Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Balashowry Vallabbhaneni

Lok SabhaMachilipatnam · Andhra Pradesh

MP score70/100449th of 539 in the 17th Lok Sabha
25th of 25 from Andhra Pradesh
Re-elected to the 18th Lok Sabha Then: 31% utilisation, 9 works completed, score 24.

Allocated limit

₹9.81 Cr

Median ₹8.60 Cr

Fund utilisation

78%

₹7.62 Cr recommended · 94 works
Below median (98%)

Paid to vendors

₹6.10 Cr

62% of allocation
Below median (88%)

Works completed

76

81% of recommended
About the median

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP94 works

    ₹7.62 Cr · 78% of the ₹9.81 Cr allocated

  2. Sanctioned by the district92 works

    98% sanctioned · took 2.5 months on average (due within 45 days)

  3. Completed76 works

    ₹5.31 Cr final cost · 10.0 months from recommendation on average

2 works are still awaiting sanction, 2 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 94 works worth ₹7.62 Cr, a fund utilisation of 78%, higher than 5.6% of 17th Lok Sabha MPs.
  • The district has sanctioned 92 of them, taking 2.5 months on average.
  • ₹6.10 Cr has been paid to vendors, 62% of the allocation.
  • 76 works are complete, typically 10.0 months after recommendation. 5 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 43 vendors. The largest received 9.0%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 70/100: finishing works counts most

  1. Works completed 30%81Completed ÷ recommended works.
  2. Spending efficiency 20%87Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%78Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%4Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%62Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: Nalluri Subbarao, 9.0% of payments across 43 vendors.

District sanction speed

94/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%94Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

96 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of community hall building at Zamidaggumilli village of Pamarru Mandal

    Community buildings & public spacesConstruction of community centers and community halls· Krishna· #64822

    ₹8.3 L Completed 29 Mar 2026Rec. 18 Dec 2023Paid ₹8.3 L
  • providing additional amenities to the community halll in Chakrayapalem village of Kollipara Mandal in Guntur District

    Community buildings & public spacesConstruction of additional rooms and halls in the existing public and community building· Guntur· #68129

    ₹22.4 L Completed 11 Mar 2026Paid ₹22.4 L
  • Construction of multi purpose hall in muslim locality of Challapalli Village in Challapalli Mandal

    Community buildings & public spacesConstruction of community centers and community halls· Krishna· #66715

    ₹12.9 L Completed 28 Feb 2026Rec. 20 Dec 2023Paid ₹12.9 L
  • Construction of single lane road bridge at KM 6.500 on Mangaleru medium drain at Ganapeswaram Village of Nagayalanka Mandal

    Roads & bridgesConstruction of culverts and bridges· Krishna· #70169

    ₹55.0 L Completed 21 Feb 2026Rec. 27 Dec 2023Paid ₹55.0 L
  • Construction of ramp to Harijanawada cheruvu in Barankula, H/o. Ganapeswaram Village in Nagayalanka Mandal

    Drinking waterConstruction of water tanks· Krishna· #66656

    ₹2.4 L Completed 26 Sept 2025Rec. 20 Dec 2023Paid ₹2.4 L
  • Construction of ramp to Pantakaluva at Rajakula colony in Barankula, H/o. Ganapeswaram Village in Nagayalanka Mandal

    Drinking waterConstruction of water tanks· Krishna· #66670

    ₹2.5 L Completed 26 Sept 2025Rec. 20 Dec 2023Paid ₹2.5 L
  • Construction of community hall building in Chinavani gudem, H/o. Seepudi Village of Gudiwada Mandal

    Community buildings & public spacesConstruction of community centers and community halls· Krishna· #70149

    ₹17.8 L Completed 22 Sept 2025Rec. 27 Dec 2023Paid ₹17.8 L
  • Providing 0.5 MLD Micro filter with its platform to CPWS scheme in Edurumondi village of Ngayalanka Mandal

    Drinking waterInstalling community drinking water plants· Krishna· #66642

    ₹10.0 L Vendor Identification · 19 Sept 2025Rec. 20 Dec 2023Paid ₹8.2 L
  • Providing CC road from R&B road to Manne Koteswara Rao house in Vanukuru Village of Penamalur Mandal

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Krishna· #66680

    ₹5.0 L Completed 9 Sept 2025Rec. 20 Dec 2023Paid ₹5.0 L
  • Providing CC road from Manne Koteswara Rao house to Nalakurthi Rani house in Vanukuru Village of Penamalur Mandal

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Krishna· #66684

    ₹5.0 L Completed 9 Sept 2025Rec. 20 Dec 2023Paid ₹5.0 L
  • Providing CC road from Nalakurthi Rani house to Songa Gurupadam house in Vanukuru Village of Penamalur Mandal

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Krishna· #66692

    ₹3.1 L Completed 9 Sept 2025Rec. 20 Dec 2023Paid ₹3.1 L
  • Construction of CC road from Elementary school to Shivaji house in Manthena Village of Kankipadu Mandal

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Krishna· #64911

    ₹5.0 L Completed 26 Jun 2025Rec. 18 Dec 2023Paid ₹5.0 L
  • Providing GSB road from Vanamala Srinivasa Rao house to Vanamala Galidevudu cheruvu in Sorlagondi Village of Nagayalanka Mandal

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Krishna· #96910

    ₹5.0 L Completed 25 Jun 2025Rec. 5 Feb 2024Paid ₹5.0 L
  • Providing GSB road from Galidevudu cheruvu to Tammu Venkateswara rao sea food company in Sorlagondi Village of Nagayalanka Mandal

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Krishna· #96912

    ₹5.0 L Completed 25 Jun 2025Rec. 5 Feb 2024Paid ₹5.0 L
  • Providing GSB road from Tammu Venkateswara Rao sea food company to Naidu Muktheswara rao motor in Sorlagondi Village of Nagayalanka Mandal

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Krishna· #96916

    ₹5.0 L Completed 25 Jun 2025Rec. 5 Feb 2024Paid ₹5.0 L

17th Lok Sabha MPs from Andhra Pradesh

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Vanga Geetha Viswanath · Kakinada100%99%12799
2Pocha Brahmananda Reddy · Nandyal100%100%13798
3Srinivas Kesineni · Vijayawada89%89%9197
4Nandigam Suresh · Bapatla95%93%11897
5Dr Sanjeev Kumar Singari · Kurnool90%89%35996
6Smt Chinta Anuradha · Amalapuram98%86%17696
7Jayadev Galla · Guntur100%97%13295
8Talari Rangaiah · Anantapur87%84%19194
9Shri N Reddeppa · Chittoor96%81%14191
10Kinjarapu Ram Mohan Naidu · Srikakulam95%81%10689
11Kuruva Gorantla Madhav · Hindupur85%83%6389
12Midhun Reddy · Rajampet86%73%19689

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.