Allocated limit
₹14.95 Cr
Median ₹14.70 Cr
Fund utilisation
71%
₹10.60 Cr recommended · 137 works
Below median (76%)
Paid to vendors
₹8.17 Cr
55% of allocation
Above median (37%)
Works completed
30
22% of recommended
Below median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP137 works
₹10.60 Cr · 71% of the ₹14.95 Cr allocated
- Sanctioned by the district120 works
88% sanctioned · took 2.2 months on average (due within 45 days)
- Completed30 works
₹4.04 Cr final cost · 4.9 months from recommendation on average
17 works are still awaiting sanction, 17 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 137 works worth ₹10.60 Cr, a fund utilisation of 71%, higher than 41% of 18th Lok Sabha MPs.
- The district has sanctioned 120 of them, taking 2.2 months on average.
- ₹8.17 Cr has been paid to vendors, 55% of the allocation.
- 30 works are complete, typically 4.9 months after recommendation. 32 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 35 vendors. The largest received 17%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 58/100: finishing works counts most
- Works completed 30%22Completed ÷ recommended works.
- Spending efficiency 20%49Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%71Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%55Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: SRI SAI LAKSHMI CONSTRUCTIONS, 17% of payments across 35 vendors.
District sanction speed
90/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%90Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
139 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Providing Borewell and shed to RO plant at Dasaripeta village Jiyyamvalasa mandal Parvathipuram Manyam district
Drinking waterInstalling tube-wells and borewells· Parvathipuram Manyam· #283492
₹5.0 L Completed 31 Oct 2026Rec. 25 May 2026Paid ₹5.0 LProviding RO plant 2000 LPH at Dasaripeta village Jiyyamvalasa Mandal Parvathipuram manydam district
Drinking waterInstalling community drinking water plants· Parvathipuram Manyam· #283494
₹5.0 L Completed 31 Oct 2026Rec. 25 May 2026Paid ₹5.0 LConstruction of CC road and drain from Gandi Laxmi house to Ekala Laxmi house in BC Colony Makkuva GP Makkuva Mandal Parvathipuram Manyam dt
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Parvathipuram Manyam· #301223
₹5.0 L Sanctioned · 5 Sept 2026Rec. 5 Aug 2026Construction of Cc road and drain from Sakshi Vilekari Reporter house to Routh Krishna house in BC Colony Makkuva GP Makkuva Mandal Parvathipuram Manyam dt
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Parvathipuram Manyam· #301224
₹5.0 L Sanctioned · 5 Sept 2026Rec. 5 Aug 2026Construction of CC road and drain from Gudana laxmanarao house to subaramma house in BC Colony Makkuva GP Makkuva Mandal Parvathipuram Manyam dist
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Parvathipuram Manyam· #301225
₹5.0 L Sanctioned · 5 Sept 2026Rec. 5 Aug 2026Construction of CC road and drain Peddinti Padalu house to Raghumandla Prasad house in BC Colony Makkuva GP Makkuva Mandal Parvathipuram Manyam dist
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Parvathipuram Manyam· #301227
₹5.0 L Sanctioned · 5 Sept 2026Rec. 5 Aug 2026Construction of CC road and drain from Peddinti Padalu house to Edala Satyam house in BC colony makkuva Gp Makkuva mandal Parvathipuram Manyam dist
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Parvathipuram Manyam· #301228
₹5.0 L Sanctioned · 5 Sept 2026Rec. 5 Aug 2026Providing Advanced Automatic LED Solar Street Light System to Seekari Village Pedabayalu Mandal ASR dt
Electricity & lightingStreet lights· Alluri Sitharama Raju· #265265
₹40.0 L Sanctioned · 3 Sept 2026Rec. 3 Feb 2026Formation of road from Chikupadu to Rudi in Sampangipadu GP Salur mandal
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Parvathipuram Manyam· #309114
₹3.0 L Awaiting sanction · 65 daysRec. 28 Aug 2026Renovation of Anganwadi building at Nannimamidivalasa Village of Bondam GP Arakuvelley mandal
Education & librariesConstruction of rooms and halls in school and colleges· Alluri Sitharama Raju· #309163
₹9.8 L Awaiting sanction · 65 daysRec. 28 Aug 2026Formation and graveling the road from Jilledavalasa to Boddapadu Bit 1 at Jilledavalasa in Saluru mandal
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Parvathipuram Manyam· #309019
₹5.0 L Awaiting sanction · 66 daysRec. 27 Aug 2026Formation and gravelithe road from jilledavalasa to Boddapadu Bit 2 at Jilledavalasa in Salur mandal
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Parvathipuram Manyam· #309020
₹5.0 L Awaiting sanction · 66 daysRec. 27 Aug 2026Formation and graveling the road from jilledavalasa to Boddapadu Bit 3 fat Jilledavalasa in Salur mandal
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Parvathipuram Manyam· #309022
₹5.0 L Awaiting sanction · 66 daysRec. 27 Aug 2026Formation and graveling the road from Boddapadu to Bellapaka Bit 1 at Jilledavalasa in Salur mandal
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Parvathipuram Manyam· #309023
₹5.0 L Awaiting sanction · 66 daysRec. 27 Aug 2026Formation and graveling the road from Boddapadu to Bellapaka Bit 2 at Jilledavalasa in salur mandal
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Parvathipuram Manyam· #309024
₹5.0 L Awaiting sanction · 66 daysRec. 27 Aug 2026
18th Lok Sabha MPs from Andhra Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Prabhakar Reddy Vemireddy · Nellore | 96% | 56% | 138 | 83 |
| 2 | Bastipati Nagaraju Panchalingala · Kurnool | 58% | 28% | 144 | 75 |
| 3 | Daggumalla Prasada Rao · Chittoor | 99% | 63% | 137 | 74 |
| 4 | GM Harish Balayogi · Amalapuram | 79% | 39% | 54 | 73 |
| 5 | Putta Mahesh Kumar · Eluru | 92% | 31% | 67 | 71 |
| 6 | Midhun Reddy · Rajampet | 96% | 36% | 211 | 70 |
| 7 | Maddila Gurumoorthy · Tirupati | 93% | 37% | 122 | 69 |
| 8 | B K Parthasarathi · Hindupur | 62% | 31% | 56 | 66 |
| 9 | Kinjarapu Ram Mohan Naidu · Srikakulam | 91% | 40% | 79 | 63 |
| 10 | Gumma Thanuja Rani · Araku | 71% | 55% | 30 | 58 |
| 11 | Y S Avinash Reddy · Kadapa | 83% | 33% | 58 | 57 |
| 12 | Dr Byreddy Shabari · Nandyal | 57% | 31% | 70 | 57 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.