MPLADS report card · 18th Lok Sabha

Daggumalla Prasada Rao

Lok SabhaTDPChittoor · Andhra Pradesh

MP score74/10049th of 542 in the 18th Lok Sabha
3rd of 25 from Andhra Pradesh

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

99%

₹14.58 Cr recommended · 311 works
Above median (76%)

Paid to vendors

₹9.25 Cr

63% of allocation
Above median (37%)

Works completed

137

44% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP311 works

    ₹14.58 Cr · 99% of the ₹14.70 Cr allocated

  2. Sanctioned by the district224 works

    72% sanctioned · took 24 days on average (due within 45 days)

  3. Completed137 works

    ₹6.79 Cr final cost · 4.5 months from recommendation on average

87 works are still awaiting sanction, 29 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 311 works worth ₹14.58 Cr, a fund utilisation of 99%, higher than 93% of 18th Lok Sabha MPs.
  • The district has sanctioned 224 of them, taking 24 days on average.
  • ₹9.25 Cr has been paid to vendors, 63% of the allocation.
  • 137 works are complete, typically 4.5 months after recommendation. 136 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 61 vendors. The largest received 15%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 74/100: finishing works counts most

  1. Works completed 30%44Completed ÷ recommended works.
  2. Spending efficiency 20%73Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%99Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%99Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%63Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: Ravi Metal Works, 15% of payments across 61 vendors.

District sanction speed

95/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%95Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

311 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of New Burial Ground Building at Ganganapalli 33rd Division in Chittoor Municipal Corporation.

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Chittoor· #243939

    ₹14.4 L Completed 29 Oct 2026Rec. 25 Oct 2025Paid ₹14.4 L
  • Construction of Bus Shelter on Chenchuraju kandriga Road near Athuru Bus stop, Athuru GP in Nindra Mandal.

    Community buildings & public spacesConstruction of bus-sheds or bus-stops· Chittoor· #303422

    ₹5.0 L Sanctioned · 8 Oct 2026Rec. 20 Aug 2026
  • Construction of Protection wall at Bandivandlavooru HW to Kunchampalli AAW, Reach-1, Madhavaram GP of Yadamarri Mandal

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Chittoor· #312905

    ₹5.0 L Sanctioned · 8 Oct 2026Rec. 9 Sep 2026
  • Construction of Protection wall at Bandivandlavooru HW to Kunchampalli AAW, Reach-2, Madhavaram GP of Yadamarri Mandal.

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Chittoor· #312906

    ₹2.0 L Sanctioned · 8 Oct 2026Rec. 9 Sep 2026
  • Construction of Compound wall to ground Kheerasamudram HW of Ksheerasamudram GP in S R Puram Mandal

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Chittoor· #313082

    ₹9.4 L Sanctioned · 8 Oct 2026Rec. 9 Sep 2026
  • Construction of Pipe Culvert near Solomon house of Ksheerasamudram New Colony at Kheerasamudram GP in SR Puram Mandal

    Roads & bridgesConstruction of culverts and bridges· Chittoor· #313728

    ₹2.0 L Sanctioned · 8 Oct 2026Rec. 12 Sep 2026
  • Laying of CC road from Old MPP School to V Jayalakshmi House at Akkam Cheruvupalli Habitation of Gundlapalli GP in Irala Mandal

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Chittoor· #314400

    ₹2.5 L Sanctioned · 8 Oct 2026Rec. 12 Sep 2026
  • Providing E-Auto Mogilivaripalle GP, Bangarupalem Mandal

    HealthPurchase of vehicle for mobile dispensaries (Four, three and two wheelers)· Chittoor· #301971

    ₹3.1 L Completed 7 Oct 2026Rec. 9 Aug 2026Paid ₹3.1 L
  • Providing e-autos to Ragimanupenta GP of Bangarupalem Mandal

    HealthPurchase of vehicle for mobile dispensaries (Four, three and two wheelers)· Chittoor· #301976

    ₹3.1 L Completed 7 Oct 2026Rec. 9 Aug 2026Paid ₹3.1 L
  • Providing e- autos to Keeramanda GP of Bangarupalem Mandal

    HealthPurchase of vehicle for mobile dispensaries (Four, three and two wheelers)· Chittoor· #301977

    ₹3.1 L Completed 7 Oct 2026Rec. 9 Aug 2026Paid ₹3.1 L
  • Providing e-autos to Bodabandla GP of Bangarupalem Mandal

    HealthPurchase of vehicle for mobile dispensaries (Four, three and two wheelers)· Chittoor· #301979

    ₹3.1 L Completed 7 Oct 2026Rec. 9 Aug 2026Paid ₹3.1 L
  • Providing e-autos to Vavilthota GP of Puthalapattu Mandal

    HealthPurchase of vehicle for mobile dispensaries (Four, three and two wheelers)· Chittoor· #301980

    ₹3.1 L Completed 7 Oct 2026Rec. 9 Aug 2026Paid ₹3.1 L
  • Providing e-autos to Oddepalle GP of Puthalapattu Mandal

    HealthPurchase of vehicle for mobile dispensaries (Four, three and two wheelers)· Chittoor· #301981

    ₹3.1 L Completed 7 Oct 2026Rec. 9 Aug 2026Paid ₹3.1 L
  • Providing e-autos to Paturu GP of Puthalapattu Mandal

    HealthPurchase of vehicle for mobile dispensaries (Four, three and two wheelers)· Chittoor· #301983

    ₹3.1 L Completed 7 Oct 2026Rec. 9 Aug 2026Paid ₹3.1 L
  • Providing e-autos to Thalapulapalle GP of Puthalapattu Mandal

    HealthPurchase of vehicle for mobile dispensaries (Four, three and two wheelers)· Chittoor· #301984

    ₹3.1 L Completed 7 Oct 2026Rec. 9 Aug 2026Paid ₹3.1 L

18th Lok Sabha MPs from Andhra Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Prabhakar Reddy Vemireddy · Nellore96%56%13883
2Bastipati Nagaraju Panchalingala · Kurnool58%28%14475
3Daggumalla Prasada Rao · Chittoor99%63%13774
4GM Harish Balayogi · Amalapuram79%39%5473
5Putta Mahesh Kumar · Eluru92%31%6771
6Midhun Reddy · Rajampet96%36%21170
7Maddila Gurumoorthy · Tirupati93%37%12269
8B K Parthasarathi · Hindupur62%31%5666
9Kinjarapu Ram Mohan Naidu · Srikakulam91%40%7963
10Gumma Thanuja Rani · Araku71%55%3058
11Y S Avinash Reddy · Kadapa83%33%5857
12Dr Byreddy Shabari · Nandyal57%31%7057

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.