Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Jayadev Galla

Lok SabhaGuntur · Andhra Pradesh

MP score95/10054th of 539 in the 17th Lok Sabha
7th of 25 from Andhra Pradesh

Allocated limit

₹10.71 Cr

Median ₹8.60 Cr

Fund utilisation

100%

₹10.69 Cr recommended · 147 works
About the median

Paid to vendors

₹10.44 Cr

97% of allocation
Above median (88%)

Works completed

132

90% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP147 works

    ₹10.69 Cr · 100% of the ₹10.71 Cr allocated

  2. Sanctioned by the district143 works

    97% sanctioned · took 2.4 months on average (due within 45 days)

  3. Completed132 works

    ₹9.68 Cr final cost · 25.0 months from recommendation on average

4 works are still awaiting sanction, 4 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 147 works worth ₹10.69 Cr, a fund utilisation of 100%, higher than 75% of 17th Lok Sabha MPs.
  • The district has sanctioned 143 of them, taking 2.4 months on average.
  • ₹10.44 Cr has been paid to vendors, 97% of the allocation.
  • 132 works are complete, typically 25.0 months after recommendation. 135 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 46 vendors. The largest received 8.5%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 95/100: finishing works counts most

  1. Works completed 30%90Completed ÷ recommended works.
  2. Spending efficiency 20%93Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%97Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: GONUGUNTLA RAMBABU, 8.5% of payments across 46 vendors.

District sanction speed

94/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%94Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

150 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of Community Hall at Diguvamagham Village Harizana wada of Thavanampalle Mandal.

    Community buildings & public spacesConstruction of community centers and community halls· Chittoor· #91290

    ₹19.6 L Completed 31 Oct 2026Paid ₹19.6 L
  • BT Road from Chittoor R&B Road to Kondrajukalava HW of Thavanamplle Mandal.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Chittoor· #127228

    ₹13.9 L Completed 31 Oct 2026Paid ₹13.9 L
  • Construction of Compound wall at SC Burial Ground in Telaprolu Village of Tenali Mandal.

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Guntur· #78935

    ₹23.0 L Physical Inspection · 17 Jul 2026Rec. 10 Jan 2024Paid ₹22.4 L
  • Construction of CC Road from Gummadi Arjun Rao House to Sriram Akkaiyah house Kattevaram Villlage of Tenali Mandal.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #78937

    ₹6.0 L Physical Inspection · 17 Jul 2026Rec. 10 Jan 2024Paid ₹5.9 L
  • Providing Internal CC Roads in Chandrababu Colony of Medikonduru Village & Mandal.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #71374

    ₹10.7 L Completed 31 Mar 2026Rec. 29 Dec 2023Paid ₹10.7 L
  • Providing CC Road from Padarthi Venu House to Cherchi in Kakumanu Village of Kakumanu Mandal.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #71690

    ₹7.0 L Completed 31 Mar 2026Rec. 30 Dec 2023Paid ₹7.0 L
  • Construction of Cremation shed in Hindu Burrial Ground of Karampudipadu Village in Vatticherukuru Mandal.

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Guntur· #76932

    ₹5.0 L Completed 31 Mar 2026Rec. 7 Jan 2024Paid ₹5.0 L
  • Providing CC Road and Drain from Gundiga Joseph House to Chinnabathuni Bala Sowri House in Phiringipuram Village of Phirangipuram Mandal.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #87022

    ₹2.4 L Completed 31 Mar 2026Rec. 23 Jan 2024Paid ₹2.4 L
  • Providing CC Road from Chalapathi College Gate to Guntur-Amaravathi R&D Road at Chalapathi College in Lam Village of Tadikonda Mandal.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #70681

    ₹12.3 L Completed 28 Mar 2026Rec. 28 Dec 2023Paid ₹12.3 L
  • Providing CC Road and Drains from boddu Raye center to Goppapuram R&B Road in Returu Village of Kakumanu Mandal.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #71691

    ₹9.1 L Completed 28 Mar 2026Rec. 30 Dec 2023Paid ₹9.1 L
  • Providing CC Roads from Pittala Venkata Ramarajunagar of Lingayapalem Village of Guntur Rural Mandal.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #80004

    ₹13.1 L Completed 28 Mar 2026Rec. 11 Jan 2024Paid ₹13.1 L
  • Construction of CC Road from Borugadda Prabhavathi to Arre Suseela Veerlapalem Village of Duggirala Mandal.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #71647

    ₹1.8 L Completed 26 Mar 2026Rec. 30 Dec 2023Paid ₹1.8 L
  • Consrtruction of CC Road from Krosuri Srinivasarao House to Yarlagadda Sarveswara Rao House in Manchikalapudi Village of Duggirala Mandal.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #71652

    ₹3.4 L Completed 26 Mar 2026Rec. 30 Dec 2023Paid ₹3.4 L
  • Construction of CC Road from R&B Road to Sarvonnathuni Sannidi Church in Namburu Village of Pedakakani Mandal

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #76946

    ₹2.5 L Completed 26 Mar 2026Rec. 7 Jan 2024Paid ₹2.5 L
  • Construction of CC Road from Katari Kotaiah House to Katari Durga Rao House of Namburu Village of Pedakakani Mandal.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #78947

    ₹2.0 L Completed 26 Mar 2026Rec. 10 Jan 2024Paid ₹2.0 L

17th Lok Sabha MPs from Andhra Pradesh

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Vanga Geetha Viswanath · Kakinada100%99%12799
2Pocha Brahmananda Reddy · Nandyal100%100%13798
3Srinivas Kesineni · Vijayawada89%89%9197
4Nandigam Suresh · Bapatla95%93%11897
5Dr Sanjeev Kumar Singari · Kurnool90%89%35996
6Smt Chinta Anuradha · Amalapuram98%86%17696
7Jayadev Galla · Guntur100%97%13295
8Talari Rangaiah · Anantapur87%84%19194
9Shri N Reddeppa · Chittoor96%81%14191
10Kinjarapu Ram Mohan Naidu · Srikakulam95%81%10689
11Kuruva Gorantla Madhav · Hindupur85%83%6389
12Midhun Reddy · Rajampet86%73%19689

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.