15th of 25 from Andhra Pradesh
Allocated limit
₹9.39 Cr
Median ₹8.60 Cr
Fund utilisation
85%
₹8.02 Cr recommended · 100 works
Below median (98%)
Paid to vendors
₹6.81 Cr
72% of allocation
Below median (88%)
Works completed
75
75% of recommended
Below median (83%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP100 works
₹8.02 Cr · 85% of the ₹9.39 Cr allocated
- Sanctioned by the district99 works
99% sanctioned · took 23 days on average (due within 45 days)
- Completed75 works
₹6.54 Cr final cost · 10.5 months from recommendation on average
1 works are still awaiting sanction, 1 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 100 works worth ₹8.02 Cr, a fund utilisation of 85%, higher than 9.7% of 17th Lok Sabha MPs.
- The district has sanctioned 99 of them, taking 23 days on average.
- ₹6.81 Cr has been paid to vendors, 72% of the allocation.
- 75 works are complete, typically 10.5 months after recommendation. 74 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 44 vendors. The largest received 9.9%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 87/100: finishing works counts most
- Works completed 30%75Completed ÷ recommended works.
- Spending efficiency 20%96Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%85Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%99Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%72Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: Duranta Solar System, 9.9% of payments across 44 vendors.
District sanction speed
100/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%100Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
100 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Construction of CC Road from Toofan Centre road to K.Subramanyam House in Allimadugu H/o Chukkalanidigallu, Srikalahasti Mandal.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Tirupati· #98773
₹4.4 L Completed 24 Apr 2026Rec. 6 Feb 2024Paid ₹4.4 LConstruction of Compound Wall to Burial Ground in Kasumuru GP, Venkatachalam Mandal
Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Sri Potti Sriramulu Nellore· #52738
₹16.8 L Completed 24 Mar 2026Rec. 25 Nov 2023Paid ₹16.8 LProviding RO Plant Shed, Bore Well, Motor, Pipeline etc., in Pigilam Village of Pigilam GP in Balayapalli Mandal.
Drinking waterInstalling community drinking water plants· Tirupati· #68188
₹5.0 L Completed 9 Jan 2026Rec. 22 Dec 2023Paid ₹5.0 LProviding RO Plant Machinery to Pigilam Village of Pigilam GP in Balayapalli Mandal
Drinking waterInstalling community drinking water plants· Tirupati· #68189
₹2.5 L Completed 9 Jan 2026Rec. 22 Dec 2023Paid ₹2.5 LProviding Reading room in Rachapalem SC Colony of Rachapalem GP of Ozili Mandal.
Education & librariesConstruction of public libraries and reading rooms· Tirupati· #51619
₹5.0 L Completed 6 Dec 2025Rec. 22 Nov 2023Paid ₹5.0 LConstruction of Bus Shelter at Peddapariya Railway Station of Peddapariya GP of Ozili Mandal.
Community buildings & public spacesConstruction of bus-sheds or bus-stops· Tirupati· #51620
₹4.8 L Completed 6 Dec 2025Rec. 22 Nov 2023Paid ₹4.8 LConstruction of CC road from PN Road to PN Road (via) Bandarupalli, Koppaiah Kandriga, Anjimedu road from KM 4/7 to 5/2 (CTMD-222) in Yerpedu Mandal of Tirupati District.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Tirupati· #57088
₹43.1 L Completed 10 Nov 2025Rec. 6 Dec 2023Paid ₹43.1 LConstruction of internal CC Roads from Nagamma House to Gangamma Temple at Talarivettu ST Colony of Talarivettu GP in B.N.Kandriga Mandal.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Tirupati· #51606
₹2.5 L Completed 3 Nov 2025Rec. 22 Nov 2023Paid ₹2.5 LConstruction of internal CC Roads from Venkatesh House to Rathnaiah House at Talarivettu SC Colony of Talarivettu GP in B.N.Kandriga Mandal.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Tirupati· #51607
₹2.5 L Completed 3 Nov 2025Rec. 22 Nov 2023Paid ₹2.5 LConstruction of 40KL OHSR in Varagali ST Colony of Varagali GP in Chillakur Mandal.
Drinking waterInstalling community drinking water plants· Tirupati· #51617
₹34.6 L Completed 17 Sept 2025Rec. 22 Nov 2023Paid ₹34.6 LConstruction of Community Hall in S.V.Auto Nagar, Tirupati.
Community buildings & public spacesConstruction of community centers and community halls· Tirupati· #100026
₹9.9 L Completed 24 Jul 2025Rec. 8 Feb 2024Paid ₹9.9 LConstruction of CC Road from D.Ravindra house to D.Srinivasulu house in Marlapalli Village, Naidupeta Mandal.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Tirupati· #68182
₹4.3 L Completed 7 Jul 2025Rec. 22 Dec 2023Paid ₹4.3 LConstruction of CC Road from T.Ramulamma House to G.Vamsi House in Santhavellore ST Colony of Santhavellore GP in Varadaiahapalem Mandal.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Tirupati· #52622
₹5.0 L Completed 12 May 2025Rec. 24 Nov 2023Paid ₹5.0 LConstruction of CC Road from Water Tank to Yellaiah House in Santhavellore ST Colony of Santhavellore GP in Varadaiahapalem Mandal.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Tirupati· #52623
₹5.0 L Completed 12 May 2025Rec. 24 Nov 2023Paid ₹5.0 LConstruction of CC Road from P.Latha House to P.Chengamma House at Santhavellore West H/W in Santhavellore GP of Varadaiahapalem Mandal.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Tirupati· #52631
₹5.0 L Completed 12 May 2025Rec. 24 Nov 2023Paid ₹5.0 L
17th Lok Sabha MPs from Andhra Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Vanga Geetha Viswanath · Kakinada | 100% | 99% | 127 | 99 |
| 2 | Pocha Brahmananda Reddy · Nandyal | 100% | 100% | 137 | 98 |
| 3 | Srinivas Kesineni · Vijayawada | 89% | 89% | 91 | 97 |
| 4 | Nandigam Suresh · Bapatla | 95% | 93% | 118 | 97 |
| 5 | Dr Sanjeev Kumar Singari · Kurnool | 90% | 89% | 359 | 96 |
| 6 | Smt Chinta Anuradha · Amalapuram | 98% | 86% | 176 | 96 |
| 7 | Jayadev Galla · Guntur | 100% | 97% | 132 | 95 |
| 8 | Talari Rangaiah · Anantapur | 87% | 84% | 191 | 94 |
| 9 | Shri N Reddeppa · Chittoor | 96% | 81% | 141 | 91 |
| 10 | Kinjarapu Ram Mohan Naidu · Srikakulam | 95% | 81% | 106 | 89 |
| 11 | Kuruva Gorantla Madhav · Hindupur | 85% | 83% | 63 | 89 |
| 12 | Midhun Reddy · Rajampet | 86% | 73% | 196 | 89 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.