Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Bheemrao Baswanthrao Patil

Lok SabhaZahirabad · Telangana

MP score76/100394th of 539 in the 17th Lok Sabha
9th of 16 from Telangana

Allocated limit

₹11.56 Cr

Median ₹8.60 Cr

Fund utilisation

100%

₹11.55 Cr recommended · 573 works
About the median

Paid to vendors

₹7.82 Cr

68% of allocation
Below median (88%)

Works completed

399

70% of recommended
Below median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP573 works

    ₹11.55 Cr · 100% of the ₹11.56 Cr allocated

  2. Sanctioned by the district475 works

    83% sanctioned · took 13.3 months on average (due within 45 days)

  3. Completed399 works

    ₹6.53 Cr final cost · 17.7 months from recommendation on average

98 works are still awaiting sanction, 98 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 573 works worth ₹11.55 Cr, a fund utilisation of 100%, higher than 80% of 17th Lok Sabha MPs.
  • The district has sanctioned 475 of them, taking 13.3 months on average.
  • ₹7.82 Cr has been paid to vendors, 68% of the allocation.
  • 399 works are complete, typically 17.7 months after recommendation. 172 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 84 vendors. The largest received 13%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 76/100: finishing works counts most

  1. Works completed 30%70Completed ÷ recommended works.
  2. Spending efficiency 20%84Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%43Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%68Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: SURYADEVARA RAVI BABU, 13% of payments across 84 vendors.

District sanction speed

41/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%41Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

574 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Supply and erection of single phaase motor.

    Drinking waterInstalling tube-wells and borewells· Kamareddy· #116327

    ₹50,000 Sanctioned · 22 Oct 2026Rec. 28 Feb 2024
  • Supply and erection of single phaase motor.

    Drinking waterInstalling tube-wells and borewells· Kamareddy· #116330

    ₹50,000 Sanctioned · 22 Oct 2026Rec. 28 Feb 2024
  • Supply and erection of single phaase motor.

    Drinking waterInstalling tube-wells and borewells· Kamareddy· #116332

    ₹50,000 Sanctioned · 22 Oct 2026Rec. 28 Feb 2024
  • Installation of Precast Monolithic RCC Super Structure Toilet 4 Nos at KGBV School Mandnur (V and M), Kamareddy (D)

    Sanitation & drainageConstruction of toilet blocks· Kamareddy· #171890

    ₹5.0 L Sanctioned · 22 Oct 2026Rec. 26 Aug 2022
  • Construction of Sports and Cultural Activities Building in Mudiraj Colony, Bibipet ( V and M) of Kamareddy (D)

    Sports & fitnessConstruction of buildings for sports facilities· Kamareddy· #172022

    ₹5.0 L Vendor Identification · 22 Oct 2026Rec. 6 Aug 2023Paid ₹5.0 L
  • Construction of CC Road near Sevalal Temple,Gandhari Village & Mandal.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kamareddy· #92038

    ₹5.0 L Completed 15 Oct 2026Rec. 30 Jan 2024Paid ₹5.0 L
  • CONSTRUCTION OF PACS BUILDING.

    Community buildings & public spacesConstruction of community centers and community halls· Sangareddy· #83936

    ₹20.0 L Physical Inspection · 12 Oct 2026Rec. 18 Jan 2024Paid ₹18.9 L
  • Construction of Sump and Laying water Pipeline with single phase motor in Rajiv Gandhi Colony near Ayyappa Temple at Pitlam (V and M) of Kamareddy Dist

    Drinking waterProviding supply pipelines for drinking water· Kamareddy· #171905

    ₹2.0 L Sanctioned · 1 Oct 2026Rec. 28 Nov 2022
  • Construction of Reading Hall in SC Colony at Madhapur village.

    Education & librariesConstruction of public libraries and reading rooms· Kamareddy· #81617

    ₹5.0 L Physical Inspection · 25 Sept 2026Rec. 13 Jan 2024Paid ₹5.0 L
  • Construction of Community Toilets at Babappa Math,Kowlas village.

    Sanitation & drainageConstruction of public toilets and bathrooms· Kamareddy· #81727

    ₹5.0 L Sanctioned · 25 Sept 2026Rec. 14 Jan 2024
  • Construction of Cc Road in Venkatapur village.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kamareddy· #92049

    ₹2.0 L Sanctioned · 25 Sept 2026Rec. 30 Jan 2024
  • Construction of retaining wall near gate at.Telangan Tirupati Devasthnam.

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Kamareddy· #114432

    ₹5.0 L Sanctioned · 25 Sept 2026Rec. 26 Feb 2024
  • Laying of WBM Road from Mogha to Wadi village.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kamareddy· #128667

    ₹10.0 L Sanctioned · 25 Sept 2026Rec. 14 Mar 2024
  • Construction of Sports and Cultural Activities Building near Shivalayam Temple, Narsannapally (V), Kamareddy (M), of Kamareddy (D)

    Sports & fitnessConstruction of buildings for sports facilities· Kamareddy· #172025

    ₹5.0 L Sanctioned · 25 Sept 2026Rec. 6 Aug 2023
  • Construction of MEPMA Building in Patharajampet (V), Kamareddy (M) of Kamareddy (D)

    Safety & securityConstruction of Government office buildings (Post office, Police station, Police chauki, etc.)· Kamareddy· #172026

    ₹5.0 L Sanctioned · 25 Sept 2026Rec. 6 Aug 2023

17th Lok Sabha MPs from Telangana

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Ramulu Pothuganti · Nagarkurnool99%81%15890
2Smt Kavitha Malothu · Mahabubabad100%80%16187
3Shri Komati Reddy Venkat Reddy · Bhongir89%87%35685
4Gaddam Ranjith Reddy · Chelvella100%82%17485
5Anumula Revanth Reddy · Malkajgiri100%68%2884
6Uttam Kumar Nalamada Reddy · Nalgonda100%96%27083
7Venkatesh Netha Borlakunta · Peddapalle99%75%26479
8Dayakar Pasunoori · Warangel96%88%22678
9Bheemrao Baswanthrao Patil · Zahirabad100%68%39976
10Nama Nageswara Rao · Khammam87%71%19373
11Sanjay Kumar Bandi · Karimnagar99%58%29473
12Asaduddin Owaisi · Hyderabad96%70%3267

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.