This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Smt Chinta Anuradha

Lok SabhaSC seatAmalapuram · Andhra Pradesh

MP score96/10045th of 539 in the 17th Lok Sabha
6th of 25 from Andhra Pradesh

Allocated limit

₹11.77 Cr

Median ₹8.60 Cr

Fund utilisation

98%

₹11.52 Cr recommended · 192 works
About the median

Paid to vendors

₹10.07 Cr

86% of allocation
About the median

Works completed

176

92% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP192 works

    ₹11.52 Cr · 98% of the ₹11.77 Cr allocated

  2. Sanctioned by the district190 works

    99% sanctioned · took 30 days on average (due within 45 days)

  3. Completed176 works

    ₹10.07 Cr final cost · 8.2 months from recommendation on average

2 works are still awaiting sanction, 2 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 192 works worth ₹11.52 Cr, a fund utilisation of 98%, higher than 49% of 17th Lok Sabha MPs.
  • The district has sanctioned 190 of them, taking 30 days on average.
  • ₹10.07 Cr has been paid to vendors, 86% of the allocation.
  • 176 works are complete, typically 8.2 months after recommendation. 177 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 44 vendors. The largest received 14%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 96/100: finishing works counts most

  1. Works completed 30%92Completed ÷ recommended works.
  2. Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%98Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%86Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: Jalem Rambabu, 14% of payments across 44 vendors.

District sanction speed

99/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%99Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

193 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of Retaining Wall to Drain in godithippa

    Sanitation & drainageProviding drains and gutters for public drainage· Dr. B.R. Ambedkar Konaseema· #12115

    ₹2.5 L Completed 8 Dec 2025Rec. 22 Aug 2023Paid ₹2.5 L
  • Construction of Compound wall and Toilets at Muslim Burrial Ground in Allavaram(V)

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Dr. B.R. Ambedkar Konaseema· #54494

    ₹2.9 L Completed 8 Dec 2025Rec. 29 Nov 2023Paid ₹2.9 L
  • Construction of Burial ground shed at Mukteswaram (v) in Ainavilli (M)

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Dr. B.R. Ambedkar Konaseema· #27165

    ₹4.5 L Completed 9 Oct 2025Rec. 27 Sep 2023Paid ₹4.5 L
  • Providing CC road near Patta somasekhar site to Nukapai Suman (H) in EEthakota (V)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dr. B.R. Ambedkar Konaseema· #27173

    ₹4.8 L Completed 9 Oct 2025Rec. 27 Sep 2023Paid ₹4.8 L
  • Construction of Burial Ground Building (OC And BC’s)

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Dr. B.R. Ambedkar Konaseema· #14318

    ₹4.7 L Completed 8 Sept 2025Rec. 29 Aug 2023Paid ₹4.7 L
  • Providing C C Road from Dudi Adhinarayan House to Gudimetla Venkanna Babu House in Appanapalli(V)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dr. B.R. Ambedkar Konaseema· #75085

    ₹5.0 L Completed 1 Aug 2025Rec. 4 Jan 2024Paid ₹5.0 L
  • Providing CC road in Ramji Colony at Sannavilli (V),

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dr. B.R. Ambedkar Konaseema· #35293

    ₹14.2 L Completed 27 May 2025Rec. 10 Oct 2023Paid ₹14.2 L
  • Construction of SC Community Hall

    Community buildings & public spacesConstruction of community centers and community halls· Dr. B.R. Ambedkar Konaseema· #14323

    ₹4.9 L Completed 19 May 2025Rec. 29 Aug 2023Paid ₹4.9 L
  • Providing Amenities in Ambedkar Community Hall near Market in P.Gannavaram

    Community buildings & public spacesConstruction of community centers and community halls· Dr. B.R. Ambedkar Konaseema· #54478

    ₹5.0 L Completed 17 May 2025Rec. 29 Nov 2023Paid ₹5.0 L
  • Construction of Compound wall to Shaadhi Khana Building at Ambajipeta (V)

    Community buildings & public spacesConstruction of community centers and community halls· Dr. B.R. Ambedkar Konaseema· #54482

    ₹4.9 L Completed 17 May 2025Rec. 29 Nov 2023Paid ₹4.9 L
  • Providing CC Road from D.No. 6-2-12 to Sri M.N.V Prasad house in Gandhinagar at 10th Ward

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dr. B.R. Ambedkar Konaseema· #54474

    ₹12.1 L Completed 8 May 2025Rec. 29 Nov 2023Paid ₹12.1 L
  • Construction of Compound Wall and Toilets at Muslim Burial Ground in Thandavapalli(V)

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Dr. B.R. Ambedkar Konaseema· #54497

    ₹2.9 L Completed 6 May 2025Rec. 29 Nov 2023Paid ₹2.9 L
  • Construction of Toilets & other amenities to the blind School in Amalapuram (V)

    Sanitation & drainageConstruction of toilet blocks· Dr. B.R. Ambedkar Konaseema· #88543

    ₹5.0 L Completed 24 Mar 2025Rec. 25 Jan 2024Paid ₹5.0 L
  • Construction of Bridge at KM0.010 on Vadrevupalli Medium Drain in Vynateya Basin-3 in G.C.Delta

    Roads & bridgesConstruction of culverts and bridges· Dr. B.R. Ambedkar Konaseema· #41204

    ₹25.0 L Completed 15 Mar 2025Rec. 27 Oct 2023Paid ₹25.0 L
  • PROVIDING CC ROAD WITH UNDER GROUND DRAIN FROM PASALAPUDI SRI VEERA RAGHAVARAO (H) TO MATTAPARTHI SATYANARAYANA (H) IN MACHAVARAM

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dr. B.R. Ambedkar Konaseema· #54479

    ₹3.9 L Completed 15 Mar 2025Rec. 29 Nov 2023Paid ₹3.9 L

17th Lok Sabha MPs from Andhra Pradesh

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Vanga Geetha Viswanath · Kakinada100%99%12799
2Pocha Brahmananda Reddy · Nandyal100%100%13798
3Srinivas Kesineni · Vijayawada89%89%9197
4Nandigam Suresh · Bapatla95%93%11897
5Dr Sanjeev Kumar Singari · Kurnool90%89%35996
6Smt Chinta Anuradha · Amalapuram98%86%17696
7Jayadev Galla · Guntur100%97%13295
8Talari Rangaiah · Anantapur87%84%19194
9Shri N Reddeppa · Chittoor96%81%14191
10Kinjarapu Ram Mohan Naidu · Srikakulam95%81%10689
11Kuruva Gorantla Madhav · Hindupur85%83%6389
12Midhun Reddy · Rajampet86%73%19689

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.