This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Asaduddin Owaisi

Lok SabhaHyderabad · Telangana

MP score67/100461st of 539 in the 17th Lok Sabha
12th of 16 from Telangana
Re-elected to the 18th Lok Sabha Then: 80% utilisation, 1 works completed, score 28.
  • Payments concentrated with one vendor

    67% of vendor payments went to A F Construction op by Ismail.

Allocated limit

₹15.51 Cr

Median ₹8.60 Cr

Fund utilisation

96%

₹14.86 Cr recommended · 69 works
About the median

Paid to vendors

₹10.80 Cr

70% of allocation
Below median (88%)

Works completed

32

46% of recommended
Below median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP69 works

    ₹14.86 Cr · 96% of the ₹15.51 Cr allocated

  2. Sanctioned by the district58 works

    84% sanctioned · took 10.9 months on average (due within 45 days)

  3. Completed32 works

    ₹7.32 Cr final cost · 25.6 months from recommendation on average

11 works are still awaiting sanction, 11 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 69 works worth ₹14.86 Cr, a fund utilisation of 96%, higher than 35% of 17th Lok Sabha MPs.
  • The district has sanctioned 58 of them, taking 10.9 months on average.
  • ₹10.80 Cr has been paid to vendors, 70% of the allocation.
  • 32 works are complete, typically 25.6 months after recommendation. 31 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Sanitation & drainage.
  • Payments went to 8 vendors. The largest received 67%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 67/100: finishing works counts most

  1. Works completed 30%46Completed ÷ recommended works.
  2. Spending efficiency 20%68Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%96Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%97Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%70Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    41
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: A F Construction op by Ismail, 67% of payments across 8 vendors.

District sanction speed

47/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%47Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

69 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction and remodeling of ODA community hall in Khaji Galli under Golconda-67, Ward-9, Div No.13, KZ, GHMC

    Community buildings & public spacesConstruction of community centers and community halls· Hyderabad· #212652

    ₹18.5 L Vendor Identification · 8 Sept 2026Rec. 4 Feb 2023Paid ₹10.4 L
  • Providing of Multi Gym Equipment/materials at GHMC Sports Complex, Chandulal Baradari, Bahadurpura, Hyderabad

    Sports & fitnessInstallation of multi-gym equipment· Hyderabad· #128173

    ₹50.0 L Vendor Identification · 10 Feb 2026Rec. 14 Mar 2024Paid ₹37.5 L
  • Drilling of 6 .5 inch dia Power bore well and fixing of motor with pump set along with required cable etc. Construction of Room with Partition for RO plant along with pipeline to connect RO plant and CC Camera. Safe Drinking water project with RO Technology 2000 LPH, SS Tank and automatic water vending machine and water Chiller, near Opp Mehraj Cafe, Talab Katta, Hyderabad.

    Drinking waterInstalling tube-wells and borewells· Hyderabad· #212667

    ₹8.2 L Sanctioned · 10 Feb 2026Rec. 4 Feb 2023
  • Drilling of 6 .5 inch dia Power bore well and fixing of motor with pump set along with required cable etc. Construction of Room with Partition for RO plant along with pipeline to connect RO plant and CC Camera. Safe Drinking water project with RO Technology 2000 LPH, SS Tank and automatic water vending machine and water Chiller, Beside Govt.Primary School, Somnath Temple, Aman Nagar A, Hyderabad.

    Drinking waterInstalling tube-wells and borewells· Hyderabad· #212669

    ₹8.2 L Sanctioned · 10 Feb 2026Rec. 4 Feb 2023
  • Drilling of 6 .5 inch dia Power bore well and fixing of motor with pump set along with required cable etc. Construction of Room with Partition for RO plant along with pipeline to connect RO plant and CC Camera. Safe Drinking water project with RO Technology 2000 LPH, SS Tank and automatic water vending machine and water Chiller, Mama Bakhtawar Huts, Yakutpura, Hyderabad.

    Drinking waterInstalling tube-wells and borewells· Hyderabad· #212670

    ₹8.2 L Sanctioned · 10 Feb 2026Rec. 4 Feb 2023
  • Drilling of 6 .5 inch dia Power bore well and fixing of motor with pump set along with required cable etc. Construction of Room with Partition for RO plant along with pipeline to connect RO plant and CC Camera. Safe Drinking water project with RO Technology 2000 LPH, SS Tank and automatic water vending machine and water Chiller, near Central Bank, Yakutpura Railway Station Road, Rain Bazar, Hyderabad.

    Drinking waterInstalling tube-wells and borewells· Hyderabad· #212668

    ₹7.0 L Completed 5 Feb 2026Rec. 4 Feb 2023Paid ₹7.0 L
  • Laying of NP3 pipe drain line from H.No.17-5-115 to H.No.17-5-110 & by lanes in Kali Masjid lane in Dabeerpura Div Yakutpura Constituency.

