Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Balashowry Vallabbhaneni

Lok SabhaJSPMachilipatnam · Andhra Pradesh

MP score24/100502nd of 542 in the 18th Lok Sabha
21st of 25 from Andhra Pradesh
Also an MP in the 17th Lok Sabha Then: 78% utilisation, 76 works completed, score 70.

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

31%

₹4.58 Cr recommended · 69 works
Below median (76%)

Paid to vendors

₹1.70 Cr

12% of allocation
Below median (37%)

Works completed

9

13% of recommended
Below median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP69 works

    ₹4.58 Cr · 31% of the ₹14.70 Cr allocated

  2. Sanctioned by the district53 works

    77% sanctioned · took 2.4 months on average (due within 45 days)

  3. Completed9 works

    ₹33.0 L final cost · 13.0 months from recommendation on average

16 works are still awaiting sanction, 10 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 69 works worth ₹4.58 Cr, a fund utilisation of 31%, higher than 4.8% of 18th Lok Sabha MPs.
  • The district has sanctioned 53 of them, taking 2.4 months on average.
  • ₹1.70 Cr has been paid to vendors, 12% of the allocation.
  • 9 works are complete, typically 13.0 months after recommendation.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 15 vendors. The largest received 15%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 24/100: finishing works counts most

  1. Works completed 30%13Completed ÷ recommended works.
  2. Spending efficiency 20%19Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%31Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%0Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%12Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: Sai Brothers and Co, 15% of payments across 15 vendors.

District sanction speed

88/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%88Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

70 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Service line charges in Vakkapatla varipalem, H/o. Nangegadda, Nagayalanka Mandal in Krishna District

    Electricity & lightingImprovement of electricity distribution infrastructure· Krishna· #320954

    ₹3.9 L Awaiting sanction · 24 daysRec. 8 Oct 2026
  • Restoration of shutters for cross regulator at KM 4.000 on Atukuru UT medium drain at China lingala village, Nandiwada Mandal in Krishna District

    Irrigation, flood & environmentConstruction of public irrigation facilities· Krishna· #320958

    ₹7.6 L Awaiting sanction · 24 daysRec. 8 Oct 2026
  • to upgrade the load capacity for 2 existing LT category-3 service connections in Seethanapalli, H/o. Kruthivennu (v) & (M) of Krishna District

    Electricity & lightingImprovement of electricity distribution infrastructure· Krishna· #321008

    ₹14.9 L Awaiting sanction · 24 daysRec. 8 Oct 2026
  • Construction of CC road with one side drain from Pratti Mariyadas house to Erramsetti Srinivas site in Mutluru village Vatticherukur Mandala in Guntur District

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #2305

    ₹2.0 L Awaiting sanction · 36 daysRec. 26 Sep 2026
  • Construction of side drains from Kovvvuri Ademma site to Cheruvu kalava in Mutluru village of Vatticherukuru Mandal in Guntur District

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #2299

    ₹3.0 L Awaiting sanction · 36 daysRec. 26 Sep 2026
  • Construction of CC road and drain from Gaddam Balaswamy house to Shobanadri house in Mutluru village, Vatticherukuru Mandal in Guntur District

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #2300

    ₹2.5 L Awaiting sanction · 36 daysRec. 26 Sep 2026
  • Providing PWS scheme in Mallampudi, H/o. Chorampudivillage in Bantumilli Mandal in Krishna District

    Drinking waterConstruction of water tanks· Krishna· #314059

    ₹35.0 L Sanctioned · 22 Sept 2026Rec. 10 Sep 2026
  • providing LED street lights in Chevendra village of Pedana Mandal in Krishna District

    Electricity & lightingStreet lights· Krishna· #286262

    ₹5.0 L Sanctioned · 21 Sept 2026Rec. 17 Jun 2026
  • Providing LED street lights in Ullipalem village of Koduru Mandal in Krishna District

    Electricity & lightingStreet lights· Krishna· #286263

    ₹5.0 L Sanctioned · 21 Sept 2026Rec. 17 Jun 2026
  • Providing LED street lights in Vinnakota village of Gudlavalleru Mandal in Krishna District

    Electricity & lightingStreet lights· Krishna· #286264

    ₹5.0 L Sanctioned · 21 Sept 2026Rec. 17 Jun 2026
  • Providing LED street lights in Polatitippa village of Machilipatnam Mandal in Krishna District

    Electricity & lightingStreet lights· Krishna· #286265

    ₹5.0 L Sanctioned · 21 Sept 2026Rec. 17 Jun 2026
  • Providing LED street lights in Pendurru village of Bantumilli Mandal in Krishna District

    Electricity & lightingStreet lights· Krishna· #286271

    ₹5.0 L Sanctioned · 21 Sept 2026Rec. 17 Jun 2026
  • Extension of pipeline to uncovered households in Kamalapuram village of Pedana Mandal in Krishna District

    Drinking waterProviding supply pipelines for drinking water· Krishna· #286590

    ₹5.0 L Sanctioned · 21 Sept 2026Rec. 17 Jun 2026
  • Extension of pipeline from Anganwadi centre to OHSR tank in Chinagollapalem Village of Kruthivennu Mandal in Krishna District

    Drinking waterProviding supply pipelines for drinking water· Krishna· #286599

    ₹5.0 L Sanctioned · 21 Sept 2026Rec. 17 Jun 2026
  • Construction of RCC shelter in BC burial ground in Vadlamannadu village of Gudlavalleru Mandal in Krishna District

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Krishna· #314064

    ₹5.0 L Awaiting sanction · 52 daysRec. 10 Sep 2026

18th Lok Sabha MPs from Andhra Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Prabhakar Reddy Vemireddy · Nellore96%56%13883
2Bastipati Nagaraju Panchalingala · Kurnool58%28%14475
3Daggumalla Prasada Rao · Chittoor99%63%13774
4GM Harish Balayogi · Amalapuram79%39%5473
5Putta Mahesh Kumar · Eluru92%31%6771
6Midhun Reddy · Rajampet96%36%21170
7Maddila Gurumoorthy · Tirupati93%37%12269
8B K Parthasarathi · Hindupur62%31%5666
9Kinjarapu Ram Mohan Naidu · Srikakulam91%40%7963
10Gumma Thanuja Rani · Araku71%55%3058
11Y S Avinash Reddy · Kadapa83%33%5857
12Dr Byreddy Shabari · Nandyal57%31%7057

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.