MPLADS report card · 17th Lok Sabha

Dr Sanjeev Kumar Singari

Lok SabhaKurnool · Andhra Pradesh

MP score96/10035th of 539 in the 17th Lok Sabha
5th of 25 from Andhra Pradesh

Allocated limit

₹11.47 Cr

Median ₹8.60 Cr

Fund utilisation

90%

₹10.35 Cr recommended · 361 works
Below median (98%)

Paid to vendors

₹10.19 Cr

89% of allocation
About the median

Works completed

359

99% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP361 works

    ₹10.35 Cr · 90% of the ₹11.47 Cr allocated

  2. Sanctioned by the district355 works

    98% sanctioned · took 19 days on average (due within 45 days)

  3. Completed359 works

    ₹10.00 Cr final cost · 8.9 months from recommendation on average

6 works are still awaiting sanction, 6 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 361 works worth ₹10.35 Cr, a fund utilisation of 90%, higher than 18% of 17th Lok Sabha MPs.
  • The district has sanctioned 355 of them, taking 19 days on average.
  • ₹10.19 Cr has been paid to vendors, 89% of the allocation.
  • 359 works are complete, typically 8.9 months after recommendation. 346 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Drinking water.
  • Payments went to 33 vendors. The largest received 18%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 96/100: finishing works counts most

  1. Works completed 30%99Completed ÷ recommended works.
  2. Spending efficiency 20%98Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%90Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%95Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%89Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: PADMASREE BORE WELLS KURNOOL, 18% of payments across 33 vendors.

District sanction speed

99/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%99Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

367 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Providing 2 patrolling vehicles for public safety and security at Kurnool and Adoni.

    Safety & securityPatrolling vehicles to Government institution for public conveniences, safety and security· Kurnool· #117751

    ₹23.0 L Completed 15 Aug 2026Rec. 29 Feb 2024Paid ₹23.0 L
  • Construction of Community Hall at Halvi (V) of Kowthalam (M)

    Community buildings & public spacesConstruction of community centers and community halls· Kurnool· #12718

    ₹9.6 L Completed 14 Aug 2026Rec. 24 Aug 2023Paid ₹9.6 L
  • Providing CC Road and Drain from Chandra Swamy (H) to Kappidi Hanumanthu (H) in Upparahal (V) Kowthalam (M)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kurnool· #12745

    ₹16.0 L Completed 14 Aug 2026Rec. 24 Aug 2023Paid ₹16.0 L
  • Construction of Compound Wall along with Main Gate to Govt. BC Boys Hostel, Ternekal(V), Devanakonda(M), Kurnool (D)

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Kurnool· #88019

    ₹4.9 L Completed 14 Aug 2026Rec. 24 Jan 2024Paid ₹4.9 L
  • Providing service line near Thippa doddi Sri Anjaneya Swamy temple, Ulchala V, Kurnool Mandal. The estimation copy is submitted by EE, Operations, APSPDCL, Kurnool.

    Electricity & lightingImprovement of electricity distribution infrastructure· Kurnool· #89018

    ₹1.3 L Completed 14 Aug 2026Rec. 25 Jan 2024Paid ₹1.3 L
  • DAISY Production Centre-cum-Digital Library for Blind and Visually-Impaired in Kurnool

    Divyang & social welfarePurchase of other aids / devices required for P/ M/ V/ H impaired for differently abled persons· Kurnool· #120836

    ₹3.1 L Completed 14 Aug 2026Rec. 5 Mar 2024Paid ₹3.1 L
  • Pipeline extension from Vanka to SC Colony and BC Colony (upto Kottala) in Doddimekala (V), Peddaladubur (M)

    Drinking waterProviding supply pipelines for drinking water· Kurnool· #12728

    ₹9.4 L Completed 13 Aug 2026Rec. 24 Aug 2023Paid ₹9.4 L
  • Extension of pipeline from OHSR to Secretariat in Sunkeswari(V) Mantralayam(M)

    Drinking waterProviding supply pipelines for drinking water· Kurnool· #12731

    ₹11.8 L Completed 13 Aug 2026Rec. 24 Aug 2023Paid ₹11.8 L
  • MP LADs – Kurnool Constituency – Providing Ambulance to Indian Red Cross Society, Kurnool under MP LADs funds under 2023 – 24 –reg.

    HealthPurchase of ambulances (Four, Three and Two wheelers)· Kurnool· #35801

    ₹26.7 L Completed 13 Aug 2026Rec. 11 Oct 2023Paid ₹26.7 L
  • Providing CC Road and Drain from Harijana Paseddula Nagesh(H) to Harijana Paseddula Balarangadu field in Rollapadu (V) of Tuggali (M)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kurnool· #12746

    ₹6.5 L Completed 9 Jan 2026Rec. 24 Aug 2023Paid ₹6.5 L
  • Providing Internal CC Roads from Golla Veeranna (H) to Talari Ramudu (H) and other locations in BC Colony in Kothur (Ramachandrapuram) (V), Pyalakurthy (GP) Kodumur (M), Kurnool District

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kurnool· #87193

    ₹3.2 L Completed 9 Jan 2026Rec. 23 Jan 2024Paid ₹3.2 L
  • Providing Internal CC Roads and under Ground Drainage from Vengoti Venganna (H) to Ugadi Govindu(H) and other locations in Pyalakurthy (V) Kodumur (M), Kurnool District

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kurnool· #87194

    ₹3.7 L Completed 9 Jan 2026Rec. 23 Jan 2024Paid ₹3.7 L
  • Drilling of new bore well for Scheme Source to Village Extension Area in Pattikonda (V&M)

    Drinking waterInstalling tube-wells and borewells· Kurnool· #118960

    ₹2.0 L Completed 13 Aug 2025Rec. 2 Mar 2024Paid ₹2.0 L
  • Drilling of new bore well for Scheme Source SC Extension Area in Maddikera (V&M)

    Drinking waterInstalling tube-wells and borewells· Kurnool· #118967

    ₹2.0 L Completed 13 Aug 2025Rec. 2 Mar 2024Paid ₹2.0 L
  • Drilling of new bore well for Scheme Source SC Extension Area in G Erragudi (V), Tuggali (M)

    Drinking waterInstalling tube-wells and borewells· Kurnool· #118969

    ₹2.0 L Completed 13 Aug 2025Rec. 2 Mar 2024Paid ₹2.0 L

17th Lok Sabha MPs from Andhra Pradesh

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Vanga Geetha Viswanath · Kakinada100%99%12799
2Pocha Brahmananda Reddy · Nandyal100%100%13798
3Srinivas Kesineni · Vijayawada89%89%9197
4Nandigam Suresh · Bapatla95%93%11897
5Dr Sanjeev Kumar Singari · Kurnool90%89%35996
6Smt Chinta Anuradha · Amalapuram98%86%17696
7Jayadev Galla · Guntur100%97%13295
8Talari Rangaiah · Anantapur87%84%19194
9Shri N Reddeppa · Chittoor96%81%14191
10Kinjarapu Ram Mohan Naidu · Srikakulam95%81%10689
11Kuruva Gorantla Madhav · Hindupur85%83%6389
12Midhun Reddy · Rajampet86%73%19689

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.