Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Nandigam Suresh

Lok SabhaBapatla · Andhra Pradesh

MP score97/10030th of 539 in the 17th Lok Sabha
4th of 25 from Andhra Pradesh

Allocated limit

₹9.14 Cr

Median ₹8.60 Cr

Fund utilisation

95%

₹8.68 Cr recommended · 122 works
About the median

Paid to vendors

₹8.50 Cr

93% of allocation
Above median (88%)

Works completed

118

97% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP122 works

    ₹8.68 Cr · 95% of the ₹9.14 Cr allocated

  2. Sanctioned by the district122 works

    100% sanctioned · took 47 days on average (due within 45 days)

  3. Completed118 works

    ₹8.46 Cr final cost · 23.6 months from recommendation on average

In plain words

What the numbers say

  • Recommended 122 works worth ₹8.68 Cr, a fund utilisation of 95%, higher than 30% of 17th Lok Sabha MPs.
  • The district has sanctioned 122 of them, taking 47 days on average.
  • ₹8.50 Cr has been paid to vendors, 93% of the allocation.
  • 118 works are complete, typically 23.6 months after recommendation. 112 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 43 vendors. The largest received 20%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 97/100: finishing works counts most

  1. Works completed 30%97Completed ÷ recommended works.
  2. Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%95Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%95Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%93Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    99
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: GHANISHKA GROUP OF INDUSTRIES, 20% of payments across 43 vendors.

District sanction speed

100/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%100Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

122 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of Cultural Hall in Nattalavaripalem, Alluru Village of Pittalavanipalem Mandal.

    Community buildings & public spacesConstruction of buildings for community cultural activities· Bapatla· #105124

    ₹7.2 L Completed 8 Oct 2026Rec. 17 Feb 2024Paid ₹7.2 L
  • Providing CC Road from R&B Road to Bethapudi Rajendra (H) in Mandadam Village of Thulluru Mandal.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #89539

    ₹3.8 L Physical Inspection · 23 Jun 2026Rec. 26 Jan 2024Paid ₹3.8 L
  • Providing Amenities to tank Ura Cheruvu at Nizampatnam G.P.

    Drinking waterConstruction of water tanks· Bapatla· #253025

    ₹3.0 L Completed 31 Mar 2026Rec. 18 Oct 2023Paid ₹3.0 L
  • Construction of Slab Culvert at Cheruvu Alugu in Uppumagulur GP of Ballikurava Mandal. (East side)

    Roads & bridgesConstruction of culverts and bridges· Bapatla· #50845

    ₹4.7 L Completed 30 Mar 2026Rec. 20 Nov 2023Paid ₹4.7 L
  • Construction of Slab Culvert at Cheruvu Alugu in Uppumagulur GP of Ballikurava Mandal. (West side)

    Roads & bridgesConstruction of culverts and bridges· Bapatla· #50846

    ₹5.0 L Completed 30 Mar 2026Rec. 20 Nov 2023Paid ₹5.0 L
  • Construction of Compound wall to the SC (Madiga) Burial Ground (South Side) in Uppumagulur GP of Ballikurava Mandal. (South side)

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Bapatla· #50847

    ₹5.0 L Completed 30 Mar 2026Rec. 20 Nov 2023Paid ₹5.0 L
  • Construction of Compound wall to the SC (Madiga) Burial Ground in Uppumagulur GP of Ballikurava Mandal. (South-East corner Side)

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Bapatla· #50848

    ₹5.0 L Completed 30 Mar 2026Rec. 20 Nov 2023Paid ₹5.0 L
  • Construction of Compound wall to the SC (Madiga) Burial Ground in Uppumagulur GP of Ballikurava Mandal. (North Side)

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Bapatla· #50849

    ₹4.9 L Completed 30 Mar 2026Rec. 20 Nov 2023Paid ₹4.9 L
  • Construction of Compound wall to the SC (Madiga) Burial Ground in Uppumagulur GP of Ballikurava Mandal. ((North-west Side))

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Bapatla· #50850

    ₹4.9 L Completed 30 Mar 2026Rec. 20 Nov 2023Paid ₹4.9 L
  • Construction of Compound wall to the SC (Madiga) Burial Ground in Uppumagulur GP of Ballikurava Mandal. (East Side)

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Bapatla· #50851

    ₹5.0 L Completed 30 Mar 2026Rec. 20 Nov 2023Paid ₹5.0 L
  • Construction of Compound wall to the SC (Madiga) Burial Ground in Uppumagulur GP of Ballikurava Mandal. (West Side)

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Bapatla· #50852

    ₹5.0 L Completed 30 Mar 2026Rec. 20 Nov 2023Paid ₹5.0 L
  • Construction of CC Road and Side Drains from Syamala Seetha Ravamma (H) to Karanam gari (H) in Uppumagulur GP of Ballikurava Mandal.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bapatla· #50853

    ₹5.0 L Completed 30 Mar 2026Rec. 20 Nov 2023Paid ₹5.0 L
  • Construction of CC Road and Side Drains from Syamala Punna Reddy (H) to Sanagala Ramana Sastry (H) in Uppumagulur GP of Ballikurava Mandal.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bapatla· #50854

    ₹4.8 L Completed 30 Mar 2026Rec. 20 Nov 2023Paid ₹4.8 L
  • Construction of compound wall to the SC Burial ground in Uppumagulur G.P of Ballikurava Mandal.

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Bapatla· #50859

    ₹3.8 L Completed 30 Mar 2026Rec. 20 Nov 2023Paid ₹3.8 L
  • Construction of Internal CC Road from Thorati Yehoshuva shed to R&B road in Vallapalli G.P of Ballikurava Mandal.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bapatla· #50860

    ₹4.9 L Completed 30 Mar 2026Rec. 20 Nov 2023Paid ₹4.9 L

17th Lok Sabha MPs from Andhra Pradesh

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Vanga Geetha Viswanath · Kakinada100%99%12799
2Pocha Brahmananda Reddy · Nandyal100%100%13798
3Srinivas Kesineni · Vijayawada89%89%9197
4Nandigam Suresh · Bapatla95%93%11897
5Dr Sanjeev Kumar Singari · Kurnool90%89%35996
6Smt Chinta Anuradha · Amalapuram98%86%17696
7Jayadev Galla · Guntur100%97%13295
8Talari Rangaiah · Anantapur87%84%19194
9Shri N Reddeppa · Chittoor96%81%14191
10Kinjarapu Ram Mohan Naidu · Srikakulam95%81%10689
11Kuruva Gorantla Madhav · Hindupur85%83%6389
12Midhun Reddy · Rajampet86%73%19689

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.