Allocated limit
₹15.98 Cr
Median ₹14.70 Cr
Fund utilisation
58%
₹9.33 Cr recommended · 95 works
Below median (76%)
Paid to vendors
₹5.58 Cr
35% of allocation
Below median (37%)
Works completed
16
17% of recommended
Below median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP95 works
₹9.33 Cr · 58% of the ₹15.98 Cr allocated
- Sanctioned by the district95 works
100% sanctioned · took 5.1 months on average (due within 45 days)
- Completed16 works
₹2.11 Cr final cost · 14.5 months from recommendation on average
In plain words
What the numbers say
- Recommended 95 works worth ₹9.33 Cr, a fund utilisation of 58%, higher than 21% of 18th Lok Sabha MPs.
- The district has sanctioned 95 of them, taking 5.1 months on average.
- ₹5.58 Cr has been paid to vendors, 35% of the allocation.
- 16 works are complete, typically 14.5 months after recommendation. 16 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Community buildings & public spaces.
- Payments went to 46 vendors. The largest received 12%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 50/100: finishing works counts most
- Works completed 30%17Completed ÷ recommended works.
- Spending efficiency 20%38Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%58Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%35Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: Mahammad Abdul Rahim, 12% of payments across 46 vendors.
District sanction speed
83/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%83Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
95 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Providing Classrooms for SRR Municipal Corporation High School (28172600932) Gujjanagundla in Division No 39 AE 2 Section of Guntur Municipal Corporation
Education & librariesConstruction of rooms and halls in school and colleges· Guntur· #185946
₹25.0 L Completed 10 Oct 2026Rec. 30 Mar 2025Paid ₹25.0 LAnjuman-E-Islamia Skill Development centre for development of Skills in Muslim Minority Youth
Community buildings & public spacesConstruction of community centers and community halls· Guntur· #227147
₹30.0 L Completed 10 Oct 2026Rec. 24 Aug 2025Paid ₹30.0 LSmall Animals Anaesthetic Machine with ventilator and with Isoflurane vaporizer for Govt Veterinary Poly Clinic, Guntur
HealthSetting up mobile labs and clinics for animals including sex sorted semen technology· Guntur· #189406
₹6.6 L Completed 5 Oct 2026Rec. 4 Apr 2025Paid ₹6.6 LProviding CC Road from a) Kolakaluri Durga Rao (H) to Kinnera Krishnaiah (H) b) Kolakaluri Durga Rao (H) to SC Colony main road c) Parchuri Sambasiva Rao (H) to Sakamuri Murali Krishna (H) in Burripalem Village, Tenali Mandal
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #319191
₹5.0 L Vendor Identification · 30 Sept 2026Rec. 30 Sep 2026Paid ₹4.9 LProviding CC Road from a) Peravali Ankamma Rao (H) to Makkam Rama Devi (H) b) Gopisetty Veeraiah (H) to Munnangi Raghu Ramaiah (H) in Burripalem Village, Tenali Mandal
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #319194
₹5.0 L Vendor Identification · 30 Sept 2026Rec. 30 Sep 2026Paid ₹4.9 LProviding internal CC roads in Pamulapadu (V) of Tadikonda Mandal, Guntur District
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #169812
₹4.8 L Completed 26 Sept 2026Rec. 6 Feb 2025Paid ₹4.8 LProviding internal CC roads in Vemavaram (V) of Phirangipuram Mandal, Guntur District
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #169818
₹4.8 L Completed 26 Sept 2026Rec. 6 Feb 2025Paid ₹4.8 LConstruction of Karma shala building in Hindu Burial ground at Vengalayapalem (V) of Guntur Rural Mandal, Guntur District
Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Guntur· #170942
₹9.3 L Completed 26 Sept 2026Rec. 6 Feb 2025Paid ₹9.3 LConstruction of CC road with drain from Paleti Sivaiah (H) to Kandula Mahesh (H) in Kornepadu (v) in Vatticherukuru (M), Guntur District
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #219428
₹14.6 L Completed 26 Sept 2026Rec. 10 Aug 2025Paid ₹14.6 LConstruction of compound wall on the North side of Hindu Burial Ground in 4th Ward of Tenali Municipality
Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Guntur· #270332
₹20.0 L Sanctioned · 19 Aug 2026Rec. 1 Mar 2026Construction of community hall in Kothareddypalem Indira Colony (BC Area) in Chebrolu (V) and (M)
Community buildings & public spacesConstruction of community centers and community halls· Guntur· #251061
₹20.0 L Sanctioned · 14 Aug 2026Rec. 30 Nov 2025Providing CC road from Puttaiah rice mill to Ghanibabu house at 27th ward in Ponnur Municipality
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #260765
₹5.0 L Vendor Identification · 14 Aug 2026Rec. 21 Jan 2026Paid ₹4.4 LProviding CC Road from backside of Dandaru Srinu House to end at 27th Ward in Ponnur Municipality
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #260766
₹4.0 L Vendor Identification · 14 Aug 2026Rec. 21 Jan 2026Paid ₹3.9 LConstruction of CC drain from Yarasani Sivaiah house to Eluri Koteswara Rao House at 29th Ward in Ponnur Municipality
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guntur· #260767
₹5.0 L Vendor Identification · 14 Aug 2026Rec. 21 Jan 2026Paid ₹4.0 LConstruction of cremation shed and compound wall in Varagani village of Prathipadu Mandal Guntur District
Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Guntur· #268963
₹15.0 L Sanctioned · 14 Aug 2026Rec. 1 Mar 2026
18th Lok Sabha MPs from Andhra Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Prabhakar Reddy Vemireddy · Nellore | 96% | 56% | 138 | 83 |
| 2 | Bastipati Nagaraju Panchalingala · Kurnool | 58% | 28% | 144 | 75 |
| 3 | Daggumalla Prasada Rao · Chittoor | 99% | 63% | 137 | 74 |
| 4 | GM Harish Balayogi · Amalapuram | 79% | 39% | 54 | 73 |
| 5 | Putta Mahesh Kumar · Eluru | 92% | 31% | 67 | 71 |
| 6 | Midhun Reddy · Rajampet | 96% | 36% | 211 | 70 |
| 7 | Maddila Gurumoorthy · Tirupati | 93% | 37% | 122 | 69 |
| 8 | B K Parthasarathi · Hindupur | 62% | 31% | 56 | 66 |
| 9 | Kinjarapu Ram Mohan Naidu · Srikakulam | 91% | 40% | 79 | 63 |
| 10 | Gumma Thanuja Rani · Araku | 71% | 55% | 30 | 58 |
| 11 | Y S Avinash Reddy · Kadapa | 83% | 33% | 58 | 57 |
| 12 | Dr Byreddy Shabari · Nandyal | 57% | 31% | 70 | 57 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.