MPLADS report card · 18th Lok Sabha

Asaduddin Owaisi

Lok SabhaAIMIMHyderabad · Telangana

MP score28/100492nd of 542 in the 18th Lok Sabha
16th of 17 from Telangana
Also an MP in the 17th Lok Sabha Then: 96% utilisation, 32 works completed, score 67.
  • Works waiting for sanction

    15 recommended works are still awaiting sanction more than 45 days later. Sanction is the district authority’s responsibility.

  • Recommended, but little spent

    80% of funds recommended, but only 7.6% paid out to vendors.

  • Payments concentrated with one vendor

    92% of vendor payments went to A F Construction op by Ismail.

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

80%

₹11.81 Cr recommended · 29 works
Above median (76%)

Paid to vendors

₹1.12 Cr

7.6% of allocation
Below median (37%)

Works completed

1

3.4% of recommended
Below median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP29 works

    ₹11.81 Cr · 80% of the ₹14.70 Cr allocated

  2. Sanctioned by the district8 works

    28% sanctioned · took 55 days on average (due within 45 days)

  3. Completed1 works

    ₹56.6 L final cost · 8.1 months from recommendation on average

21 works are still awaiting sanction, 15 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 29 works worth ₹11.81 Cr, a fund utilisation of 80%, higher than 57% of 18th Lok Sabha MPs.
  • The district has sanctioned 8 of them, taking 55 days on average.
  • ₹1.12 Cr has been paid to vendors, 7.6% of the allocation.
  • 1 works are complete, typically 8.1 months after recommendation. 1 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Health.
  • Payments went to 4 vendors. The largest received 92%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 28/100: finishing works counts most

  1. Works completed 30%3Completed ÷ recommended works.
  2. Spending efficiency 20%51Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%80Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%20Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%8Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    10
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: A F Construction op by Ismail, 92% of payments across 4 vendors.

District sanction speed

73/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%73Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

29 works · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of Compound Wall at Shivareddypet Qabrasthan (Grave YArd) in Ward No.04 of Vikarabad Municipality

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Vikarabad· #2328

    ₹12.0 L Awaiting sanction · 19 daysRec. 13 Oct 2026
  • Drilling of 6 .5 inch dia Power Bore well and fixing of motor with pump set along with required cable etc. , Construction of Room with Partition for RO Plant along with pipe line to connect RO Plant and CC camera , Safe Drinking water project with RO Technology 2000 LPH, SS Tank and automatic water vending machine at Shah Ali Banda, Asha talkies opp near Kaman, Charminar, Hyderabad.

    Drinking waterInstalling tube-wells and borewells· Hyderabad· #317353

    ₹18.0 L Awaiting sanction · 32 daysRec. 30 Sep 2026
  • Drilling of 6 .5 inch dia Power Bore well and fixing of motor with pump set along with required cable etc., Construction of Room with Partition for RO Plant along with pipe line to connect RO Plant and CC camera , Safe Drinking water project with RO Technology 2000 LPH, SS Tank and automatic water vending machine at Aliyabad near Raj Anna bowli, Opp govt. Hospital, Hyderabad.

    Drinking waterInstalling tube-wells and borewells· Hyderabad· #317354

    ₹18.0 L Awaiting sanction · 32 daysRec. 30 Sep 2026
  • Drilling of 6 .5 dia power bore well at Nasheman Nagar, Talabkatta, Hyderabad in Hyderabad Parliamentary Constituency.

    Drinking waterInstalling tube-wells and borewells· Hyderabad· #317355

    ₹6.3 L Awaiting sanction · 32 daysRec. 30 Sep 2026
  • Drilling of 6 .5 dia power bore well and fixing of motor with pump set along with require cable etc., Construction of Room with partition for RO Plant along with pipe line to connect RO Plant and CC Camera and safe drinking water project with RO Technology 2000 LPH, SS Tank and Automatic Water vending machine and Water chiller at H.No.20-2-224/226/227 near Bod Ki Dargah, Owaisi Park, Puranapul of Hyderabad Parliamentary Constituency.

    Drinking waterInstalling tube-wells and borewells· Hyderabad· #317356

    ₹17.0 L Awaiting sanction · 32 daysRec. 30 Sep 2026
  • Drilling of 6.5 dia power bore well and fixing of motor with pump set along with required cable etc., construction of room with partition for RO Plant along with pipeline to connect RO Plant and CC Camera, safe drinking water project with RO Technology 2000 LPH, SS Tank and Automatic Water Vending Machine and Water Chiller at Masjid-e-Hassa, Gulshan Iqbal Colony under Phool Bagh Division, Chandrayangutta Assembly Constituency.