    Sanitation & drainageProviding drains and gutters for public drainage· Hyderabad· #71828

    ₹21.0 L Completed 2 Feb 2026Rec. 30 Dec 2023Paid ₹21.0 L
  • Laying of 300 mm dia SWG pipe line and CC road from H.No.18-7-316/B/9, 18-7-316/B/52, 18-7-312/1/D/45 to H.No.18-7-309/36/37, 18-7-394/A and by-lanes in Aman Nagar-A, Pathergatti Divn. Yakutpura Assembly Constituency, Hyderabad

    Sanitation & drainageProviding drains and gutters for public drainage· Hyderabad· #71907

    ₹30.0 L Completed 2 Feb 2026Rec. 30 Dec 2023Paid ₹30.0 L
  • Laying of SWG pipe line and CC road from H.No.18-7-312/14/2 to H.No.18-7-312/34 in Aman Nagar-A, Pathergatti Divn. Yakutpura Assembly Constituency, Hyderabad

    Sanitation & drainageProviding drains and gutters for public drainage· Hyderabad· #71908

    ₹42.0 L Completed 2 Feb 2026Rec. 30 Dec 2023Paid ₹42.0 L
  • Laying of SWG pipe line and CC road Restoration from H.No.18-7-423/A/41, H.No.18-7-423/A/164 to H.No.18-7-423/A/302 in Aman Nagar-B, Talabchanchala Divn. Yakutpura Assembly Constituency, Hyderabad

    Sanitation & drainageProviding drains and gutters for public drainage· Hyderabad· #71909

    ₹33.6 L Completed 2 Feb 2026Rec. 30 Dec 2023Paid ₹33.6 L
  • Laying of 450mm dia NP3 pipe line and CC road from H.No.18-7-425/A/439/2 to 18-7-423/17/42 and bylanes in Aman Nagar-B, Talabchanchala Divn. Yakutpura Assembly Constituency, Hyderabad

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hyderabad· #71910

    ₹15.0 L Completed 2 Feb 2026Rec. 30 Dec 2023Paid ₹15.0 L
  • Laying of SWG pipe line and CC road from H.No.18-7-212/30/38, 18-7-212/30/34, 8-7-212/30/27 to 18-7-212/28/1/4 and bylanes in Jahangir Nagar, Moghalpura Divn. Yakutpura Assembly Constituency, Hyderabad

    Sanitation & drainageProviding drains and gutters for public drainage· Hyderabad· #71911

    ₹20.0 L Completed 2 Feb 2026Rec. 30 Dec 2023Paid ₹20.0 L
  • Laying of 250mm dia SWG pipe line from Mansoor Bakery to H.No.17-3-400 in SRT Colony, Rein Bazar Divn. Yakutpura Assembly Constituency, Hyderabad

    Sanitation & drainageProviding drains and gutters for public drainage· Hyderabad· #71912

    ₹8.5 L Completed 2 Feb 2026Rec. 30 Dec 2023Paid ₹8.5 L
  • Laying of 250mm dia SWG pipe line from H.No.17-3-194/91, 17-3-194/6, 17-3-194/55/2, 17-3-194/41 to 17-3-194/50 and 17-3-194/44 in Madina Nagar, Rein Bazar Divn. Yakutpura Assembly Constituency.

    Sanitation & drainageProviding drains and gutters for public drainage· Hyderabad· #71913

    ₹12.5 L Completed 2 Feb 2026Rec. 30 Dec 2023Paid ₹12.5 L
  • Laying of 250mm dia SWG pipe line in Ganga Nagar, Rein Bazar Divn. Yakutpura Assembly, Hyderabad.

    Sanitation & drainageProviding drains and gutters for public drainage· Hyderabad· #71916

    ₹13.0 L Completed 2 Feb 2026Rec. 30 Dec 2023Paid ₹13.0 L

17th Lok Sabha MPs from Telangana

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Ramulu Pothuganti · Nagarkurnool99%81%15890
2Smt Kavitha Malothu · Mahabubabad100%80%16187
3Shri Komati Reddy Venkat Reddy · Bhongir89%87%35685
4Gaddam Ranjith Reddy · Chelvella100%82%17485
5Anumula Revanth Reddy · Malkajgiri100%68%2884
6Uttam Kumar Nalamada Reddy · Nalgonda100%96%27083
7Venkatesh Netha Borlakunta · Peddapalle99%75%26479
8Dayakar Pasunoori · Warangel96%88%22678
9Bheemrao Baswanthrao Patil · Zahirabad100%68%39976
10Nama Nageswara Rao · Khammam87%71%19373
11Sanjay Kumar Bandi · Karimnagar99%58%29473
12Asaduddin Owaisi · Hyderabad96%70%3267

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.