Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Y S Avinash Reddy

Lok SabhaKadapa · Andhra Pradesh

MP score87/100222nd of 539 in the 17th Lok Sabha
14th of 25 from Andhra Pradesh
Re-elected to the 18th Lok Sabha Then: 83% utilisation, 58 works completed, score 57.

Allocated limit

₹10.08 Cr

Median ₹8.60 Cr

Fund utilisation

93%

₹9.39 Cr recommended · 132 works
About the median

Paid to vendors

₹8.00 Cr

79% of allocation
Below median (88%)

Works completed

98

74% of recommended
Below median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP132 works

    ₹9.39 Cr · 93% of the ₹10.08 Cr allocated

  2. Sanctioned by the district132 works

    100% sanctioned · took 3.1 months on average (due within 45 days)

  3. Completed98 works

    ₹7.17 Cr final cost · 8.7 months from recommendation on average

In plain words

What the numbers say

  • Recommended 132 works worth ₹9.39 Cr, a fund utilisation of 93%, higher than 25% of 17th Lok Sabha MPs.
  • The district has sanctioned 132 of them, taking 3.1 months on average.
  • ₹8.00 Cr has been paid to vendors, 79% of the allocation.
  • 98 works are complete, typically 8.7 months after recommendation. 98 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 60 vendors. The largest received 12%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 87/100: finishing works counts most

  1. Works completed 30%74Completed ÷ recommended works.
  2. Spending efficiency 20%90Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%93Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%79Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: BADVELI PRABHAKAR REDDY, 12% of payments across 60 vendors.

District sanction speed

92/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%92Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

132 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Providing New CC Road from 39/257-1-1 to 39/238-2, SC Colony and 36/343-1 to 36/349 at Ashok Nagar

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Y.S.R. Kadapa· #23301

    ₹2.8 L Completed 11 May 2026Rec. 20 Sep 2023Paid ₹2.8 L
  • Formation of Gravel Road from Itrampeta main road to TGP canal in Itrampeta GP of B. Kodur Mandal

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Y.S.R. Kadapa· #166586

    ₹2.0 L Sanctioned · 20 Apr 2026Rec. 29 Jun 2023
  • Formation of Gravel Road from Balarami reddy Mango gardens to Ayacut fields in Kattakindhipalli Village of Chintarapalli GP of Kalasapadu Mandal

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Y.S.R. Kadapa· #166588

    ₹2.0 L Sanctioned · 20 Apr 2026Rec. 29 Jun 2023
  • Formation of Gravel road from Gopavaramappli to Ayakattu fields in Gopavaram Village of Chennupalli GP of Kalasapadu

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Y.S.R. Kadapa· #166589

    ₹2.0 L Sanctioned · 20 Apr 2026Rec. 29 Jun 2023
  • Formation of Gravel Road from Nakkalagandi and Thangedepalli to Thottigaripalli in Thiruvengalapuram GP of Badvel Mandal

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Y.S.R. Kadapa· #166591

    ₹2.0 L Sanctioned · 20 Apr 2026Rec. 29 Jun 2023
  • Laying of CC Road from Aarmbh Apartment to Prkruthi Nagar

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Y.S.R. Kadapa· #23314

    ₹3.9 L Completed 17 Oct 2025Rec. 20 Sep 2023Paid ₹3.9 L
  • Providing CC Drain with cover slabs from Bus Stop to Vanam Street in Chennur GP & (M)

    Sanitation & drainageProviding drains and gutters for public drainage· Y.S.R. Kadapa· #11313

    ₹28.4 L Completed 10 Sept 2025Rec. 19 Aug 2023Paid ₹28.4 L
  • Construction of CC Drain and CC Road in Ramakrishna nagar 40th Division KMC

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Y.S.R. Kadapa· #166258

    ₹4.0 L Completed 21 Aug 2025Rec. 29 Jun 2023Paid ₹4.0 L
  • Providing of CC Road from near slauther house in 28th division of Kadapa MC

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Y.S.R. Kadapa· #166267

    ₹4.0 L Completed 28 Jul 2025Rec. 29 Jun 2023Paid ₹4.0 L
  • Laying of CC Road and drain from Oraghunatha Reddy house ot S.Ramachandra Reddy house, Alankhanapalli Kadapa (M)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Y.S.R. Kadapa· #166294

    ₹4.5 L Completed 28 Jul 2025Rec. 29 Jun 2023Paid ₹4.5 L
  • Laying of CC Road and drain Chennakesava Reddy house to Manhidar Reddy house, Alankhanapalli Kadapa (M)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Y.S.R. Kadapa· #166298

    ₹4.0 L Completed 28 Jul 2025Rec. 29 Jun 2023Paid ₹4.0 L
  • Providing New CC Road from 84/74-1 to 84/56 to 84/56-1, 84/58 to 84/67, 84/61-1 to 84/59, to 84/58-1 at Nadimpally

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Y.S.R. Kadapa· #23303

    ₹4.0 L Completed 12 May 2025Rec. 20 Sep 2023Paid ₹4.0 L
  • Sacntion of Drilling of Borewell to Nayak Saheb street (Adaighar) Kadapa Town YSR District

    Drinking waterInstalling tube-wells and borewells· Y.S.R. Kadapa· #166300

    ₹3.2 L Completed 12 May 2025Rec. 29 Jun 2023Paid ₹3.2 L
  • Sanction of Drilling of Borewell to Badhulla Sahib Makan, Kadapa Town, YSR District

    Drinking waterInstalling tube-wells and borewells· Y.S.R. Kadapa· #166302

    ₹3.2 L Completed 12 May 2025Rec. 29 Jun 2023Paid ₹3.2 L
  • Sanction of RO Plant to Diguvapalli (V) Valluru (M)

    Drinking waterInstalling community drinking water plants· Y.S.R. Kadapa· #42095

    ₹6.2 L Completed 27 Feb 2025Rec. 30 Oct 2023Paid ₹6.2 L

17th Lok Sabha MPs from Andhra Pradesh

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Vanga Geetha Viswanath · Kakinada100%99%12799
2Pocha Brahmananda Reddy · Nandyal100%100%13798
3Srinivas Kesineni · Vijayawada89%89%9197
4Nandigam Suresh · Bapatla95%93%11897
5Dr Sanjeev Kumar Singari · Kurnool90%89%35996
6Smt Chinta Anuradha · Amalapuram98%86%17696
7Jayadev Galla · Guntur100%97%13295
8Talari Rangaiah · Anantapur87%84%19194
9Shri N Reddeppa · Chittoor96%81%14191
10Kinjarapu Ram Mohan Naidu · Srikakulam95%81%10689
11Kuruva Gorantla Madhav · Hindupur85%83%6389
12Midhun Reddy · Rajampet86%73%19689

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.