at Daddala vari palle, Bodipati vari palle G.P

    Drinking waterProviding supply pipelines for drinking water· Chittoor· #198083

    ₹1.9 L Completed 30 Oct 2026Rec. 10 May 2025Paid ₹1.9 L
  • Providing pipeline at Busireddi gari palle, Ch Ch reddy gari palle G.P

    Drinking waterProviding supply pipelines for drinking water· Chittoor· #198092

    ₹58,578 Completed 30 Oct 2026Rec. 10 May 2025Paid ₹58,578
  • Providing pipeline at Eguva jupalli vari palle ,Ganugachintha G.P

    Drinking waterProviding supply pipelines for drinking water· Chittoor· #198122

    ₹63,431 Completed 30 Oct 2026Rec. 10 May 2025Paid ₹63,431
  • Providing pipeline at Kallavari palle Ganugachintha G.P

    Drinking waterProviding supply pipelines for drinking water· Chittoor· #198127

    ₹74,947 Completed 30 Oct 2026Rec. 10 May 2025Paid ₹74,947
  • Providing pipeline at TANIKONDA VARI PALLE ,RAYAVARI PALLE G.P

    Drinking waterProviding supply pipelines for drinking water· Chittoor· #198337

    ₹1.4 L Completed 30 Oct 2026Rec. 10 May 2025Paid ₹1.4 L
  • Providing pipeline at GOTTIPALIVARI PALLE RAYAVARI PALLE G.P

    Drinking waterProviding supply pipelines for drinking water· Chittoor· #198346

    ₹63,212 Completed 30 Oct 2026Rec. 10 May 2025Paid ₹63,212
  • Providing pipeline at AYYAVARI PALLI GADDAMVARIPALLE G.P

    Drinking waterProviding supply pipelines for drinking water· Chittoor· #198348

    ₹35,807 Completed 30 Oct 2026Rec. 10 May 2025Paid ₹35,807
  • Augmentation of PWS Scheme at Gollapalli, Kavetigaripalli G.P

    Drinking waterProviding supply pipelines for drinking water· Chittoor· #198366

    ₹4.7 L Completed 30 Oct 2026Rec. 10 May 2025Paid ₹4.7 L
  • Augmentation of PWS Scheme at Erramvandlapalli, Ayyavandlapalli G.P

    Drinking waterProviding supply pipelines for drinking water· Chittoor· #198367

    ₹99,980 Completed 30 Oct 2026Rec. 10 May 2025Paid ₹99,980
  • Providing Pipe Line from Peerla Chavidi to Chruch in Somala Village and GP

    Drinking waterProviding supply pipelines for drinking water· Chittoor· #272603

    ₹81,226 Completed 30 Oct 2026Rec. 6 Mar 2026Paid ₹81,226
  • Upgradation of Road from Tamballapalli Main Road to Kotala Road via Gopidinne HW, Gopidinne GP

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Annamayya· #275139

    ₹2.0 L Completed 30 Oct 2026Rec. 25 Mar 2026Paid ₹2.0 L
  • Upgradation of Road from Jallavandlapalli to Ragimanudinnepalli via Mulkalcheruvu in Gopidinne Village and GP

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Annamayya· #275140

    ₹1.9 L Completed 30 Oct 2026Rec. 25 Mar 2026Paid ₹1.9 L
  • Upgradation of Road from Ballapuram Palli to Kotala Kaspa in Gopidinne Village and GP

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Annamayya· #275141

    ₹3.0 L Completed 30 Oct 2026Rec. 25 Mar 2026Paid ₹3.0 L

18th Lok Sabha MPs from Andhra Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Prabhakar Reddy Vemireddy · Nellore96%56%13883
2Bastipati Nagaraju Panchalingala · Kurnool58%28%14475
3Daggumalla Prasada Rao · Chittoor99%63%13774
4GM Harish Balayogi · Amalapuram79%39%5473
5Putta Mahesh Kumar · Eluru92%31%6771
6Midhun Reddy · Rajampet96%36%21170
7Maddila Gurumoorthy · Tirupati93%37%12269
8B K Parthasarathi · Hindupur62%31%5666
9Kinjarapu Ram Mohan Naidu · Srikakulam91%40%7963
10Gumma Thanuja Rani · Araku71%55%3058
11Y S Avinash Reddy · Kadapa83%33%5857
12Dr Byreddy Shabari · Nandyal57%31%7057

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.