Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
79%
₹11.55 Cr recommended · 111 works
About the median
Paid to vendors
₹5.66 Cr
39% of allocation
About the median
Works completed
54
49% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP111 works
₹11.55 Cr · 79% of the ₹14.70 Cr allocated
- Sanctioned by the district105 works
95% sanctioned · took 43 days on average (due within 45 days)
- Completed54 works
₹4.91 Cr final cost · 7.0 months from recommendation on average
6 works are still awaiting sanction, 4 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 111 works worth ₹11.55 Cr, a fund utilisation of 79%, higher than 54% of 18th Lok Sabha MPs.
- The district has sanctioned 105 of them, taking 43 days on average.
- ₹5.66 Cr has been paid to vendors, 39% of the allocation.
- 54 works are complete, typically 7.0 months after recommendation. 55 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Community buildings & public spaces.
- Payments went to 30 vendors. The largest received 20%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 73/100: finishing works counts most
- Works completed 30%49Completed ÷ recommended works.
- Spending efficiency 20%87Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%79Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%39Paid to vendors ÷ allocated limit.
- Vendor diversity 10%99How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: SRI SAI SAMHITA CONSTRUCTIONS, 20% of payments across 30 vendors.
District sanction speed
98/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%98Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
112 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
INSTALLATION OF 1.00 MLD MICRO FILTER WITH PLATFORM TO THE COMMUNITY WATER PLANT UNDER CPWS SCHEME AT YEDURLANKA (V) OF I. POLAVARAM (M)
Drinking waterInstalling community drinking water plants· Dr. B.R. Ambedkar Konaseema· #321678
₹40.0 L Awaiting sanction · 20 daysRec. 12 Oct 2026CONSTRUCTION OF COMMUNITY HALL FOR PUBLIC GRIEVENCE REDRESSAL NEAR POLICE AMARA VEERULA STHUPAM IN AMALAPURAM
Community buildings & public spacesConstruction of community centers and community halls· Dr. B.R. Ambedkar Konaseema· #319550
₹1.00 Cr Awaiting sanction · 31 daysRec. 1 Oct 2026CONSTRUCTION OF CC ROAD FROM RYALI SATYANARAYANA (H) TO RYALI SRIRAMA MURTHY (H) IN UPPUDI (V) OF KATRENIKONA (M)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dr. B.R. Ambedkar Konaseema· #255457
₹5.0 L Completed 11 Sept 2026Rec. 24 Dec 2025Paid ₹5.0 LCONSTRUCTION OF CC ROAD FROM RAMBALA GOWRI SHANKARA PRASAD (H) TO SALADI DORA BABU (H) IN UPPUDI (V) OF KATRENIKONA (M)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dr. B.R. Ambedkar Konaseema· #255458
₹5.0 L Completed 11 Sept 2026Rec. 24 Dec 2025Paid ₹5.0 LCONSTRUCTION OF CC ROAD FROM RAMBALA ESWARA RAO (H) TO RAMBALA SATYANARAYANA (H) IN UPPUDI (V) OF KATRENIKONA (M)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dr. B.R. Ambedkar Konaseema· #255459
₹5.0 L Completed 11 Sept 2026Rec. 24 Dec 2025Paid ₹5.0 LCONSTRUCTION OF ADDITIONAL ROOMS TO PRESS CLUB IN MACHAVARAM(V)
Community buildings & public spacesConstruction of community centers and community halls· Dr. B.R. Ambedkar Konaseema· #231993
