Works waiting for sanction
22 recommended works are still awaiting sanction more than 45 days later. Sanction is the district authority’s responsibility.
Allocated limit
₹15.99 Cr
Median ₹14.70 Cr
Fund utilisation
43%
₹6.90 Cr recommended · 40 works
Below median (76%)
Paid to vendors
₹63.3 L
4.0% of allocation
Below median (37%)
Works completed
1
2.5% of recommended
Below median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP40 works
₹6.90 Cr · 43% of the ₹15.99 Cr allocated
- Sanctioned by the district14 works
35% sanctioned · took 32 days on average (due within 45 days)
- Completed1 works
₹32.9 L final cost · 6.2 months from recommendation on average
26 works are still awaiting sanction, 22 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 40 works worth ₹6.90 Cr, a fund utilisation of 43%, higher than 8.7% of 18th Lok Sabha MPs.
- The district has sanctioned 14 of them, taking 32 days on average.
- ₹63.3 L has been paid to vendors, 4.0% of the allocation.
- 1 works are complete, typically 6.2 months after recommendation. 1 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Community buildings & public spaces.
- Payments went to 3 vendors. The largest received 52%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 23/100: finishing works counts most
- Works completed 30%3Completed ÷ recommended works.
- Spending efficiency 20%52Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%43Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%20Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%4Paid to vendors ÷ allocated limit.
- Vendor diversity 10%Not enough dataHow spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: Power Solutions, 52% of payments across 3 vendors.
District sanction speed
73/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%73Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
40 works · tap “Photos” to see geo-tagged photos from eSAKSHI
construction of rcc roofed ground floor community hall opp urban primary health centre
Community buildings & public spacesConstruction of community centers and community halls· Ntr· #318935
₹28.0 L Awaiting sanction · 33 daysRec. 29 Sep 2026construction of rcc roofed ground floor community hall in the open space located in uma colony near old elsr
Community buildings & public spacesConstruction of community centers and community halls· Ntr· #318936
₹28.0 L Awaiting sanction · 33 daysRec. 29 Sep 2026construction of rcc roofed ground floor community hall near anganwadi centre at anasagaram
Community buildings & public spacesConstruction of community centers and community halls· Ntr· #318938
₹28.0 L Awaiting sanction · 33 daysRec. 29 Sep 2026providing compound wall approach road and roomat the christian burial ground near pallagiri municipal dumping yard
Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Ntr· #318947
₹16.0 L Awaiting sanction · 33 daysRec. 29 Sep 2026Construction of cc road from pathangi ramudu to pathangi gaanga raju tiruvuru rural mandal rajugudem vavilala
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ntr· #312404
₹2.0 L Awaiting sanction · 58 daysRec. 4 Sep 2026construction of cc road from kavati venkat to rayala ramulu tiruvuru rural vavilala rajugudem
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ntr· #312406
₹2.0 L Awaiting sanction · 58 daysRec. 4 Sep 2026construction of cc road from kattineni jaggayya to nagaiah tiruvuru rural vavilala rajugudem
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ntr· #312407
₹2.0 L Awaiting sanction · 58 daysRec. 4 Sep 2026construction of cc road from gandra rambabu to anil spatta tiruvuru rural vavilala rajugudem
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ntr· #312408
₹2.0 L Awaiting sanction · 58 daysRec. 4 Sep 2026construction of cc road from r&b road to gandi chruvu and other internal roads in peddavaram village tiruvurumandal
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ntr· #312409
₹2.0 L Awaiting sanction · 58 daysRec. 4 Sep 2026construction of cc road from r&b road to gogula krisgnaiah house in peddavaram village tiruvuru mandal
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ntr· #312410
₹2.0 L Awaiting sanction · 58 daysRec. 4 Sep 2026construction of cc road from r&b road to tasuboyina suramma house and other internal roads in peddavaram village tiruvuru mandal
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ntr· #312411
₹2.0 L Awaiting sanction · 58 daysRec. 4 Sep 2026construction of cc road from gunja pullaiah house to narayanapurapu lakshmaiah house in koduru village of a.konduru mandal
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ntr· #312412
₹10.0 L Awaiting sanction · 58 daysRec. 4 Sep 2026construction of two vents 1000 mm dia.pipe culvert on Manilla Vagu of gollamandala village, A.Kondur Mandal,
Irrigation, flood & environmentConstruction of public irrigation facilities· Ntr· #285880
₹5.0 L Sanctioned · 29 Aug 2026Rec. 15 Jun 2026construction of mahila bar association building at the bezawada bar association
Community buildings & public spacesConstruction of community centers and community halls· Ntr· #301023
₹30.0 L Sanctioned · 29 Aug 2026Rec. 3 Aug 2026construction of cc roads in 5 and 6 wards in vissannapeta
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ntr· #303732
₹8.4 L Awaiting sanction · 80 daysRec. 13 Aug 2026
18th Lok Sabha MPs from Andhra Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Prabhakar Reddy Vemireddy · Nellore | 96% | 56% | 138 | 83 |
| 2 | Bastipati Nagaraju Panchalingala · Kurnool | 58% | 28% | 144 | 75 |
| 3 | Daggumalla Prasada Rao · Chittoor | 99% | 63% | 137 | 74 |
| 4 | GM Harish Balayogi · Amalapuram | 79% | 39% | 54 | 73 |
| 5 | Putta Mahesh Kumar · Eluru | 92% | 31% | 67 | 71 |
| 6 | Midhun Reddy · Rajampet | 96% | 36% | 211 | 70 |
| 7 | Maddila Gurumoorthy · Tirupati | 93% | 37% | 122 | 69 |
| 8 | B K Parthasarathi · Hindupur | 62% | 31% | 56 | 66 |
| 9 | Kinjarapu Ram Mohan Naidu · Srikakulam | 91% | 40% | 79 | 63 |
| 10 | Gumma Thanuja Rani · Araku | 71% | 55% | 30 | 58 |
| 11 | Y S Avinash Reddy · Kadapa | 83% | 33% | 58 | 57 |
| 12 | Dr Byreddy Shabari · Nandyal | 57% | 31% | 70 | 57 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.