Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
99%
₹14.58 Cr recommended · 311 works
Above median (76%)
Paid to vendors
₹9.25 Cr
63% of allocation
Above median (37%)
Works completed
137
44% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP311 works
₹14.58 Cr · 99% of the ₹14.70 Cr allocated
- Sanctioned by the district224 works
72% sanctioned · took 24 days on average (due within 45 days)
- Completed137 works
₹6.79 Cr final cost · 4.5 months from recommendation on average
87 works are still awaiting sanction, 29 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 311 works worth ₹14.58 Cr, a fund utilisation of 99%, higher than 93% of 18th Lok Sabha MPs.
- The district has sanctioned 224 of them, taking 24 days on average.
- ₹9.25 Cr has been paid to vendors, 63% of the allocation.
- 137 works are complete, typically 4.5 months after recommendation. 136 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 61 vendors. The largest received 15%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 74/100: finishing works counts most
- Works completed 30%44Completed ÷ recommended works.
- Spending efficiency 20%73Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%99Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%99Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%63Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: Ravi Metal Works, 15% of payments across 61 vendors.
District sanction speed
95/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%95Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
311 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Construction of New Burial Ground Building at Ganganapalli 33rd Division in Chittoor Municipal Corporation.
Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Chittoor· #243939
₹14.4 L Completed 29 Oct 2026Rec. 25 Oct 2025Paid ₹14.4 LConstruction of Bus Shelter on Chenchuraju kandriga Road near Athuru Bus stop, Athuru GP in Nindra Mandal.
Community buildings & public spacesConstruction of bus-sheds or bus-stops· Chittoor· #303422
₹5.0 L Sanctioned · 8 Oct 2026Rec. 20 Aug 2026Construction of Protection wall at Bandivandlavooru HW to Kunchampalli AAW, Reach-1, Madhavaram GP of Yadamarri Mandal
Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Chittoor· #312905
₹5.0 L Sanctioned · 8 Oct 2026Rec. 9 Sep 2026Construction of Protection wall at Bandivandlavooru HW to Kunchampalli AAW, Reach-2, Madhavaram GP of Yadamarri Mandal.
Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Chittoor· #312906
₹2.0 L Sanctioned · 8 Oct 2026Rec. 9 Sep 2026Construction of Compound wall to ground Kheerasamudram HW of Ksheerasamudram GP in S R Puram Mandal
Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Chittoor· #313082
₹9.4 L Sanctioned · 8 Oct 2026Rec. 9 Sep 2026Construction of Pipe Culvert near Solomon house of Ksheerasamudram New Colony at Kheerasamudram GP in SR Puram Mandal
Roads & bridgesConstruction of culverts and bridges· Chittoor· #313728
₹2.0 L Sanctioned · 8 Oct 2026Rec. 12 Sep 2026Laying of CC road from Old MPP School to V Jayalakshmi House at Akkam Cheruvupalli Habitation of Gundlapalli GP in Irala Mandal
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Chittoor· #314400
₹2.5 L Sanctioned · 8 Oct 2026Rec. 12 Sep 2026Providing E-Auto Mogilivaripalle GP, Bangarupalem Mandal
HealthPurchase of vehicle for mobile dispensaries (Four, three and two wheelers)· Chittoor· #301971
₹3.1 L Completed 7 Oct 2026Rec. 9 Aug 2026Paid ₹3.1 LProviding e-autos to Ragimanupenta GP of Bangarupalem Mandal
HealthPurchase of vehicle for mobile dispensaries (Four, three and two wheelers)· Chittoor· #301976
₹3.1 L Completed 7 Oct 2026Rec. 9 Aug 2026Paid ₹3.1 LProviding e- autos to Keeramanda GP of Bangarupalem Mandal
HealthPurchase of vehicle for mobile dispensaries (Four, three and two wheelers)· Chittoor· #301977
₹3.1 L Completed 7 Oct 2026Rec. 9 Aug 2026Paid ₹3.1 LProviding e-autos to Bodabandla GP of Bangarupalem Mandal
HealthPurchase of vehicle for mobile dispensaries (Four, three and two wheelers)· Chittoor· #301979
₹3.1 L Completed 7 Oct 2026Rec. 9 Aug 2026Paid ₹3.1 LProviding e-autos to Vavilthota GP of Puthalapattu Mandal
HealthPurchase of vehicle for mobile dispensaries (Four, three and two wheelers)· Chittoor· #301980
₹3.1 L Completed 7 Oct 2026Rec. 9 Aug 2026Paid ₹3.1 LProviding e-autos to Oddepalle GP of Puthalapattu Mandal
HealthPurchase of vehicle for mobile dispensaries (Four, three and two wheelers)· Chittoor· #301981
₹3.1 L Completed 7 Oct 2026Rec. 9 Aug 2026Paid ₹3.1 LProviding e-autos to Paturu GP of Puthalapattu Mandal
HealthPurchase of vehicle for mobile dispensaries (Four, three and two wheelers)· Chittoor· #301983
₹3.1 L Completed 7 Oct 2026Rec. 9 Aug 2026Paid ₹3.1 LProviding e-autos to Thalapulapalle GP of Puthalapattu Mandal
HealthPurchase of vehicle for mobile dispensaries (Four, three and two wheelers)· Chittoor· #301984
₹3.1 L Completed 7 Oct 2026Rec. 9 Aug 2026Paid ₹3.1 L
18th Lok Sabha MPs from Andhra Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Prabhakar Reddy Vemireddy · Nellore | 96% | 56% | 138 | 83 |
| 2 | Bastipati Nagaraju Panchalingala · Kurnool | 58% | 28% | 144 | 75 |
| 3 | Daggumalla Prasada Rao · Chittoor | 99% | 63% | 137 | 74 |
| 4 | GM Harish Balayogi · Amalapuram | 79% | 39% | 54 | 73 |
| 5 | Putta Mahesh Kumar · Eluru | 92% | 31% | 67 | 71 |
| 6 | Midhun Reddy · Rajampet | 96% | 36% | 211 | 70 |
| 7 | Maddila Gurumoorthy · Tirupati | 93% | 37% | 122 | 69 |
| 8 | B K Parthasarathi · Hindupur | 62% | 31% | 56 | 66 |
| 9 | Kinjarapu Ram Mohan Naidu · Srikakulam | 91% | 40% | 79 | 63 |
| 10 | Gumma Thanuja Rani · Araku | 71% | 55% | 30 | 58 |
| 11 | Y S Avinash Reddy · Kadapa | 83% | 33% | 58 | 57 |
| 12 | Dr Byreddy Shabari · Nandyal | 57% | 31% | 70 | 57 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.