Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Lavu Sri Krishna Devarayalu

Lok SabhaNarasaraopet · Andhra Pradesh

MP score77/100380th of 539 in the 17th Lok Sabha
21st of 25 from Andhra Pradesh
Re-elected to the 18th Lok Sabha Then: 42% utilisation, 1 works completed, score 22.

Allocated limit

₹8.00 Cr

Median ₹8.60 Cr

Fund utilisation

98%

₹7.85 Cr recommended · 110 works
About the median

Paid to vendors

₹5.46 Cr

68% of allocation
Below median (88%)

Works completed

70

64% of recommended
Below median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP110 works

    ₹7.85 Cr · 98% of the ₹8.00 Cr allocated

  2. Sanctioned by the district110 works

    100% sanctioned · took 25 days on average (due within 45 days)

  3. Completed70 works

    ₹5.21 Cr final cost · 11.9 months from recommendation on average

In plain words

What the numbers say

  • Recommended 110 works worth ₹7.85 Cr, a fund utilisation of 98%, higher than 51% of 17th Lok Sabha MPs.
  • The district has sanctioned 110 of them, taking 25 days on average.
  • ₹5.46 Cr has been paid to vendors, 68% of the allocation.
  • 70 works are complete, typically 11.9 months after recommendation. 36 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Community buildings & public spaces.
  • Payments went to 28 vendors. The largest received 9.1%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 77/100: finishing works counts most

  1. Works completed 30%64Completed ÷ recommended works.
  2. Spending efficiency 20%96Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%98Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%51Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%68Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: SRINIVASA REDDY PALLAPROLU, 9.1% of payments across 28 vendors.

District sanction speed

100/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%100Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

110 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of class rooms in RVSCVS High School, Chilakaluripet Town, Chilakaluripet Mandal, Palnadu Dt.

    Education & librariesConstruction of rooms and halls in school and colleges· Palnadu· #68029

    ₹19.8 L Completed 24 Oct 2026Rec. 22 Dec 2023Paid ₹19.8 L
  • Providing 1.00 MLD Micro Filter Unit to CPWS Scheme in Nekarikallu village of Nekarikallu Mandal, Palnadu Dt.

    Drinking waterInstalling community drinking water plants· Palnadu· #37465

    ₹13.9 L Completed 23 Oct 2026Rec. 16 Oct 2023Paid ₹13.9 L
  • Construction of Cause way across valleru vagu on the road from Inavolu to P. Cherukumpalem of Nuzendla Mandal

    Roads & bridgesConstruction of culverts and bridges· Palnadu· #28580

    ₹20.0 L Completed 11 May 2026Rec. 29 Sep 2023Paid ₹20.0 L
  • Providing Borewell and pipeline in Pedaturakapalem Gram Panchayat of Narasaraopet Mandal

    Drinking waterInstalling tube-wells and borewells· Palnadu· #27620

    ₹4.9 L Completed 20 Apr 2026Rec. 27 Sep 2023Paid ₹4.9 L
  • Construction of Off Take sluice at KM 3.165 on Right Bank of GBC for drawl of 0.004 TMC of Raw Water from GBC to provide drinking water facilities to Vipparlareddypalem (v)

    Drinking waterProviding supply pipelines for drinking water· Palnadu· #27876

    ₹19.5 L Completed 20 Apr 2026Rec. 28 Sep 2023Paid ₹19.5 L
  • Construction of CC side drains in ST & BC colonies (Segment-1) of Kavuru village of Chilakaluripet Mandal, Palnadu Dt.

    Sanitation & drainageProviding drains and gutters for public drainage· Palnadu· #36512

    ₹4.9 L Completed 20 Apr 2026Rec. 13 Oct 2023Paid ₹4.9 L
  • Construction of CC side drain at Brahmamgari Gudi different locations in Lingamguntla (v), h/o. Kavuru, Chilakaluripet Mandal, Palnadu Dt.

    Sanitation & drainageProviding drains and gutters for public drainage· Palnadu· #39372

    ₹4.9 L Completed 20 Apr 2026Rec. 21 Oct 2023Paid ₹4.9 L
  • Construction of Foam Pit with Foam cubes for Gymnastics hall in B.R. Stadium, Guntur town

    Sports & fitnessInstallation of multi-gym equipment· Guntur· #28668

    ₹23.7 L Completed 26 Feb 2026Rec. 29 Sep 2023Paid ₹23.7 L
  • Providing Water facilities at Collectorate in Lingamguntla Gram Panchayat in Narasaraopet Mandal, Palnadu Dt.

    Drinking waterProviding supply pipelines for drinking water· Palnadu· #39375

    ₹4.7 L Completed 1 Jan 2026Rec. 21 Oct 2023Paid ₹4.7 L
  • Construction of community hall in SC locality of Inumetla (v) h/o. Uppalapadu village, Rajupalem Mandal, Palnadu Dt.

    Community buildings & public spacesConstruction of community centers and community halls· Palnadu· #36697

    ₹15.0 L Completed 28 Oct 2025Rec. 13 Oct 2023Paid ₹15.0 L
  • Construction of Community Hall in SC colony in Malladi village of Amaravathi Mandal, Palnadu Dt.

    Community buildings & public spacesConstruction of community centers and community halls· Palnadu· #67969

    ₹14.7 L Completed 28 Oct 2025Rec. 22 Dec 2023Paid ₹14.7 L
  • Construction of Community Hall in SC locality of Ellamanda village, Narasaraopet Mandal, Palnadu Dt.

    Community buildings & public spacesConstruction of community centers and community halls· Palnadu· #36519

    ₹10.0 L Completed 23 Oct 2025Rec. 13 Oct 2023Paid ₹10.0 L
  • Construction of Community Hall in B.C Colony (Yadava) in Petasannigandla Village of Karempudi Mandal

    Community buildings & public spacesConstruction of community centers and community halls· Palnadu· #28574

    ₹3.5 L Completed 22 Oct 2025Rec. 29 Sep 2023Paid ₹3.5 L
  • Providing CC Road and CC Drains in SC Colony, Tumrukota Village of Rentachintala Mandal

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Palnadu· #28600

    ₹15.0 L Completed 22 Oct 2025Rec. 29 Sep 2023Paid ₹15.0 L
  • Construction of Community Hall in ST Locality In Peddareddypalem Village H/o Mulakar Village Narasaraopet Mandal

    Community buildings & public spacesConstruction of community centers and community halls· Palnadu· #28601

    ₹10.0 L Completed 22 Oct 2025Rec. 29 Sep 2023Paid ₹10.0 L

17th Lok Sabha MPs from Andhra Pradesh

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Vanga Geetha Viswanath · Kakinada100%99%12799
2Pocha Brahmananda Reddy · Nandyal100%100%13798
3Srinivas Kesineni · Vijayawada89%89%9197
4Nandigam Suresh · Bapatla95%93%11897
5Dr Sanjeev Kumar Singari · Kurnool90%89%35996
6Smt Chinta Anuradha · Amalapuram98%86%17696
7Jayadev Galla · Guntur100%97%13295
8Talari Rangaiah · Anantapur87%84%19194
9Shri N Reddeppa · Chittoor96%81%14191
10Kinjarapu Ram Mohan Naidu · Srikakulam95%81%10689
11Kuruva Gorantla Madhav · Hindupur85%83%6389
12Midhun Reddy · Rajampet86%73%19689

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.