    Drinking waterInstalling tube-wells and borewells· Hyderabad· #317357

    ₹17.0 L Awaiting sanction · 32 daysRec. 30 Sep 2026
  • Construction of new Community hall (G Plus1) at Farooq Nagar 2BHK Falaknuma in Hyderabad Parliamentary Constituency.

    Community buildings & public spacesConstruction of community centers and community halls· Hyderabad· #314023

    ₹67.0 L Awaiting sanction · 51 daysRec. 11 Sep 2026
  • Construction of new community hall (G Plus 1) at Talabkatta near Meraj Cafe in Hyderabad Parliamentary Constituency.

    Community buildings & public spacesConstruction of community centers and community halls· Hyderabad· #314024

    ₹68.0 L Awaiting sanction · 51 daysRec. 11 Sep 2026
  • Construction of Govt. Boys High School, Moghalpura 2 Urdu medium 2nd Floor at Sultan Shahi, Gowlipura, Charminar, Hyderabad Parliamentary Constituency.

    Education & librariesConstruction of rooms and halls in school and colleges· Hyderabad· #314025

    ₹64.5 L Awaiting sanction · 51 daysRec. 11 Sep 2026
  • Construction of UPHC with Ground and 1st floor at Talab Katta, Hyderabad Parliamentary Constituency.

    HealthConstruction of rooms and facilities for hospitals, FWC , PHC Centers and ANM centers· Hyderabad· #314026

    ₹3.50 Cr Awaiting sanction · 51 daysRec. 11 Sep 2026
  • Providing of Bharat Benz 1017 5300WB BS VI, G85 49 plus 1 plus D 3X2 Bus with Free Flow Rexin by BX with ABS and Speed Limiter ECU, with Insurance for 1 year to Government Nizamia Tibbi College, Charminar, Hyderabad

    Education & librariesPurchase of vans and buses for educational institutions· Hyderabad· #309577

    ₹43.6 L Awaiting sanction · 64 daysRec. 29 Aug 2026
  • Specialized vehicles and equipment for the fire stations in Hyderabad Parliamentary Constituency

    Safety & securityPurchase of fire tenders for Government run institutions· Hyderabad· #305195

    ₹1.31 Cr Awaiting sanction · 75 daysRec. 18 Aug 2026
  • Motorized Tri-Cycle Vehicle (TVS Jupiter) to Mr.Feroz Khan, son of Osman Khan, H No. 14-4-164, Begum Bazar Chand Tara Masjid, Hyderabad.

    Divyang & social welfarePurchase of prosthetics, wheel chairs, tricycles (manual or motorized), elect scooties, hearing aids· Hyderabad· #280168

    ₹1.2 L Vendor Identification · 23 Jun 2026Rec. 21 May 2026Paid ₹1.2 L
  • Motorized tri cycle for Mr. Chintakindi Prakas Son of Late Ch. Ramulu H.No.18-3-496 by 31 by 1, Lasmi Nagar Aliabad, Hyderabad

    Divyang & social welfarePurchase of prosthetics, wheel chairs, tricycles (manual or motorized), elect scooties, hearing aids· Hyderabad· #280169

    ₹1.0 L Vendor Identification · 23 Jun 2026Rec. 21 May 2026Paid ₹1.0 L
  • Drilling of power bore well at Girls Hostel, Nizam College, Hyderabad.

    Drinking waterInstalling tube-wells and borewells· Hyderabad· #278876

    ₹6.3 L Awaiting sanction · 164 daysRec. 21 May 2026

18th Lok Sabha MPs from Telangana

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Balram Naik Porika · Mahabubabad74%50%23975
2Chamala Kiran Kumar Reddy · Bhongir64%45%41771
3Dr.Mallu Ravi · Nagarkurnool75%42%14368
4Arvind Dharmapuri · Nizamabad97%57%48065
5Sanjay Kumar Bandi · Karimnagar97%41%21761
6Kadiyam Kavya · Warangel74%24%7660
7Konda Vishweshwar Reddy · Chelvella64%29%18256
8Aruna. D. K · Mahabubnagar87%34%12956
9Godam Nagesh · Adilabad73%25%8155
10Madhavaneni Raghunandan Rao · Medak82%25%4150
11Eatala Rajender · Malkajgiri77%13%3447
12Suresh Kumar Shetkar · Zahirabad71%27%6539

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.