Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Magunta Sreenivasulu Reddy

Lok SabhaOngole · Andhra Pradesh

MP score72/100424th of 539 in the 17th Lok Sabha
24th of 25 from Andhra Pradesh
Re-elected to the 18th Lok Sabha Then: 28% utilisation, 2 works completed, score 27.

Allocated limit

₹19.12 Cr

Median ₹8.60 Cr

Fund utilisation

96%

₹18.30 Cr recommended · 346 works
About the median

Paid to vendors

₹12.34 Cr

65% of allocation
Below median (88%)

Works completed

217

63% of recommended
Below median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP346 works

    ₹18.30 Cr · 96% of the ₹19.12 Cr allocated

  2. Sanctioned by the district341 works

    99% sanctioned · took 34 days on average (due within 45 days)

  3. Completed217 works

    ₹11.47 Cr final cost · 5.6 months from recommendation on average

5 works are still awaiting sanction, 5 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 346 works worth ₹18.30 Cr, a fund utilisation of 96%, higher than 35% of 17th Lok Sabha MPs.
  • The district has sanctioned 341 of them, taking 34 days on average.
  • ₹12.34 Cr has been paid to vendors, 65% of the allocation.
  • 217 works are complete, typically 5.6 months after recommendation. 63 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 129 vendors. The largest received 5.7%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 72/100: finishing works counts most

  1. Works completed 30%63Completed ÷ recommended works.
  2. Spending efficiency 20%93Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%96Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%28Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%65Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: CHAIRMAN HWC AKAVEEDU, 5.7% of payments across 129 vendors.

District sanction speed

99/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%99Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

349 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Gravelling the Road from Cherukupalli to Vagu in Basinepalli Gram Panchayat of Bestavaripeta Mandal

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Prakasam· #86077

    ₹4.8 L Completed 7 Apr 2026Rec. 20 Jan 2024Paid ₹4.8 L
  • Gravelling the Road from Vagu to Akkapalli in Basinepalli Gram Panchayat of Bestavaripeta Mandal

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Prakasam· #87735

    ₹2.2 L Completed 7 Apr 2026Rec. 20 Jan 2024Paid ₹2.2 L
  • Gravelling the Road from Akaveedu to Kothuru Road via Javuku Vagu in Akaveedu Gram Panchayat of Racherla Mandal

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Prakasam· #88415

    ₹4.7 L Completed 30 Mar 2026Rec. 20 Jan 2024Paid ₹4.7 L
  • Development of Play Ground in Government Junior College and High School in Maddipadu Village and Mandal

    Sports & fitnessDevelopment of playground· Prakasam· #117762

    ₹4.6 L Completed 13 Mar 2026Paid ₹4.6 L
  • Construction of C.C.Road from Kotapati Chenchuramaiah House to Bandla Haribabu House in Velagapudi Gram Panchayat of Tangutur Mandal

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Prakasam· #88414

    ₹5.0 L Completed 10 Mar 2026Rec. 20 Jan 2024Paid ₹5.0 L
  • Gravelling the Road from Kothapeta S.C. Colony to MP Cheruvu in MP Cheruvu Gram Panchayat of Bestavaripeta Mandal

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Prakasam· #116103

    ₹4.9 L Completed 1 Mar 2026Rec. 2 Mar 2024Paid ₹4.9 L
  • Construction of Side Drains from Guddeti Rami Reddy House to Yerasi Venkata Subba Reddy House in Gangavaram Gram Panchayat of Tallur Mandal

    Sanitation & drainageProviding drains and gutters for public drainage· Prakasam· #107296

    ₹2.5 L Completed 18 Oct 2025Rec. 16 Feb 2024Paid ₹2.5 L
  • Gravelling the Road from Kandulur to Vallur in Tangutur Mandal of Tangutur Mandal

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Prakasam· #87767

    ₹5.0 L Completed 30 Aug 2025Rec. 20 Jan 2024Paid ₹5.0 L
  • Construction of Community Hall in Bachalakurapadu Village of Konakanamitla Mandal

    Community buildings & public spacesConstruction of community centers and community halls· Prakasam· #87293

    ₹5.0 L Completed 25 Aug 2025Rec. 23 Jan 2024Paid ₹5.0 L
  • Providing of Tractor to Kanigiri Municipality

    Sanitation & drainageProviding garbage collection and disposal systems· Prakasam· #81253

    ₹9.2 L Completed 5 Aug 2025Rec. 12 Jan 2024Paid ₹9.2 L
  • Providing Trolley for lifting of Garbage to Kanigiri Municipality

    Sanitation & drainageProviding garbage collection and disposal systems· Prakasam· #81254

    ₹2.5 L Completed 5 Aug 2025Rec. 12 Jan 2024Paid ₹2.5 L
  • Construction of Building at Burial Ground in 20th Ward of Kanigiri Municipality

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Prakasam· #130081

    ₹13.2 L Completed 5 Aug 2025Rec. 15 Mar 2024Paid ₹13.2 L
  • Construction of Internal C.C.Road in Nallaguntla Gram Panchayat of Komarole Mandal

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Prakasam· #88688

    ₹2.3 L Completed 1 Aug 2025Rec. 24 Jan 2024Paid ₹2.3 L
  • Gravelling the Road from J.C. Agraharam S.C.Colony to Gantapuram in J.C. Agraharam Gram Panchayat of Bestavaripeta Mandal

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Prakasam· #96190

    ₹4.9 L Completed 1 Aug 2025Rec. 3 Feb 2024Paid ₹4.9 L
  • Providing Internal Gravel Roads in S.C. Colony of Mulaguntapadu Gram Panchayat of Singarayakonda Mandal

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Prakasam· #96330

    ₹5.0 L Completed 8 Jul 2025Rec. 3 Feb 2024Paid ₹5.0 L

17th Lok Sabha MPs from Andhra Pradesh

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Vanga Geetha Viswanath · Kakinada100%99%12799
2Pocha Brahmananda Reddy · Nandyal100%100%13798
3Srinivas Kesineni · Vijayawada89%89%9197
4Nandigam Suresh · Bapatla95%93%11897
5Dr Sanjeev Kumar Singari · Kurnool90%89%35996
6Smt Chinta Anuradha · Amalapuram98%86%17696
7Jayadev Galla · Guntur100%97%13295
8Talari Rangaiah · Anantapur87%84%19194
9Shri N Reddeppa · Chittoor96%81%14191
10Kinjarapu Ram Mohan Naidu · Srikakulam95%81%10689
11Kuruva Gorantla Madhav · Hindupur85%83%6389
12Midhun Reddy · Rajampet86%73%19689

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.