Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Magunta Sreenivasulu Reddy

Lok SabhaTDPOngole · Andhra Pradesh

MP score27/100495th of 542 in the 18th Lok Sabha
20th of 25 from Andhra Pradesh
Also an MP in the 17th Lok Sabha Then: 96% utilisation, 217 works completed, score 72.

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

28%

₹4.08 Cr recommended · 31 works
Below median (76%)

Paid to vendors

₹1.61 Cr

11% of allocation
Below median (37%)

Works completed

2

6.5% of recommended
Below median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP31 works

    ₹4.08 Cr · 28% of the ₹14.70 Cr allocated

  2. Sanctioned by the district21 works

    68% sanctioned · took 2.3 months on average (due within 45 days)

  3. Completed2 works

    ₹30.0 L final cost · 5.2 months from recommendation on average

10 works are still awaiting sanction, 7 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 31 works worth ₹4.08 Cr, a fund utilisation of 28%, higher than 4.4% of 18th Lok Sabha MPs.
  • The district has sanctioned 21 of them, taking 2.3 months on average.
  • ₹1.61 Cr has been paid to vendors, 11% of the allocation.
  • 2 works are complete, typically 5.2 months after recommendation. 3 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Community buildings & public spaces.
  • Payments went to 9 vendors. The largest received 23%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 27/100: finishing works counts most

  1. Works completed 30%6Completed ÷ recommended works.
  2. Spending efficiency 20%19Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%28Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%40Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%11Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    96
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: GOTTIPATI MADHUSUDHANA RAO, 23% of payments across 9 vendors.

District sanction speed

85/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%85Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

32 works · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of C.C.Drain and C.C.Road from Church to Junior College in S.C.Locality of Maddipadu Vilage and Mandal

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Prakasam· #2325

    ₹5.0 L Awaiting sanction · 23 daysRec. 9 Oct 2026
  • Construction of C.C.Drain and C.C.Road from P.Ludiya House to Junior College in S.C.Locality of Maddipadu Vilage and Mandal

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Prakasam· #2326

    ₹5.0 L Awaiting sanction · 23 daysRec. 9 Oct 2026
  • Construction of C.C.Road from MPDO Office to PR Circle Office Buildings Complex in Ongole

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Prakasam· #312692

    ₹11.0 L Sanctioned · 1 Oct 2026Rec. 16 Sep 2026
  • Construction of Bus Shelter in Nennurupadu Village and Gram Panchayat in Kondapi Mandal

    Community buildings & public spacesConstruction of bus-sheds or bus-stops· Prakasam· #312693

    ₹5.0 L Sanctioned · 1 Oct 2026Rec. 16 Sep 2026
  • Providing additional amenities to the Community Hall in S.C.Colony of Gurrappadiya Gram Panchayat in Kondapi Mandal

    Community buildings & public spacesConstruction of community centers and community halls· Prakasam· #312694

    ₹3.0 L Sanctioned · 1 Oct 2026Rec. 16 Sep 2026
  • Providing additional amenities to the Cultural or Community Hall Building in Singarakonda Palem Village of Addanki Mandal

    Community buildings & public spacesConstruction of buildings for community cultural activities· Prakasam· #2306

    ₹10.0 L Awaiting sanction · 36 daysRec. 26 Sep 2026
  • Construction of Internal C.C.Road near Gangamma Temple in Gandipalem village of Udayagiri Mandal

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sri Potti Sriramulu Nellore· #254763

    ₹5.0 L Completed 26 Sept 2026Paid ₹5.0 L
  • Providing Drinking Water Facility to Auto Nagar, Ongole

    Drinking waterProviding supply pipelines for drinking water· Prakasam· #312691

    ₹23.0 L Awaiting sanction · 46 daysRec. 16 Sep 2026
  • Development of Park near Police Parade Grounds in Ongole Municipal Corporation

    Community buildings & public spacesDevelopment of public parks· Prakasam· #312696

    ₹25.0 L Awaiting sanction · 46 daysRec. 16 Sep 2026
  • Installation of Fixed Garden Gym near Police Parade Grounds in Ongole Municipal Corporation

    Sports & fitnessInstallation of fixed garden gym equipment· Prakasam· #312697

    ₹20.0 L Awaiting sanction · 46 daysRec. 16 Sep 2026
  • Construction of Community Hall in Podavaripalem Village, Ponduru Gram Panchayat, Tangutur Mandal

    Community buildings & public spacesConstruction of community centers and community halls· Prakasam· #312698

    ₹15.0 L Awaiting sanction · 46 daysRec. 16 Sep 2026
  • Providing of Digital Library and Training Centre in Penubarthi Village of Ponduru Mandal

    Education & librariesConstruction of public libraries and reading rooms· Srikakulam· #2273

    ₹20.0 L Awaiting sanction · 46 daysRec. 16 Sep 2026
  • Providing an additional Block for 20 Bedded Dialysis Ward in First Floor over OT Block of New Building at Kanigiri

    HealthConstruction of rooms and facilities for hospitals, FWC , PHC Centers and ANM centers· Prakasam· #312057

    ₹40.0 L Work partially Completed · 3 Sept 2026Rec. 3 Sep 2026Paid ₹36.8 L
  • Construction of Cremation Building and Platform for cremating dead bodies at Hindu Burial Ground in Gundemadakala Village of Vinjamur Mandal

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Sri Potti Sriramulu Nellore· #2174

    ₹7.0 L Awaiting sanction · 82 daysRec. 11 Aug 2026
  • Additional amenities at District Police Training Centre, Kothamamidipalem of Ongole Town

    Community buildings & public spacesConstruction of additional rooms and halls in the existing public and community building· Prakasam· #241349

    ₹25.0 L Completed 17 Mar 2026Rec. 10 Oct 2025Paid ₹25.0 L

18th Lok Sabha MPs from Andhra Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Prabhakar Reddy Vemireddy · Nellore96%56%13883
2Bastipati Nagaraju Panchalingala · Kurnool58%28%14475
3Daggumalla Prasada Rao · Chittoor99%63%13774
4GM Harish Balayogi · Amalapuram79%39%5473
5Putta Mahesh Kumar · Eluru92%31%6771
6Midhun Reddy · Rajampet96%36%21170
7Maddila Gurumoorthy · Tirupati93%37%12269
8B K Parthasarathi · Hindupur62%31%5666
9Kinjarapu Ram Mohan Naidu · Srikakulam91%40%7963
10Gumma Thanuja Rani · Araku71%55%3058
11Y S Avinash Reddy · Kadapa83%33%5857
12Dr Byreddy Shabari · Nandyal57%31%7057

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.