This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Srinivas Kesineni

Lok SabhaVijayawada · Andhra Pradesh

MP score97/10022nd of 539 in the 17th Lok Sabha
3rd of 25 from Andhra Pradesh

Allocated limit

₹6.38 Cr

Median ₹8.60 Cr

Fund utilisation

89%

₹5.66 Cr recommended · 91 works
Below median (98%)

Paid to vendors

₹5.66 Cr

89% of allocation
About the median

Works completed

91

100% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP91 works

    ₹5.66 Cr · 89% of the ₹6.38 Cr allocated

  2. Sanctioned by the district87 works

    96% sanctioned · took 5.0 months on average (due within 45 days)

  3. Completed91 works

    ₹5.66 Cr final cost · 21.9 months from recommendation on average

4 works are still awaiting sanction, 4 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 91 works worth ₹5.66 Cr, a fund utilisation of 89%, higher than 15% of 17th Lok Sabha MPs.
  • The district has sanctioned 87 of them, taking 5.0 months on average.
  • ₹5.66 Cr has been paid to vendors, 89% of the allocation.
  • 91 works are complete, typically 21.9 months after recommendation. 94 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Community buildings & public spaces.
  • Payments went to 22 vendors. The largest received 16%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 97/100: finishing works counts most

  1. Works completed 30%100Completed ÷ recommended works.
  2. Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%89Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%99Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%89Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: PALETI SATEESH, 16% of payments across 22 vendors.

District sanction speed

81/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%81Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

95 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Balance works (i.e. Construction of 100 KL Sump, Repairs to the existing pipeline for a length of 1.50 KM and Providing R.O plant Machinary) for completion of Water Supply Scheme at Jawahar Autonagar, Vijayawada

    Drinking waterInstalling community drinking water plants· Ntr· #121513

    ₹15.5 L Completed 30 Mar 2026Rec. 6 Mar 2024Paid ₹15.5 L
  • Construction of Milk Collection Centre building at Ananthavaram H/o Pondugula(V) of Mylavaram(M)

    Community buildings & public spacesConstruction of community centers and community halls· Ntr· #121537

    ₹3.7 L Completed 27 Mar 2026Rec. 7 Mar 2024Paid ₹3.7 L
  • Construction of Compound wall and drain to Community Hall in Garudachalam, Pochampalli(V) of Jaggaiahpet(M)

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Ntr· #181210

    ₹4.3 L Completed 27 Mar 2026Rec. 8 Feb 2024Paid ₹4.3 L
  • Construction of Bus Shelter at Polisettipadu GP in A.Konduru Mandal

    Community buildings & public spacesConstruction of bus-sheds or bus-stops· Ntr· #181240

    ₹3.4 L Completed 27 Mar 2026Rec. 8 Feb 2024Paid ₹3.4 L
  • Providing Water Tanker to Gowravaram GP of Jaggaiahpeta mandal

    Drinking waterPurchase of mobile water tankers· Ntr· #121737

    ₹2.4 L Completed 25 Mar 2026Rec. 7 Mar 2024Paid ₹2.4 L
  • Providing Water Tanker to Lingala GP of Vatsavai Mandal

    Drinking waterPurchase of mobile water tankers· Ntr· #121738

    ₹2.4 L Completed 25 Mar 2026Rec. 7 Mar 2024Paid ₹2.4 L
  • Construction of culvert on Nalla Vagu in Chinthalapadu (V) of Chandarlapadu (M)

    Roads & bridgesConstruction of culverts and bridges· Ntr· #121898

    ₹15.0 L Completed 18 Mar 2026Rec. 7 Mar 2024Paid ₹15.0 L
  • Construction of Compound Wall to SASR ZP High School at Chilukurivari gudem of Pulluru of Mylavaram (M)

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Ntr· #122557

    ₹4.8 L Completed 18 Mar 2026Rec. 7 Mar 2024Paid ₹4.8 L
  • Construction of Meeting Hall and Record Room at Collectorate in Vijayawada (Part-F)

    Safety & securityConstruction of Government office buildings (Post office, Police station, Police chauki, etc.)· Ntr· #122564

    ₹5.0 L Completed 18 Mar 2026Rec. 7 Mar 2024Paid ₹5.0 L
  • Construction of CC Road from Ramalayam to Dandu Srimannarayan House at Atlapragada (V) of Khambampadu GP, A.Konduru (M)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ntr· #122574

    ₹5.0 L Completed 18 Mar 2026Rec. 7 Mar 2024Paid ₹5.0 L
  • Construction of CC Road from Changala Krishna Reddy house to Alavala Ravi House at Atlapragada (V) of Khambampadu GP, A.Konduru (M)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ntr· #122575

    ₹5.0 L Completed 18 Mar 2026Rec. 7 Mar 2024Paid ₹5.0 L
  • Construction of Balance CC Roads in OC locality of Atlapragada (V) of Khambampadu GP, A.Konduru (M)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ntr· #122576

    ₹4.9 L Completed 18 Mar 2026Rec. 7 Mar 2024Paid ₹4.9 L
  • Construction of Skill Development Centre building at Garudachalam Pochampalli(V) of Jaggaiahpet(M)

    Community buildings & public spacesConstruction of buildings for training institutions· Ntr· #181208

    ₹14.4 L Completed 18 Mar 2026Rec. 8 Feb 2024Paid ₹14.4 L
  • Construction of compound wall to burrial ground at Bandipalem(V) of Jaggaiahpet(M)

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Ntr· #181211

    ₹3.3 L Completed 18 Mar 2026Rec. 8 Feb 2024Paid ₹3.3 L
  • Construction of Milk Collection Centre building at Bhimavaram(V) in Jaggaiahpet(M)

    Community buildings & public spacesConstruction of community centers and community halls· Ntr· #181217

    ₹3.7 L Completed 18 Mar 2026Rec. 8 Feb 2024Paid ₹3.7 L

17th Lok Sabha MPs from Andhra Pradesh

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Vanga Geetha Viswanath · Kakinada100%99%12799
2Pocha Brahmananda Reddy · Nandyal100%100%13798
3Srinivas Kesineni · Vijayawada89%89%9197
4Nandigam Suresh · Bapatla95%93%11897
5Dr Sanjeev Kumar Singari · Kurnool90%89%35996
6Smt Chinta Anuradha · Amalapuram98%86%17696
7Jayadev Galla · Guntur100%97%13295
8Talari Rangaiah · Anantapur87%84%19194
9Shri N Reddeppa · Chittoor96%81%14191
10Kinjarapu Ram Mohan Naidu · Srikakulam95%81%10689
11Kuruva Gorantla Madhav · Hindupur85%83%6389
12Midhun Reddy · Rajampet86%73%19689

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.