Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
92%
₹13.56 Cr recommended · 137 works
Above median (76%)
Paid to vendors
₹4.50 Cr
31% of allocation
Below median (37%)
Works completed
67
49% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP137 works
₹13.56 Cr · 92% of the ₹14.70 Cr allocated
- Sanctioned by the district118 works
86% sanctioned · took 5.1 months on average (due within 45 days)
- Completed67 works
₹3.81 Cr final cost · 11.0 months from recommendation on average
19 works are still awaiting sanction, 7 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 137 works worth ₹13.56 Cr, a fund utilisation of 92%, higher than 78% of 18th Lok Sabha MPs.
- The district has sanctioned 118 of them, taking 5.1 months on average.
- ₹4.50 Cr has been paid to vendors, 31% of the allocation.
- 67 works are complete, typically 11.0 months after recommendation. 67 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Community buildings & public spaces.
- Payments went to 14 vendors. The largest received 42%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 71/100: finishing works counts most
- Works completed 30%49Completed ÷ recommended works.
- Spending efficiency 20%85Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%92Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%31Paid to vendors ÷ allocated limit.
- Vendor diversity 10%73How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: I MAX SCIENCE HOUSE, 42% of payments across 14 vendors.
District sanction speed
80/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%80Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
137 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Providing RO Water plant 1000LPH in near Anganwadi School Sitaramapuram Village of Unguturu mandal H/O Racuru
Drinking waterInstalling community drinking water plants· Eluru· #294620
₹4.0 L Sanctioned · 24 Oct 2026Rec. 16 Jul 2026Provinding New Bore and Motor at Housing colony of Ravikampadu village of kamavarapukota mandal
Drinking waterInstalling tube-wells and borewells· Eluru· #315316
₹5.0 L Sanctioned · 24 Oct 2026Rec. 16 Sep 2026providing Infrastructure Facilities for R.O Plant at Narayanapuram H/O Uppalapadu village of kamavarapukota Mandal
Drinking waterInstalling community drinking water plants· Eluru· #315429
₹5.0 L Sanctioned · 24 Oct 2026Rec. 16 Sep 2026Construction of CC drain From Social Welfare Girls Hostel to health sub center in seetharama colony of Pulla Village Of Bhimadole Mandal
Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Eluru· #317080
₹3.0 L Sanctioned · 24 Oct 2026Rec. 23 Sep 2026Construction of CC drain From Pasupuleti Jagadhamba House to Maddirala Nageswarao House in seetharama colony of Pulla Village Of Bhimadole Mandal
Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Eluru· #317081
₹4.0 L Sanctioned · 24 Oct 2026Rec. 23 Sep 2026Construction of CC drain from Mallem peddaabhai House to Rowthu Prasad House In M.M.Puram H/o Pulla Village of Bhimadole Mandal
Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Eluru· #317082
₹3.0 L Sanctioned · 24 Oct 2026Rec. 23 Sep 2026Contruction Of CC drain from Borra Venkatapathi House to Mallem peddaabhai House In M.M.Puram H/O Pulla Village Of Bhimadole mandal
Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Eluru· #317083
₹3.0 L Sanctioned · 24 Oct 2026Rec. 23 Sep 2026Construction of Foot-path bridge across Kaikaluru channel at Arya Vysya Kalyana mandapam in Kaikaluru Village of Kaikaluru Mandal
Roads & bridgesConstruction of footpaths and pedestrian ways· Eluru· #315336
₹20.0 L Sanctioned · 16 Oct 2026Rec. 16 Sep 2026Construction of CC Road at Road No.04&other internal Roads of seethapuram Colony in Vatluru Village Of Pedapadu mandal
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Eluru· #315432
₹5.0 L Sanctioned · 16 Oct 2026Rec. 16 Sep 2026Providing Basic amenities to existing multipurpose hall in Bavayapalem Village of Nidamarru mandal
Community buildings & public spacesConstruction of buildings for community cultural activities· Eluru· #313988
₹5.0 L Sanctioned · 15 Oct 2026Rec. 10 Sep 2026Construction of Waiting shed at Burial ground in Timmannagudem H/o of challachintalapudi village Denduluru Mandal
Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Eluru· #314255
₹2.5 L Sanctioned · 15 Oct 2026Rec. 16 Sep 2026Construction of Multipurpose hall at Mulki Mohammad Puram pulla Village of Bhimadole mandal(SC)
Community buildings & public spacesConstruction of community centers and community halls· Eluru· #317087
₹11.0 L Sanctioned · 15 Oct 2026Rec. 23 Sep 2026Construction of Burial ground in Thotapalli Village Agiripalli mandal
Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Eluru· #317210
₹20.0 L Sanctioned · 15 Oct 2026Rec. 23 Sep 2026Providing 1 MLD Microfilter and Borewell With Submersible Motar at pedagonnuru Village in Mudinepalli mandal of Eluru District (ST)
Drinking waterInstalling tube-wells and borewells· Eluru· #321688
₹40.0 L Awaiting sanction · 17 daysRec. 15 Oct 2026construction of cc road no 6 of Seethapuram colony of vatluru (v)of pedapadu (M)(SC)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Eluru· #322642
₹4.0 L Awaiting sanction · 17 daysRec. 15 Oct 2026
18th Lok Sabha MPs from Andhra Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Prabhakar Reddy Vemireddy · Nellore | 96% | 56% | 138 | 83 |
| 2 | Bastipati Nagaraju Panchalingala · Kurnool | 58% | 28% | 144 | 75 |
| 3 | Daggumalla Prasada Rao · Chittoor | 99% | 63% | 137 | 74 |
| 4 | GM Harish Balayogi · Amalapuram | 79% | 39% | 54 | 73 |
| 5 | Putta Mahesh Kumar · Eluru | 92% | 31% | 67 | 71 |
| 6 | Midhun Reddy · Rajampet | 96% | 36% | 211 | 70 |
| 7 | Maddila Gurumoorthy · Tirupati | 93% | 37% | 122 | 69 |
| 8 | B K Parthasarathi · Hindupur | 62% | 31% | 56 | 66 |
| 9 | Kinjarapu Ram Mohan Naidu · Srikakulam | 91% | 40% | 79 | 63 |
| 10 | Gumma Thanuja Rani · Araku | 71% | 55% | 30 | 58 |
| 11 | Y S Avinash Reddy · Kadapa | 83% | 33% | 58 | 57 |
| 12 | Dr Byreddy Shabari · Nandyal | 57% | 31% | 70 | 57 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.