MPLADS report card · 18th Lok Sabha
Bastipati Nagaraju Panchalingala
Lok Sabha
TDPKurnool · Andhra Pradesh
2nd of 25 from Andhra Pradesh
Allocated limit
₹16.00 Cr
Median ₹14.70 Cr
Fund utilisation
58%
₹9.25 Cr recommended · 221 works
Below median (76%)
Paid to vendors
₹4.40 Cr
28% of allocation
Below median (37%)
Works completed
144
65% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP221 works
₹9.25 Cr · 58% of the ₹16.00 Cr allocated
- Sanctioned by the district158 works
71% sanctioned · took 33 days on average (due within 45 days)
- Completed144 works
₹4.40 Cr final cost · 7.5 months from recommendation on average
63 works are still awaiting sanction, 55 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 221 works worth ₹9.25 Cr, a fund utilisation of 58%, higher than 20% of 18th Lok Sabha MPs.
- The district has sanctioned 158 of them, taking 33 days on average.
- ₹4.40 Cr has been paid to vendors, 28% of the allocation.
- 144 works are complete, typically 7.5 months after recommendation. 144 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Education & libraries.
- Payments went to 8 vendors. The largest received 27%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 75/100: finishing works counts most
- Works completed 30%65Completed ÷ recommended works.
- Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%58Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%28Paid to vendors ÷ allocated limit.
- Vendor diversity 10%92How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: UMA MAHESWARA TUBE WELLS KURNOOL, 27% of payments across 8 vendors.
District sanction speed
88/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%88Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
221 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Providing CC Road (Bit-1) to Silver Kurnool Jubilee Govt. Degree College (Women's Hostel) at Kurnool in Kurnool District
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kurnool· #319924
₹5.0 L Sanctioned · 13 Oct 2026Rec. 5 Oct 2026Providing CC Road (Bit-2) to Silver Kurnool Jubilee Govt. Degree College (Cluster University) at Kurnool in Kurnool District
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kurnool· #319925
₹5.0 L Sanctioned · 13 Oct 2026Rec. 5 Oct 2026Supply of Manual Histopathaology Microtome for Histopathalogy Lab at State Cancer Institute, Kurnool
HealthPurchase of hospital equipment· Kurnool· #311120
₹10.0 L Sanctioned · 12 Oct 2026Rec. 4 Sep 2026Construction of Community Hall at Malageri, Panchalingala Village of Kurnool Mandal
Community buildings & public spacesConstruction of community centers and community halls· Kurnool· #319922
₹10.0 L Awaiting sanction · 27 daysRec. 5 Oct 2026Drilling of a new borewell for scheme source at SC Colony extension area, Inekal (V), Aspari Mandal
Drinking waterInstalling tube-wells and borewells· Kurnool· #319113
₹2.0 L Awaiting sanction · 33 daysRec. 29 Sep 2026Drilling of a new borewell for scheme source at BC Colony extension area, Inekal (V), Aspari Mandal
Drinking waterInstalling tube-wells and borewells· Kurnool· #319114
₹2.0 L Awaiting sanction · 33 daysRec. 29 Sep 2026Drilling of a new borewell for scheme source at SC Colony extension area, Veldurthy village and Mandal
Drinking waterInstalling tube-wells and borewells· Kurnool· #319115
₹2.0 L Awaiting sanction · 33 daysRec. 29 Sep 2026Drilling of a new borewell for scheme source at BC Colony extension area, Yerukalacheruvu Village, Krishnagiri Mandal
Drinking waterInstalling tube-wells and borewells· Kurnool· #319116
₹2.0 L Awaiting sanction · 33 daysRec. 29 Sep 2026Drilling of a new borewell for scheme source at Village extension area of Yerukalacheruvu(V), Krishnagiri Mandal
Drinking waterInstalling tube-wells and borewells· Kurnool· #319117
₹2.0 L Awaiting sanction · 33 daysRec. 29 Sep 2026Providing Pipeline in BC & SC colony at Virupapuram village of Adoni-1 Mandal
Drinking waterProviding supply pipelines for drinking water· Kurnool· #311139
₹4.0 L Awaiting sanction · 34 daysRec. 28 Sep 2026Construction of Community Hall in Sy.No. 203, extent: Ac. 0.18, Peddahulthi Village of Pattikonda Mandal
Community buildings & public spacesConstruction of community centers and community halls· Kurnool· #315690
₹40.0 L Awaiting sanction · 45 daysRec. 17 Sep 2026Providing drinking water pipe line from Peddaharivanam Road Junction to Santakudlur village sump of Adoni-2 (M).
Drinking waterProviding supply pipelines for drinking water· Kurnool· #311127
₹18.0 L Awaiting sanction · 58 daysRec. 4 Sep 2026Providing PWS Scheme & Pipeline near Dattatreya Swamy Temple at Virupapuram village of Adoni-1 Mandal
Drinking waterProviding supply pipelines for drinking water· Kurnool· #311129
₹3.0 L Awaiting sanction · 58 daysRec. 4 Sep 2026Repairs and Renovation at Hostel, Krishnagiri Mandal, Pattikonda Constituency
Education & librariesConstruction of rooms and halls in school and colleges· Kurnool· #194412
₹5.0 L Completed 2 Sept 2026Rec. 25 Apr 2025Paid ₹5.0 LProviding Drinking Water Purificatioin RO Plant of 2000 LPH Capacity at Banavasi Residential School at Banavasi of Yemmiganur
Drinking waterInstalling community drinking water plants· Kurnool· #274656
₹10.0 L Sanctioned · 29 Aug 2026Rec. 19 Mar 2026
18th Lok Sabha MPs from Andhra Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Prabhakar Reddy Vemireddy · Nellore | 96% | 56% | 138 | 83 |
| 2 | Bastipati Nagaraju Panchalingala · Kurnool | 58% | 28% | 144 | 75 |
| 3 | Daggumalla Prasada Rao · Chittoor | 99% | 63% | 137 | 74 |
| 4 | GM Harish Balayogi · Amalapuram | 79% | 39% | 54 | 73 |
| 5 | Putta Mahesh Kumar · Eluru | 92% | 31% | 67 | 71 |
| 6 | Midhun Reddy · Rajampet | 96% | 36% | 211 | 70 |
| 7 | Maddila Gurumoorthy · Tirupati | 93% | 37% | 122 | 69 |
| 8 | B K Parthasarathi · Hindupur | 62% | 31% | 56 | 66 |
| 9 | Kinjarapu Ram Mohan Naidu · Srikakulam | 91% | 40% | 79 | 63 |
| 10 | Gumma Thanuja Rani · Araku | 71% | 55% | 30 | 58 |
| 11 | Y S Avinash Reddy · Kadapa | 83% | 33% | 58 | 57 |
| 12 | Dr Byreddy Shabari · Nandyal | 57% | 31% | 70 | 57 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.