Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Dayakar Pasunoori

Lok SabhaSC seatWarangel · Telangana

MP score78/100374th of 539 in the 17th Lok Sabha
8th of 16 from Telangana

Allocated limit

₹10.69 Cr

Median ₹8.60 Cr

Fund utilisation

96%

₹10.31 Cr recommended · 294 works
About the median

Paid to vendors

₹9.40 Cr

88% of allocation
About the median

Works completed

226

77% of recommended
Below median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP294 works

    ₹10.31 Cr · 96% of the ₹10.69 Cr allocated

  2. Sanctioned by the district276 works

    94% sanctioned · took 6.8 months on average (due within 45 days)

  3. Completed226 works

    ₹7.39 Cr final cost · 13.4 months from recommendation on average

18 works are still awaiting sanction, 18 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 294 works worth ₹10.31 Cr, a fund utilisation of 96%, higher than 39% of 17th Lok Sabha MPs.
  • The district has sanctioned 276 of them, taking 6.8 months on average.
  • ₹9.40 Cr has been paid to vendors, 88% of the allocation.
  • 226 works are complete, typically 13.4 months after recommendation. 114 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 21 vendors. The largest received 32%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 78/100: finishing works counts most

  1. Works completed 30%77Completed ÷ recommended works.
  2. Spending efficiency 20%79Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%96Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%50Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%88Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    86
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: Keerthana Mahila Podupu Sangam, 32% of payments across 21 vendors.

District sanction speed

71/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%71Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

294 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Providing infrastructure facilities to Rythuvedika Palivelpula, Hanumakonda District

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Hanumakonda· #212633

    ₹4.7 L Completed 1 Oct 2026Rec. 25 Sep 2023Paid ₹4.7 L
  • C/o Toilet block to community hall at Ambedkar Centre, Bollikunta, Div. No.17, Khilawarangal Mandal

    Sanitation & drainageConstruction of toilet blocks· Warangal· #86106

    ₹5.0 L Physical Inspection · 1 Jul 2026Rec. 21 Jan 2024Paid ₹5.0 L
  • Providing running water to Community hall at Ambedkar Center, Div. No.17, Bollikunta, Khilawarangal Mandal, Warangal District

    Community buildings & public spacesConstruction of community centers and community halls· Warangal· #87723

    ₹5.0 L Work partially Completed · 25 Jun 2026Rec. 24 Jan 2024
  • Installation of Outdoor Gym Equipments at UPS Vadlakonda, Parvatagiri Mandal, Warangal District

    Sports & fitnessInstallation of fixed garden gym equipment· Warangal· #21994

    ₹5.0 L Physical Inspection · 13 May 2026Rec. 17 Sep 2023Paid ₹5.0 L
  • Providing of RO Water Plant Mamunoor, GWMC 43rd Division, Khilawarangal Mandal, Warangal District

    Drinking waterInstalling community drinking water plants· Warangal· #118802

    ₹5.0 L Physical Inspection · 13 May 2026Rec. 2 Mar 2024Paid ₹5.0 L
  • Providing of RO Water Plant at Illanda Wardhannapet Mandal

    Drinking waterInstalling community drinking water plants· Warangal· #65130

    ₹5.0 L Completed 1 May 2026Rec. 19 Dec 2023Paid ₹5.0 L
  • C/o Toilet block to Community hall at Bollikunta, Div. No.17 Khilawarangal Mandal Warangal District

    Sanitation & drainageConstruction of toilet blocks· Warangal· #87722

    ₹5.0 L Completed 1 May 2026Rec. 24 Jan 2024Paid ₹5.0 L
  • Installation of out door gym equipments at PS Lyabarthy of Wardhannapet Mandal, Warangal District

    Sports & fitnessInstallation of fixed garden gym equipment· Warangal· #93676

    ₹5.0 L Completed 1 May 2026Rec. 1 Feb 2024Paid ₹5.0 L
  • Installation of outdoor gym equipments at UPS Divitipally of Wardhannapet Mandal, Warangal District

    Sports & fitnessInstallation of fixed garden gym equipment· Warangal· #93677

    ₹5.0 L Completed 1 May 2026Rec. 1 Feb 2024Paid ₹5.0 L
  • Installation of out door equipments UPS Kothapeta of Warangal Mandal

    Sports & fitnessInstallation of fixed garden gym equipment· Warangal· #93710

    ₹5.0 L Completed 1 May 2026Rec. 1 Feb 2024Paid ₹5.0 L
  • Installation of out door gym equipments at ZPHS Bollikunta of Khilawarangal Mandal

    Sports & fitnessInstallation of fixed garden gym equipment· Warangal· #93711

    ₹5.0 L Completed 1 May 2026Rec. 1 Feb 2024Paid ₹5.0 L
  • Installation of out door gym equipments at UPS Gadipally of Khilawarangal Mandal

    Sports & fitnessInstallation of fixed garden gym equipment· Warangal· #93712

    ₹5.0 L Completed 1 May 2026Rec. 1 Feb 2024Paid ₹5.0 L
  • Installation of out door gym equipments at ZPHS Dharmarm, Geesugonda Mandal, Warangal District

    Sports & fitnessInstallation of fixed garden gym equipment· Warangal· #93713

    ₹5.0 L Completed 1 May 2026Rec. 1 Feb 2024Paid ₹5.0 L
  • Installation of out door gym equipments at PS Thimmapur of Khilawarangal Mandal

    Sports & fitnessInstallation of fixed garden gym equipment· Warangal· #93714

    ₹5.0 L Completed 1 May 2026Rec. 1 Feb 2024Paid ₹5.0 L
  • Providing highmast lights (2sets) at BC Colony, Ashalapally of Sangem Mandal, Warangal District

    Electricity & lightingLighting of public spaces· Warangal· #99958

    ₹3.2 L Completed 1 May 2026Rec. 8 Feb 2024Paid ₹3.2 L

17th Lok Sabha MPs from Telangana

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Ramulu Pothuganti · Nagarkurnool99%81%15890
2Smt Kavitha Malothu · Mahabubabad100%80%16187
3Shri Komati Reddy Venkat Reddy · Bhongir89%87%35685
4Gaddam Ranjith Reddy · Chelvella100%82%17485
5Anumula Revanth Reddy · Malkajgiri100%68%2884
6Uttam Kumar Nalamada Reddy · Nalgonda100%96%27083
7Venkatesh Netha Borlakunta · Peddapalle99%75%26479
8Dayakar Pasunoori · Warangel96%88%22678
9Bheemrao Baswanthrao Patil · Zahirabad100%68%39976
10Nama Nageswara Rao · Khammam87%71%19373
11Sanjay Kumar Bandi · Karimnagar99%58%29473
12Asaduddin Owaisi · Hyderabad96%70%3267

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.