Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Bastipati Nagaraju Panchalingala

Lok SabhaTDPKurnool · Andhra Pradesh

MP score75/10040th of 542 in the 18th Lok Sabha
2nd of 25 from Andhra Pradesh

Allocated limit

₹16.00 Cr

Median ₹14.70 Cr

Fund utilisation

58%

₹9.25 Cr recommended · 221 works
Below median (76%)

Paid to vendors

₹4.40 Cr

28% of allocation
Below median (37%)

Works completed

144

65% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP221 works

    ₹9.25 Cr · 58% of the ₹16.00 Cr allocated

  2. Sanctioned by the district158 works

    71% sanctioned · took 33 days on average (due within 45 days)

  3. Completed144 works

    ₹4.40 Cr final cost · 7.5 months from recommendation on average

63 works are still awaiting sanction, 55 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 221 works worth ₹9.25 Cr, a fund utilisation of 58%, higher than 20% of 18th Lok Sabha MPs.
  • The district has sanctioned 158 of them, taking 33 days on average.
  • ₹4.40 Cr has been paid to vendors, 28% of the allocation.
  • 144 works are complete, typically 7.5 months after recommendation. 144 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Education & libraries.
  • Payments went to 8 vendors. The largest received 27%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 75/100: finishing works counts most

  1. Works completed 30%65Completed ÷ recommended works.
  2. Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%58Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%28Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    92
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: UMA MAHESWARA TUBE WELLS KURNOOL, 27% of payments across 8 vendors.

District sanction speed

88/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%88Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

221 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Providing CC Road (Bit-1) to Silver Kurnool Jubilee Govt. Degree College (Women's Hostel) at Kurnool in Kurnool District

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kurnool· #319924

    ₹5.0 L Sanctioned · 13 Oct 2026Rec. 5 Oct 2026
  • Providing CC Road (Bit-2) to Silver Kurnool Jubilee Govt. Degree College (Cluster University) at Kurnool in Kurnool District

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kurnool· #319925

    ₹5.0 L Sanctioned · 13 Oct 2026Rec. 5 Oct 2026
  • Supply of Manual Histopathaology Microtome for Histopathalogy Lab at State Cancer Institute, Kurnool

    HealthPurchase of hospital equipment· Kurnool· #311120

    ₹10.0 L Sanctioned · 12 Oct 2026Rec. 4 Sep 2026
  • Construction of Community Hall at Malageri, Panchalingala Village of Kurnool Mandal

    Community buildings & public spacesConstruction of community centers and community halls· Kurnool· #319922

    ₹10.0 L Awaiting sanction · 27 daysRec. 5 Oct 2026
  • Drilling of a new borewell for scheme source at SC Colony extension area, Inekal (V), Aspari Mandal

    Drinking waterInstalling tube-wells and borewells· Kurnool· #319113

    ₹2.0 L Awaiting sanction · 33 daysRec. 29 Sep 2026
  • Drilling of a new borewell for scheme source at BC Colony extension area, Inekal (V), Aspari Mandal

    Drinking waterInstalling tube-wells and borewells· Kurnool· #319114

    ₹2.0 L Awaiting sanction · 33 daysRec. 29 Sep 2026
  • Drilling of a new borewell for scheme source at SC Colony extension area, Veldurthy village and Mandal

    Drinking waterInstalling tube-wells and borewells· Kurnool· #319115

    ₹2.0 L Awaiting sanction · 33 daysRec. 29 Sep 2026
  • Drilling of a new borewell for scheme source at BC Colony extension area, Yerukalacheruvu Village, Krishnagiri Mandal

    Drinking waterInstalling tube-wells and borewells· Kurnool· #319116

    ₹2.0 L Awaiting sanction · 33 daysRec. 29 Sep 2026
  • Drilling of a new borewell for scheme source at Village extension area of Yerukalacheruvu(V), Krishnagiri Mandal

    Drinking waterInstalling tube-wells and borewells· Kurnool· #319117

    ₹2.0 L Awaiting sanction · 33 daysRec. 29 Sep 2026
  • Providing Pipeline in BC & SC colony at Virupapuram village of Adoni-1 Mandal

    Drinking waterProviding supply pipelines for drinking water· Kurnool· #311139

    ₹4.0 L Awaiting sanction · 34 daysRec. 28 Sep 2026
  • Construction of Community Hall in Sy.No. 203, extent: Ac. 0.18, Peddahulthi Village of Pattikonda Mandal

    Community buildings & public spacesConstruction of community centers and community halls· Kurnool· #315690

    ₹40.0 L Awaiting sanction · 45 daysRec. 17 Sep 2026
  • Providing drinking water pipe line from Peddaharivanam Road Junction to Santakudlur village sump of Adoni-2 (M).

    Drinking waterProviding supply pipelines for drinking water· Kurnool· #311127

    ₹18.0 L Awaiting sanction · 58 daysRec. 4 Sep 2026
  • Providing PWS Scheme & Pipeline near Dattatreya Swamy Temple at Virupapuram village of Adoni-1 Mandal

    Drinking waterProviding supply pipelines for drinking water· Kurnool· #311129

    ₹3.0 L Awaiting sanction · 58 daysRec. 4 Sep 2026
  • Repairs and Renovation at Hostel, Krishnagiri Mandal, Pattikonda Constituency

    Education & librariesConstruction of rooms and halls in school and colleges· Kurnool· #194412

    ₹5.0 L Completed 2 Sept 2026Rec. 25 Apr 2025Paid ₹5.0 L
  • Providing Drinking Water Purificatioin RO Plant of 2000 LPH Capacity at Banavasi Residential School at Banavasi of Yemmiganur

    Drinking waterInstalling community drinking water plants· Kurnool· #274656

    ₹10.0 L Sanctioned · 29 Aug 2026Rec. 19 Mar 2026

18th Lok Sabha MPs from Andhra Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Prabhakar Reddy Vemireddy · Nellore96%56%13883
2Bastipati Nagaraju Panchalingala · Kurnool58%28%14475
3Daggumalla Prasada Rao · Chittoor99%63%13774
4GM Harish Balayogi · Amalapuram79%39%5473
5Putta Mahesh Kumar · Eluru92%31%6771
6Midhun Reddy · Rajampet96%36%21170
7Maddila Gurumoorthy · Tirupati93%37%12269
8B K Parthasarathi · Hindupur62%31%5666
9Kinjarapu Ram Mohan Naidu · Srikakulam91%40%7963
10Gumma Thanuja Rani · Araku71%55%3058
11Y S Avinash Reddy · Kadapa83%33%5857
12Dr Byreddy Shabari · Nandyal57%31%7057

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.