Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Shri Komati Reddy Venkat Reddy

Lok SabhaBhongir · Telangana

MP score85/100269th of 539 in the 17th Lok Sabha
3rd of 16 from Telangana

Allocated limit

₹9.80 Cr

Median ₹8.60 Cr

Fund utilisation

89%

₹8.75 Cr recommended · 374 works
Below median (98%)

Paid to vendors

₹8.50 Cr

87% of allocation
About the median

Works completed

356

95% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP374 works

    ₹8.75 Cr · 89% of the ₹9.80 Cr allocated

  2. Sanctioned by the district359 works

    96% sanctioned · took 6.7 months on average (due within 45 days)

  3. Completed356 works

    ₹8.45 Cr final cost · 8.7 months from recommendation on average

15 works are still awaiting sanction, 15 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 374 works worth ₹8.75 Cr, a fund utilisation of 89%, higher than 16% of 17th Lok Sabha MPs.
  • The district has sanctioned 359 of them, taking 6.7 months on average.
  • ₹8.50 Cr has been paid to vendors, 87% of the allocation.
  • 356 works are complete, typically 8.7 months after recommendation. 127 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 47 vendors. The largest received 26%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 85/100: finishing works counts most

  1. Works completed 30%95Completed ÷ recommended works.
  2. Spending efficiency 20%99Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%89Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%36Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%87Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    93
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: DORNALA ANJAIAH, 26% of payments across 47 vendors.

District sanction speed

73/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%73Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

374 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Laying of Drainage construction work from Paka Chandraiah house to Main Road, 8th ward at Cherial municipality

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Siddipet· #59730

    ₹2.2 L Completed 2 Mar 2026Rec. 9 Dec 2023Paid ₹2.2 L
  • Laying of Drainage construction work from Yaata Nagaiah house to Main Road, 8th ward, at Cherialmunicipality

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Siddipet· #59731

    ₹2.2 L Completed 2 Mar 2026Rec. 9 Dec 2023Paid ₹2.2 L
  • Laying of Drainage construction work from Jakkula Laxmi house to Manga Shankar house, 16th ward at Janagaon Municipality

    Sanitation & drainageProviding drains and gutters for public drainage· Jangoan· #59705

    ₹4.1 L Completed 2 Feb 2026Rec. 9 Dec 2023Paid ₹4.1 L
  • Laying of CC Road from 30 ft Road to Y.Ram Reddy House at Road No.6 at Vishnunagar Colony at Hayathnagar of Rangareddy Dist

    Community buildings & public spacesConstruction of community centers and community halls· Ranga Reddy· #174882

    ₹5.0 L Sanctioned · 16 Sept 2025Rec. 3 Oct 2023
  • Laying of CC road From Temple to Main Road in Mothkur (V)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Yadadri Bhuvanagiri· #59602

    ₹5.0 L Completed 12 Sept 2025Rec. 9 Dec 2023Paid ₹5.0 L
  • Laying of CC Road from BattulaRashekar Reddy House to BachuNarsimha House at GaddaMallaiahguda (V)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ranga Reddy· #60304

    ₹3.8 L Completed 6 Aug 2025Rec. 11 Dec 2023Paid ₹3.8 L
  • Providing of LED Street Lights in Medipally (V)Laying of CC road from KummariHemalatha house to Narre Anjaiah House at GaddaMallaiahguda (V)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ranga Reddy· #60305

    ₹4.0 L Completed 6 Aug 2025Rec. 11 Dec 2023Paid ₹4.0 L
  • Laying of construction compound wall for General community hall at Veeravalli Village

    Community buildings & public spacesConstruction of community centers and community halls· Yadadri Bhuvanagiri· #59056

    ₹5.0 L Completed 9 Jul 2025Rec. 8 Dec 2023Paid ₹5.0 L
  • Laying of CC Road from Venkatamma(H) to Modala Parmesh(H) at Velugupally (V)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Suryapet· #174884

    ₹5.0 L Completed 16 Jun 2025Rec. 3 Oct 2023Paid ₹5.0 L
  • Providng of 2 Shetters in Peddachruvu at Akaram (V) Shaligouraram Mandal &Nalgonda District

    Agriculture & animal careSetting up processing plants, cold storages,etc for fish and fisheries products for community use· Nalgonda· #59359

    ₹2.0 L Completed 12 Jun 2025Rec. 9 Dec 2023Paid ₹2.0 L
  • Laying of CC road from DurgaLaxmaiah (H) to Mathangi Yellaiah (H) at Koppole (V)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nalgonda· #59428

    ₹2.0 L Completed 30 May 2025Rec. 9 Dec 2023Paid ₹2.0 L
  • Construction of Under Ground Drainage from Munugoti Saidul (H) to Akkenapally Anjam (H) in Cherukupally (V)

    Sanitation & drainageProviding drains and gutters for public drainage· Nalgonda· #59432

    ₹2.5 L Completed 30 May 2025Rec. 9 Dec 2023Paid ₹2.5 L
  • Construction of Under Ground Drainage from Akkenapally Anjam (H) to Pulusu Sathyanarayana (H) in Cherukupally (V)

    Sanitation & drainageProviding drains and gutters for public drainage· Nalgonda· #59434

    ₹2.0 L Completed 30 May 2025Rec. 9 Dec 2023Paid ₹2.0 L
  • Laying of CC Road From Koppula Ranganaikamma (H) to Bandamedi Anjaiah (H) in Kethepally (V)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nalgonda· #59435

    ₹2.0 L Completed 30 May 2025Rec. 9 Dec 2023Paid ₹2.0 L
  • Laying of CC Road From Chilaka Lingaiah (H) to Chemuta Venkanna (H) in Bheemaram (V)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nalgonda· #59437

    ₹3.0 L Completed 30 May 2025Rec. 9 Dec 2023Paid ₹3.0 L

17th Lok Sabha MPs from Telangana

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Ramulu Pothuganti · Nagarkurnool99%81%15890
2Smt Kavitha Malothu · Mahabubabad100%80%16187
3Shri Komati Reddy Venkat Reddy · Bhongir89%87%35685
4Gaddam Ranjith Reddy · Chelvella100%82%17485
5Anumula Revanth Reddy · Malkajgiri100%68%2884
6Uttam Kumar Nalamada Reddy · Nalgonda100%96%27083
7Venkatesh Netha Borlakunta · Peddapalle99%75%26479
8Dayakar Pasunoori · Warangel96%88%22678
9Bheemrao Baswanthrao Patil · Zahirabad100%68%39976
10Nama Nageswara Rao · Khammam87%71%19373
11Sanjay Kumar Bandi · Karimnagar99%58%29473
12Asaduddin Owaisi · Hyderabad96%70%3267

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.