Allocated limit
₹17.12 Cr
Median ₹14.70 Cr
Fund utilisation
91%
₹15.65 Cr recommended · 250 works
Above median (76%)
Paid to vendors
₹6.82 Cr
40% of allocation
Above median (37%)
Works completed
79
32% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP250 works
₹15.65 Cr · 91% of the ₹17.12 Cr allocated
- Sanctioned by the district237 works
95% sanctioned · took 44 days on average (due within 45 days)
- Completed79 works
₹4.57 Cr final cost · 9.8 months from recommendation on average
13 works are still awaiting sanction, 9 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 250 works worth ₹15.65 Cr, a fund utilisation of 91%, higher than 76% of 18th Lok Sabha MPs.
- The district has sanctioned 237 of them, taking 44 days on average.
- ₹6.82 Cr has been paid to vendors, 40% of the allocation.
- 79 works are complete, typically 9.8 months after recommendation. 64 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Community buildings & public spaces.
- Payments went to 35 vendors. The largest received 18%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 63/100: finishing works counts most
- Works completed 30%32Completed ÷ recommended works.
- Spending efficiency 20%67Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%91Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%81Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%40Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: sudiksa infra projects, 18% of payments across 35 vendors.
District sanction speed
98/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%98Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
250 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Submission of Technical and Cost estimates for supply , Installation and Commissioning of 20 KW Grid Connected Solar Roof Top System Near Sri Sri Sri Bala Tripura Kala Bhirava , Balaga of Sklm Municipal corporation
Electricity & lightingSetting up public non-conventional energy plants· Srikakulam· #260876
₹8.9 L Completed 22 Oct 2026Rec. 21 Jan 2026Paid ₹8.9 LConstruction of Bus Shelter building at Paraselli village, Narasannapeta mandal
Community buildings & public spacesConstruction of bus-sheds or bus-stops· Srikakulam· #251427
₹5.0 L Completed 17 Oct 2026Rec. 30 Nov 2025Paid ₹5.0 LDrilling of Bore Well and errection of pump set at Muppidi burial ground in Muppidi village, Rallapadu GP, Polaki mandal
Drinking waterInstalling tube-wells and borewells· Srikakulam· #312283
₹4.5 L Sanctioned · 14 Oct 2026Rec. 5 Sep 2026Construction of CC Road from AB Road to Vuta Balaraju House in Chintalabadavanja village, LN Peta mandal
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Srikakulam· #312292
₹5.0 L Sanctioned · 14 Oct 2026Rec. 5 Sep 2026Construction of CC Steps at Konchabadda Pond in Chompapuram village, Mukthapuram GP, Meliaputti mandal
Community buildings & public spacesConstruction of public staircase/ stair ghat for public convenience· Srikakulam· #312294
₹3.4 L Sanctioned · 14 Oct 2026Rec. 5 Sep 2026Providing 100 Nos. 36W LED Street Lights in Ravichendri village, L.N.Peta mandal
Electricity & lightingStreet lights· Srikakulam· #312299
₹4.0 L Sanctioned · 14 Oct 2026Rec. 5 Sep 2026Providing 50 No. 120W LED Street Lights in Dabbapadu village, LN Peta mandal
Electricity & lightingStreet lights· Srikakulam· #312300
₹3.1 L Sanctioned · 14 Oct 2026Rec. 5 Sep 2026Construction of Hand Borewell in SC Street, Gopalapenta village, Narasannapeta mandal.
Drinking waterInstalling hand pumps· Srikakulam· #312313
₹1.3 L Sanctioned · 14 Oct 2026Rec. 5 Sep 2026Construction of Additional Accommodationto Community Hall Building at Peddakollivalasa village, L.N.Peta mandal
Community buildings & public spacesConstruction of additional rooms and halls in the existing public and community building· Srikakulam· #312315
₹5.0 L Sanctioned · 14 Oct 2026Rec. 5 Sep 2026Construction of community hall at Nemali Narayanapuram, Ward No.2 of Palasa Kasibugga Municipality
Community buildings & public spacesConstruction of community centers and community halls· Srikakulam· #316684
₹12.5 L Sanctioned · 14 Oct 2026Rec. 21 Sep 2026Providing 120 Nos. 120W LED Street Lights at Gara GP Limits, Gara mandal and Providing 25 Nos. 120W LED Street Lights at Thonangi GP Limits, Gara mandal
Electricity & lightingStreet lights· Srikakulam· #319858
₹9.0 L Sanctioned · 14 Oct 2026Rec. 4 Oct 2026Providing 60 Nos. 120W LED Street Lights at Miriyapalli GP Limits, L.N.Peta mandal
Electricity & lightingStreet lights· Srikakulam· #319859
₹3.8 L Sanctioned · 14 Oct 2026Rec. 4 Oct 2026Extension and Erection of 16 KVA DTR etc in Tungatampara GP Limits of Hiramandalam mandal
Electricity & lightingImprovement of electricity distribution infrastructure· Srikakulam· #251294
₹6.9 L Completed 10 Oct 2026Rec. 30 Nov 2025Paid ₹6.9 LProviding Electrical Line in Makivalasa GP limits of Narasannapeta mandal.
Electricity & lightingImprovement of electricity distribution infrastructure· Srikakulam· #251424
₹2.0 L Completed 10 Oct 2026Rec. 30 Nov 2025Paid ₹2.0 LShifting of 11 KV Line in Devadi village limits and Proposed LT Line in Sivarampuram village of Narasannapeta mandal
Electricity & lightingImprovement of electricity distribution infrastructure· Srikakulam· #260863
₹1.9 L Completed 10 Oct 2026Rec. 21 Jan 2026Paid ₹1.9 L
18th Lok Sabha MPs from Andhra Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Prabhakar Reddy Vemireddy · Nellore | 96% | 56% | 138 | 83 |
| 2 | Bastipati Nagaraju Panchalingala · Kurnool | 58% | 28% | 144 | 75 |
| 3 | Daggumalla Prasada Rao · Chittoor | 99% | 63% | 137 | 74 |
| 4 | GM Harish Balayogi · Amalapuram | 79% | 39% | 54 | 73 |
| 5 | Putta Mahesh Kumar · Eluru | 92% | 31% | 67 | 71 |
| 6 | Midhun Reddy · Rajampet | 96% | 36% | 211 | 70 |
| 7 | Maddila Gurumoorthy · Tirupati | 93% | 37% | 122 | 69 |
| 8 | B K Parthasarathi · Hindupur | 62% | 31% | 56 | 66 |
| 9 | Kinjarapu Ram Mohan Naidu · Srikakulam | 91% | 40% | 79 | 63 |
| 10 | Gumma Thanuja Rani · Araku | 71% | 55% | 30 | 58 |
| 11 | Y S Avinash Reddy · Kadapa | 83% | 33% | 58 | 57 |
| 12 | Dr Byreddy Shabari · Nandyal | 57% | 31% | 70 | 57 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.