Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Dr Byreddy Shabari

Lok SabhaTDPNandyal · Andhra Pradesh

MP score57/100245th of 542 in the 18th Lok Sabha
12th of 25 from Andhra Pradesh

Allocated limit

₹18.26 Cr

Median ₹14.70 Cr

Fund utilisation

57%

₹10.43 Cr recommended · 212 works
Below median (76%)

Paid to vendors

₹5.66 Cr

31% of allocation
Below median (37%)

Works completed

70

33% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP212 works

    ₹10.43 Cr · 57% of the ₹18.26 Cr allocated

  2. Sanctioned by the district180 works

    85% sanctioned · took 43 days on average (due within 45 days)

  3. Completed70 works

    ₹3.18 Cr final cost · 7.8 months from recommendation on average

32 works are still awaiting sanction, 16 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 212 works worth ₹10.43 Cr, a fund utilisation of 57%, higher than 19% of 18th Lok Sabha MPs.
  • The district has sanctioned 180 of them, taking 43 days on average.
  • ₹5.66 Cr has been paid to vendors, 31% of the allocation.
  • 70 works are complete, typically 7.8 months after recommendation. 68 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 37 vendors. The largest received 20%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 57/100: finishing works counts most

  1. Works completed 30%33Completed ÷ recommended works.
  2. Spending efficiency 20%56Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%57Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%96Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%31Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: JAGADEESWARA REDDY DEKIREDDY, 20% of payments across 37 vendors.

District sanction speed

96/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%96Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

213 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Providing Internal CC Roads including Drainage System and Culverts from RO Water Plant to Shivalayam Temple and Other Internal Streets in P. Muchumarri (V&GP), Pagidyala Mandal, Nandyal District

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nandyal· #320042

    ₹5.0 L Awaiting sanction · 28 daysRec. 4 Oct 2026
  • Construction of Internal CC Road including Drainage System and Culverts at Weekly Market in P. Muchumarri (V&GP), Pagidyala Mandal, Nandyal District

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nandyal· #320043

    ₹5.0 L Awaiting sanction · 28 daysRec. 4 Oct 2026
  • Providing Internal CC Roads including Drainage System and Culverts from Rythu Seva Kendram to RO Water Plant and Other Internal Streets in P. Muchumarri (V&GP), Pagidyala Mandal, Nandyal District

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nandyal· #320044

    ₹5.0 L Awaiting sanction · 28 daysRec. 4 Oct 2026
  • Providing CC Drain from Bus Shelter to Nehru Nagar Cross Road along the Main Road in P. Muchumarri Village, Pagidyala Mandal, Nandyal District

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nandyal· #320045

    ₹5.0 L Awaiting sanction · 28 daysRec. 4 Oct 2026
  • Construction of Pump Room and Providing 1000 LPH RO Unit at SC Colony, Kothapalli Village, Nandyal Mandal, Nandyal District

    Drinking waterInstalling community drinking water plants· Nandyal· #320047

    ₹5.0 L Awaiting sanction · 28 daysRec. 4 Oct 2026
  • Providing and Installation of 1000 LPH Community RO Drinking Water Plant and Shed near OHSR at SPY Reddy Colony, Nandyal Municipality, Nandyal District

    Drinking waterInstalling community drinking water plants· Nandyal· #320049

    ₹5.0 L Awaiting sanction · 28 daysRec. 4 Oct 2026
  • Providing and Installation of 1000 LPH Community RO Drinking Water Plant at Nandamuri Nagar, Nandyal Municipality, Nandyal District

    Drinking waterInstalling community drinking water plants· Nandyal· #320054

    ₹5.0 L Awaiting sanction · 28 daysRec. 4 Oct 2026
  • Drilling of New 165 mm Diameter Bore Well with Casing, Development and Pumping Machinery near Bus Stand, Tharigopula Village, Jupadubungalow Mandal

    Drinking waterInstalling tube-wells and borewells· Nandyal· #300904

    ₹2.0 L Awaiting sanction · 34 daysRec. 28 Sep 2026
  • Drilling of New 165 mm Diameter Bore Well with Casing, Development and Pumping Machinery near Santha Market, Jupadubungalow Village, Jupadubungalow Mandal.

    Drinking waterInstalling tube-wells and borewells· Nandyal· #300905

    ₹2.0 L Awaiting sanction · 34 daysRec. 28 Sep 2026
  • Drilling of New 165 mm Diameter Bore Well with Casing, Development and Pumping Machinery In Kothapalli (V) of Kothapalli (M)

    Drinking waterInstalling tube-wells and borewells· Nandyal· #300906

    ₹2.0 L Awaiting sanction · 34 daysRec. 28 Sep 2026
  • Providing Borewell In Pathamadugula (V) of Erramatam GP in Kothapalli (M)

    Drinking waterInstalling tube-wells and borewells· Nandyal· #300908

    ₹2.0 L Awaiting sanction · 34 daysRec. 28 Sep 2026
  • Replacement of Internal Drinking Water Distribution Pipeline from OHSR to N. Baludu House at Srinivasapuram H/o Yalluru Village, Gospadu Mandal

    Drinking waterProviding supply pipelines for drinking water· Nandyal· #318836

    ₹4.5 L Awaiting sanction · 34 daysRec. 28 Sep 2026
  • Replacement of Internal Drinking Water Distribution Pipeline from K. Chandra Mouli House to Anjaneyaswamy Temple at Srinivasapuram H/o Yalluru Village, Gospadu Mandal

    Drinking waterProviding supply pipelines for drinking water· Nandyal· #318837

    ₹4.5 L Awaiting sanction · 34 daysRec. 28 Sep 2026
  • Providing Drinking Water Pipeline from Temple to OHSR Tank at Bhaskarapuram (H/o Tatipadu Village), Jupadu Bungalow Mandal.

    Drinking waterProviding supply pipelines for drinking water· Nandyal· #318840

    ₹4.5 L Awaiting sanction · 34 daysRec. 28 Sep 2026
  • Establishment of Mineral Water Treatment (RO) Plant (1000 LPH) with Pump Room and Shed near Bus Stand at Tharigopula Village, Jupadu Bungalow Mandal

    Drinking waterInstalling community drinking water plants· Nandyal· #318844

    ₹5.0 L Awaiting sanction · 34 daysRec. 28 Sep 2026

18th Lok Sabha MPs from Andhra Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Prabhakar Reddy Vemireddy · Nellore96%56%13883
2Bastipati Nagaraju Panchalingala · Kurnool58%28%14475
3Daggumalla Prasada Rao · Chittoor99%63%13774
4GM Harish Balayogi · Amalapuram79%39%5473
5Putta Mahesh Kumar · Eluru92%31%6771
6Midhun Reddy · Rajampet96%36%21170
7Maddila Gurumoorthy · Tirupati93%37%12269
8B K Parthasarathi · Hindupur62%31%5666
9Kinjarapu Ram Mohan Naidu · Srikakulam91%40%7963
10Gumma Thanuja Rani · Araku71%55%3058
11Y S Avinash Reddy · Kadapa83%33%5857
12Dr Byreddy Shabari · Nandyal57%31%7057

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.