₹8.6 L Completed 10 Sept 2026Rec. 7 Sep 2025Paid ₹8.6 LCONSTRUCTION OF BURIAL GROUND NEAR SHIVALAYAM IN MACHAVARAM(V) OF AMBAJIPETA(M)
Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Dr. B.R. Ambedkar Konaseema· #242986
₹5.0 L Completed 10 Sept 2026Rec. 19 Oct 2025Paid ₹5.0 LCONSTRUCTION OF CC ROAD FROM ACHANTA YESUDASU (H) TO RYALI ESWARA RAO MAKAM IN UPPUDI (V) OF KATRENIKONA (M)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dr. B.R. Ambedkar Konaseema· #255456
₹5.0 L Completed 8 Sept 2026Rec. 24 Dec 2025Paid ₹5.0 LCONSTRUCTION OF CEMENT CONCRETE ROAD FOR COMMUNITY FROM BATHULA CHINNIBABU (H) TO PATI VENKATA GOVINDHARAJU (H) IN RAMESWARAM (V) OF SAKHINETIPALLI (M)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dr. B.R. Ambedkar Konaseema· #272179
₹5.0 L Completed 8 Sept 2026Rec. 2 Mar 2026Paid ₹5.0 LCONSTRUCTION OF CC ROAD FROM CHITTALA SUBRAHMANYAM (F) TO CHITTALA GURU PRASAD (F) IN VISWESWARAYAPURAM (V) OF MALIKIPURAM (M)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dr. B.R. Ambedkar Konaseema· #275213
₹5.0 L Completed 8 Sept 2026Rec. 15 Apr 2026Paid ₹5.0 LCONSTRUCTION OF CC ROAD FROM KADALI ANANTHARAO (F) TO KADALI SRINIVAS (H) IN VISWESWARAYAPURAM (V) OF MALIKIPURAM (M)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dr. B.R. Ambedkar Konaseema· #275214
₹5.0 L Completed 8 Sept 2026Rec. 15 Apr 2026Paid ₹5.0 LCONSTRUCTION OF CC ROAD FROM REKHAPALLI VENKATA GANESH (H) TO CHELLUBOYINA RAJESWARI (F) IN VISWESWARAYAPURAM (V) OF MALIKIPURAM (M)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dr. B.R. Ambedkar Konaseema· #275215
₹5.0 L Completed 8 Sept 2026Rec. 15 Apr 2026Paid ₹5.0 LPROVIDING CC ROAD FROM NUKALA SRINU HOUSE TO ACHANTA VENKATESWARARAO HOUSE IN 6TH WARD OF AMALAPURAM MUNICIPALITY
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dr. B.R. Ambedkar Konaseema· #243009
₹4.0 L Completed 7 Sept 2026Rec. 19 Oct 2025Paid ₹4.0 LPROVIDING CC ROAD FROM BAYYAVARAPU VARMA HOUSE TO CC ROAD END IN 6TH WARD OF AMALAPURAM MUNICIPALITY
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dr. B.R. Ambedkar Konaseema· #243011
₹4.0 L Completed 7 Sept 2026Rec. 19 Oct 2025Paid ₹4.0 LCONSTRUCTION OF CC ROAD FROM GEDDADA SUBRAHMANYAM (F) TO CHELLUBOYINA SATYANARAYANA (H) IN VISWESWARAYAPURAM (V) OF MALIKIPURAM (M)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dr. B.R. Ambedkar Konaseema· #275216
₹5.0 L Completed 5 Sept 2026Rec. 21 Mar 2026Paid ₹5.0 L
18th Lok Sabha MPs from Andhra Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Prabhakar Reddy Vemireddy · Nellore | 96% | 56% | 138 | 83 |
| 2 | Bastipati Nagaraju Panchalingala · Kurnool | 58% | 28% | 144 | 75 |
| 3 | Daggumalla Prasada Rao · Chittoor | 99% | 63% | 137 | 74 |
| 4 | GM Harish Balayogi · Amalapuram | 79% | 39% | 54 | 73 |
| 5 | Putta Mahesh Kumar · Eluru | 92% | 31% | 67 | 71 |
| 6 | Midhun Reddy · Rajampet | 96% | 36% | 211 | 70 |
| 7 | Maddila Gurumoorthy · Tirupati | 93% | 37% | 122 | 69 |
| 8 | B K Parthasarathi · Hindupur | 62% | 31% | 56 | 66 |
| 9 | Kinjarapu Ram Mohan Naidu · Srikakulam | 91% | 40% | 79 | 63 |
| 10 | Gumma Thanuja Rani · Araku | 71% | 55% | 30 | 58 |
| 11 | Y S Avinash Reddy · Kadapa | 83% | 33% | 58 | 57 |
| 12 | Dr Byreddy Shabari · Nandyal | 57% | 31% | 70 | 57 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.