Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Talari Rangaiah

Lok SabhaAnantapur · Andhra Pradesh

MP score94/10073rd of 539 in the 17th Lok Sabha
8th of 25 from Andhra Pradesh

Allocated limit

₹13.48 Cr

Median ₹8.60 Cr

Fund utilisation

87%

₹11.71 Cr recommended · 198 works
Below median (98%)

Paid to vendors

₹11.29 Cr

84% of allocation
About the median

Works completed

191

96% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP198 works

    ₹11.71 Cr · 87% of the ₹13.48 Cr allocated

  2. Sanctioned by the district195 works

    98% sanctioned · took 56 days on average (due within 45 days)

  3. Completed191 works

    ₹11.25 Cr final cost · 12.2 months from recommendation on average

3 works are still awaiting sanction, 3 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 198 works worth ₹11.71 Cr, a fund utilisation of 87%, higher than 12% of 17th Lok Sabha MPs.
  • The district has sanctioned 195 of them, taking 56 days on average.
  • ₹11.29 Cr has been paid to vendors, 84% of the allocation.
  • 191 works are complete, typically 12.2 months after recommendation. 181 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Community buildings & public spaces.
  • Payments went to 80 vendors. The largest received 6.3%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 94/100: finishing works counts most

  1. Works completed 30%96Completed ÷ recommended works.
  2. Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%87Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%93Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%84Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: D Murali Krishna, 6.3% of payments across 80 vendors.

District sanction speed

98/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%98Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

201 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of Low level Culvert across Penna river on the road from Chitturu to Tarimela of Peddavadugur Mandal

    Roads & bridgesConstruction of culverts and bridges· Ananthapuramu· #25972

    ₹17.6 L Completed 1 Oct 2026Rec. 25 Sep 2023Paid ₹17.6 L
  • Construction of Low Level Culvert across Penna River on the road from Tarimela to Chitturu of Singanamala Mandal

    Roads & bridgesConstruction of culverts and bridges· Ananthapuramu· #25973

    ₹24.2 L Completed 1 Oct 2026Rec. 25 Sep 2023Paid ₹24.2 L
  • Construction of Community Hall , Near Ramalingeswra Swamy Temple , in Sy.No. 389, at Yatakal Village Settur Mandal

    Community buildings & public spacesConstruction of buildings for community cultural activities· Ananthapuramu· #35206

    ₹8.8 L Completed 1 Oct 2026Rec. 10 Oct 2023Paid ₹8.8 L
  • Structures on burial / Cremation ground – General for public convenience ( Compound Wall , Gate etc.,) in Sy.No.13-B at Korrapdu Village of Bukkarayasamudram Mandal

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Ananthapuramu· #40151

    ₹4.2 L Completed 1 Oct 2026Rec. 25 Oct 2023Paid ₹4.2 L
  • Construction of additional rooms etc., in the existing Government Veterinary Hospital at Beluguppa Village of Beluguppa Mandal.

    HealthConstruction of veterinary hospitals and dispensaries· Ananthapuramu· #75931

    ₹6.0 L Completed 1 Oct 2026Rec. 6 Jan 2024Paid ₹6.0 L
  • Providing of Transformer, Power supply at Westkodipalli Village of Brahmasamudram Mandal

    Electricity & lightingImprovement of electricity distribution infrastructure· Ananthapuramu· #108095

    ₹4.1 L Completed 1 Oct 2026Rec. 18 Feb 2024Paid ₹4.1 L
  • Providing Amenities to Mini Meeting Hall in Collectorate at Aaanthapuramu

    Safety & securityConstruction of Government office buildings (Post office, Police station, Police chauki, etc.)· Ananthapuramu· #8762

    ₹5.0 L Completed 8 May 2026Rec. 11 Aug 2023Paid ₹5.0 L
  • Providing CC Pavment, Drawf Wall & Granite Flooring in Collectorate at Ananthapuramu

    Safety & securityConstruction of Government office buildings (Post office, Police station, Police chauki, etc.)· Ananthapuramu· #8767

    ₹5.0 L Completed 8 May 2026Rec. 11 Aug 2023Paid ₹5.0 L
  • Construction of Additional rooms and halls in the existing public and community building, in Sy.No.614-1,Siddalapuram road, near Akkamma Temple of Atmakur Village of Atmakur Mandal

    Community buildings & public spacesConstruction of additional rooms and halls in the existing public and community building· Ananthapuramu· #3961

    ₹10.0 L Completed 4 May 2026Rec. 16 Jul 2023Paid ₹10.0 L
  • Construction of Compound wall to Burial Ground at Lathavaram Thanda village of Uravakonda mandal

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Ananthapuramu· #8571

    ₹8.8 L Completed 4 May 2026Rec. 9 Aug 2023Paid ₹8.8 L
  • Providing CC road from Hirehal Pedda Hanumanthu house to Peddamma Temple at Uddehal GP of Bommanahal Mandal

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ananthapuramu· #21762

    ₹4.6 L Completed 4 May 2026Rec. 16 Sep 2023Paid ₹4.6 L
  • Construction of Cultural Building in Sy.No.339, Adharsh Nagar, Ananthapuramu Mpl. Corporation

    Community buildings & public spacesConstruction of buildings for community cultural activities· Ananthapuramu· #3952

    ₹9.2 L Completed 28 Apr 2026Rec. 16 Jul 2023Paid ₹9.2 L
  • Construction of Pipe culverts on the road from Rampuram to Molakathalla village, Rampuram GP, Peddavadugur Mandal

    Roads & bridgesConstruction of culverts and bridges· Ananthapuramu· #4077

    ₹2.9 L Completed 25 Mar 2026Rec. 17 Jul 2023Paid ₹2.9 L
  • Construction of Community hall at Vitlampalli Village , Hullikallu GP of Kalyandurg Mandal

    Community buildings & public spacesConstruction of buildings for community cultural activities· Ananthapuramu· #3954

    ₹10.0 L Completed 18 Mar 2026Rec. 16 Jul 2023Paid ₹10.0 L
  • Construction of Approach Road from 2/800 metre to 2/875 metre Benekal Road at Singanahalli Village of Bommanahal Mandal

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ananthapuramu· #40626

    ₹4.5 L Completed 18 Mar 2026Rec. 26 Oct 2023Paid ₹4.5 L

17th Lok Sabha MPs from Andhra Pradesh

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Vanga Geetha Viswanath · Kakinada100%99%12799
2Pocha Brahmananda Reddy · Nandyal100%100%13798
3Srinivas Kesineni · Vijayawada89%89%9197
4Nandigam Suresh · Bapatla95%93%11897
5Dr Sanjeev Kumar Singari · Kurnool90%89%35996
6Smt Chinta Anuradha · Amalapuram98%86%17696
7Jayadev Galla · Guntur100%97%13295
8Talari Rangaiah · Anantapur87%84%19194
9Shri N Reddeppa · Chittoor96%81%14191
10Kinjarapu Ram Mohan Naidu · Srikakulam95%81%10689
11Kuruva Gorantla Madhav · Hindupur85%83%6389
12Midhun Reddy · Rajampet86%73%19689

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.