MPLADS report card · 18th Lok Sabha
Prabhakar Reddy Vemireddy
Lok Sabha
TDPSC seatNellore · Andhra Pradesh
1st of 25 from Andhra Pradesh
Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
96%
₹14.05 Cr recommended · 202 works
Above median (76%)
Paid to vendors
₹8.22 Cr
56% of allocation
Above median (37%)
Works completed
138
68% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP202 works
₹14.05 Cr · 96% of the ₹14.70 Cr allocated
- Sanctioned by the district194 works
96% sanctioned · took 26 days on average (due within 45 days)
- Completed138 works
₹8.09 Cr final cost · 7.6 months from recommendation on average
8 works are still awaiting sanction.
In plain words
What the numbers say
- Recommended 202 works worth ₹14.05 Cr, a fund utilisation of 96%, higher than 83% of 18th Lok Sabha MPs.
- The district has sanctioned 194 of them, taking 26 days on average.
- ₹8.22 Cr has been paid to vendors, 56% of the allocation.
- 138 works are complete, typically 7.6 months after recommendation. 123 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 81 vendors. The largest received 5.4%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 83/100: finishing works counts most
- Works completed 30%68Completed ÷ recommended works.
- Spending efficiency 20%98Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%96Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%89Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%56Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: T Suresh Kumar Reddy, 5.4% of payments across 81 vendors.
District sanction speed
100/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%100Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
202 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Construction of Community Hall at Thiruveedhipadu village of Dagadarthi Mandal
Community buildings & public spacesConstruction of community centers and community halls· Sri Potti Sriramulu Nellore· #316689
₹20.0 L Sanctioned · 12 Oct 2026Rec. 21 Sep 2026Extension of Pipe line at Utukur Gram Panchyat of Vidavalur Mandal
Drinking waterProviding supply pipelines for drinking water· Sri Potti Sriramulu Nellore· #316606
₹5.0 L Sanctioned · 11 Oct 2026Rec. 21 Sep 2026Construction of CC road from Kondati Bhaskar (H) to Komitla Venkata Subbareddy (H) and Doku Subbaiah (H) in Utukur GP of Vidavalur Mandal.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sri Potti Sriramulu Nellore· #316607
₹3.0 L Sanctioned · 11 Oct 2026Rec. 21 Sep 2026Construction of CC road from Bettam Veeraiah (H) to Bandaru Sivasankar (H) in Utukur GP of Vidavalur Mandal
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sri Potti Sriramulu Nellore· #316608
₹3.0 L Sanctioned · 11 Oct 2026Rec. 21 Sep 2026Construction of Mortuary Room in Buchireddypalem Municipality
Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Sri Potti Sriramulu Nellore· #316609
₹28.5 L Sanctioned · 11 Oct 2026Rec. 21 Sep 2026Construction of West & North Side Compound wall to Burial Ground in Kalayakagallu G.P of Buchireddypalem
Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Sri Potti Sriramulu Nellore· #316610
₹5.0 L Sanctioned · 11 Oct 2026Rec. 21 Sep 2026Construction of Slab culvert in Sai Kaluva near Pathavangallu village in Kodavalur Mandal
Irrigation, flood & environmentConstruction of public irrigation facilities· Sri Potti Sriramulu Nellore· #316654
₹25.0 L Sanctioned · 11 Oct 2026Rec. 21 Sep 2026Construction of Multipurpose Builing at Alurpadu Village, Kodavalur Mandal
Community buildings & public spacesConstruction of community centers and community halls· Sri Potti Sriramulu Nellore· #316656
₹10.0 L Sanctioned · 11 Oct 2026Rec. 21 Sep 2026Construction of Pipe Culvert to Yeti Kaluva in Pathallapalli village and GP of Anatha sagaram Mandal
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sri Potti Sriramulu Nellore· #316658
₹5.0 L Sanctioned · 11 Oct 2026Rec. 21 Sep 2026Providing CC road from Yeti Kaluva Pipe Culvert to Pathallapalli Village in Anathasagaram Mandal
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sri Potti Sriramulu Nellore· #316659
₹5.0 L Sanctioned · 11 Oct 2026Rec. 21 Sep 2026Providing Internal CC road From Main road To Udapa Mahendra(H) in Chiramana Village A.S.Peta Mandal
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sri Potti Sriramulu Nellore· #316661
₹5.0 L Sanctioned · 11 Oct 2026Rec. 21 Sep 2026Providing Internal CC road From Uruturu Venkateswarlu (H) To Challakolusu Malakondaiah (H) in Chiramana Village A.S.Peta Mandal
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sri Potti Sriramulu Nellore· #316662
₹5.0 L Sanctioned · 11 Oct 2026Rec. 21 Sep 2026Providing Internal CC road AT Meesaragundu Ramanaiah (H) Panatula Srinivasulu (H) & Choppavarapu Adilakshmamma (H) in Chiramana Village A.S.Peta Mandal
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sri Potti Sriramulu Nellore· #316663
₹4.2 L Sanctioned · 11 Oct 2026Rec. 21 Sep 2026Providing Internal CC road From Undela Obaiah (H) To main road in Chiramana Village A.S.Peta Mandal
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sri Potti Sriramulu Nellore· #316673
₹2.5 L Sanctioned · 11 Oct 2026Rec. 21 Sep 2026Augmentation of PWS Scheme to Mungamur Village of Bogole Mandal
Drinking waterProviding supply pipelines for drinking water· Sri Potti Sriramulu Nellore· #316690
₹25.0 L Sanctioned · 11 Oct 2026Rec. 21 Sep 2026
18th Lok Sabha MPs from Andhra Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Prabhakar Reddy Vemireddy · Nellore | 96% | 56% | 138 | 83 |
| 2 | Bastipati Nagaraju Panchalingala · Kurnool | 58% | 28% | 144 | 75 |
| 3 | Daggumalla Prasada Rao · Chittoor | 99% | 63% | 137 | 74 |
| 4 | GM Harish Balayogi · Amalapuram | 79% | 39% | 54 | 73 |
| 5 | Putta Mahesh Kumar · Eluru | 92% | 31% | 67 | 71 |
| 6 | Midhun Reddy · Rajampet | 96% | 36% | 211 | 70 |
| 7 | Maddila Gurumoorthy · Tirupati | 93% | 37% | 122 | 69 |
| 8 | B K Parthasarathi · Hindupur | 62% | 31% | 56 | 66 |
| 9 | Kinjarapu Ram Mohan Naidu · Srikakulam | 91% | 40% | 79 | 63 |
| 10 | Gumma Thanuja Rani · Araku | 71% | 55% | 30 | 58 |
| 11 | Y S Avinash Reddy · Kadapa | 83% | 33% | 58 | 57 |
| 12 | Dr Byreddy Shabari · Nandyal | 57% | 31% | 70 | 57 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.