Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Dr Chandra Sekhar Pemmasani

Lok SabhaTDPGuntur · Andhra Pradesh

MP score50/100361st of 542 in the 18th Lok Sabha
17th of 25 from Andhra Pradesh

Allocated limit

₹15.98 Cr

Median ₹14.70 Cr

Fund utilisation

58%

₹9.33 Cr recommended · 95 works
Below median (76%)

Paid to vendors

₹5.58 Cr

35% of allocation
Below median (37%)

Works completed

16

17% of recommended
Below median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP95 works

    ₹9.33 Cr · 58% of the ₹15.98 Cr allocated

  2. Sanctioned by the district95 works

    100% sanctioned · took 5.1 months on average (due within 45 days)

  3. Completed16 works

    ₹2.11 Cr final cost · 14.5 months from recommendation on average

In plain words

What the numbers say

  • Recommended 95 works worth ₹9.33 Cr, a fund utilisation of 58%, higher than 21% of 18th Lok Sabha MPs.
  • The district has sanctioned 95 of them, taking 5.1 months on average.
  • ₹5.58 Cr has been paid to vendors, 35% of the allocation.
  • 16 works are complete, typically 14.5 months after recommendation. 16 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Community buildings & public spaces.
  • Payments went to 46 vendors. The largest received 12%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 50/100: finishing works counts most

  1. Works completed 30%17Completed ÷ recommended works.
  2. Spending efficiency 20%38Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%58Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%35Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: Mahammad Abdul Rahim, 12% of payments across 46 vendors.

District sanction speed

83/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%83Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

95 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Providing Classrooms for SRR Municipal Corporation High School (28172600932) Gujjanagundla in Division No 39 AE 2 Section of Guntur Municipal Corporation

    Education & librariesConstruction of rooms and halls in school and colleges· Guntur· #185946

    ₹25.0 L Completed 10 Oct 2026Rec. 30 Mar 2025Paid ₹25.0 L
  • Anjuman-E-Islamia Skill Development centre for development of Skills in Muslim Minority Youth

    Community buildings & public spacesConstruction of community centers and community halls· Guntur· #227147

    ₹30.0 L Completed 10 Oct 2026Rec. 24 Aug 2025Paid ₹30.0 L
  • Small Animals Anaesthetic Machine with ventilator and with Isoflurane vaporizer for Govt Veterinary Poly Clinic, Guntur

    HealthSetting up mobile labs and clinics for animals including sex sorted semen technology· Guntur· #189406

    ₹6.6 L Completed 5 Oct 2026Rec. 4 Apr 2025Paid ₹6.6 L
  • Providing CC Road from a) Kolakaluri Durga Rao (H) to Kinnera Krishnaiah (H) b) Kolakaluri Durga Rao (H) to SC Colony main road c) Parchuri Sambasiva Rao (H) to Sakamuri Murali Krishna (H) in Burripalem Village, Tenali Mandal

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #319191

    ₹5.0 L Vendor Identification · 30 Sept 2026Rec. 30 Sep 2026Paid ₹4.9 L
  • Providing CC Road from a) Peravali Ankamma Rao (H) to Makkam Rama Devi (H) b) Gopisetty Veeraiah (H) to Munnangi Raghu Ramaiah (H) in Burripalem Village, Tenali Mandal

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #319194

    ₹5.0 L Vendor Identification · 30 Sept 2026Rec. 30 Sep 2026Paid ₹4.9 L
  • Providing internal CC roads in Pamulapadu (V) of Tadikonda Mandal, Guntur District

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #169812

    ₹4.8 L Completed 26 Sept 2026Rec. 6 Feb 2025Paid ₹4.8 L
  • Providing internal CC roads in Vemavaram (V) of Phirangipuram Mandal, Guntur District

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #169818

    ₹4.8 L Completed 26 Sept 2026Rec. 6 Feb 2025Paid ₹4.8 L
  • Construction of Karma shala building in Hindu Burial ground at Vengalayapalem (V) of Guntur Rural Mandal, Guntur District

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Guntur· #170942

    ₹9.3 L Completed 26 Sept 2026Rec. 6 Feb 2025Paid ₹9.3 L
  • Construction of CC road with drain from Paleti Sivaiah (H) to Kandula Mahesh (H) in Kornepadu (v) in Vatticherukuru (M), Guntur District

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #219428

    ₹14.6 L Completed 26 Sept 2026Rec. 10 Aug 2025Paid ₹14.6 L
  • Construction of compound wall on the North side of Hindu Burial Ground in 4th Ward of Tenali Municipality

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Guntur· #270332

    ₹20.0 L Sanctioned · 19 Aug 2026Rec. 1 Mar 2026
  • Construction of community hall in Kothareddypalem Indira Colony (BC Area) in Chebrolu (V) and (M)

    Community buildings & public spacesConstruction of community centers and community halls· Guntur· #251061

    ₹20.0 L Sanctioned · 14 Aug 2026Rec. 30 Nov 2025
  • Providing CC road from Puttaiah rice mill to Ghanibabu house at 27th ward in Ponnur Municipality

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #260765

    ₹5.0 L Vendor Identification · 14 Aug 2026Rec. 21 Jan 2026Paid ₹4.4 L
  • Providing CC Road from backside of Dandaru Srinu House to end at 27th Ward in Ponnur Municipality

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #260766

    ₹4.0 L Vendor Identification · 14 Aug 2026Rec. 21 Jan 2026Paid ₹3.9 L
  • Construction of CC drain from Yarasani Sivaiah house to Eluri Koteswara Rao House at 29th Ward in Ponnur Municipality

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #260767

    ₹5.0 L Vendor Identification · 14 Aug 2026Rec. 21 Jan 2026Paid ₹4.0 L
  • Construction of cremation shed and compound wall in Varagani village of Prathipadu Mandal Guntur District

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Guntur· #268963

    ₹15.0 L Sanctioned · 14 Aug 2026Rec. 1 Mar 2026

18th Lok Sabha MPs from Andhra Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Prabhakar Reddy Vemireddy · Nellore96%56%13883
2Bastipati Nagaraju Panchalingala · Kurnool58%28%14475
3Daggumalla Prasada Rao · Chittoor99%63%13774
4GM Harish Balayogi · Amalapuram79%39%5473
5Putta Mahesh Kumar · Eluru92%31%6771
6Midhun Reddy · Rajampet96%36%21170
7Maddila Gurumoorthy · Tirupati93%37%12269
8B K Parthasarathi · Hindupur62%31%5666
9Kinjarapu Ram Mohan Naidu · Srikakulam91%40%7963
10Gumma Thanuja Rani · Araku71%55%3058
11Y S Avinash Reddy · Kadapa83%33%5857
12Dr Byreddy Shabari · Nandyal57%31%7057

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.