Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Smt Kavitha Malothu

Lok SabhaMahabubabad · Telangana

MP score87/100220th of 539 in the 17th Lok Sabha
2nd of 16 from Telangana

Allocated limit

₹9.81 Cr

Median ₹8.60 Cr

Fund utilisation

100%

₹9.78 Cr recommended · 199 works
About the median

Paid to vendors

₹7.87 Cr

80% of allocation
Below median (88%)

Works completed

161

81% of recommended
About the median

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP199 works

    ₹9.78 Cr · 100% of the ₹9.81 Cr allocated

  2. Sanctioned by the district183 works

    92% sanctioned · took 7.9 months on average (due within 45 days)

  3. Completed161 works

    ₹6.17 Cr final cost · 10.4 months from recommendation on average

16 works are still awaiting sanction, 16 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 199 works worth ₹9.78 Cr, a fund utilisation of 100%, higher than 73% of 17th Lok Sabha MPs.
  • The district has sanctioned 183 of them, taking 7.9 months on average.
  • ₹7.87 Cr has been paid to vendors, 80% of the allocation.
  • 161 works are complete, typically 10.4 months after recommendation. 160 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 39 vendors. The largest received 25%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 87/100: finishing works counts most

  1. Works completed 30%81Completed ÷ recommended works.
  2. Spending efficiency 20%78Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%99Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%80Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    94
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: G Sampath Reddy, 25% of payments across 39 vendors.

District sanction speed

65/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%65Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

199 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Laying CC Road from Grama Panchayathi to Jagya Thanda at Vanthadpula

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahabubabad· #28917

    ₹5.0 L Physical Inspection · 15 Aug 2026Rec. 30 Sep 2023Paid ₹5.0 L
  • Laying CC Road from Patha Bodrai to Vanthadpula Main Road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahabubabad· #28918

    ₹5.0 L Physical Inspection · 15 Aug 2026Rec. 30 Sep 2023Paid ₹4.8 L
  • Installation of 24 W 4 Arm Solar Street Lights at Main Road to Sammakka Saralakka Gadde, Dameravancha (V), Gudur (M), Mahabubabad (D)

    Electricity & lightingStreet lights· Mahabubabad· #92438

    ₹1.1 L Completed 31 Mar 2026Rec. 31 Jan 2024Paid ₹1.1 L
  • Construction of Side Drain from Gundeti Lingaiah House to Edaboina Aruna House at Mulugu (T) (M) & (D)

    Sanitation & drainageProviding drains and gutters for public drainage· Mulugu· #89869

    ₹5.0 L Completed 11 Mar 2026Rec. 27 Jan 2024Paid ₹5.0 L
  • Construction of Community Building at Ramannagudem

    Community buildings & public spacesConstruction of community centers and community halls· Mahabubabad· #30498

    ₹10.0 L Completed 16 Feb 2026Rec. 3 Oct 2023Paid ₹10.0 L
  • Construction of Drain from Somu Anji Reddy House to Yaram Ramakrishna Reddy Doddi at Laxmipuram (V), Burgampahad (M), Bhadradri Kothagudem (D)

    Sanitation & drainageProviding drains and gutters for public drainage· Bhadradri Kothagudem· #66092

    ₹4.4 L Completed 29 Jan 2026Rec. 20 Dec 2023Paid ₹4.4 L
  • Laying CC Road from Komaram Sujatha House to Boggam Srinu House at Gopalapuram (V) of Nakiripeta (GP), Burgampahad (M), Bhadradri Kothagudem (D)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhadradri Kothagudem· #80642

    ₹4.9 L Completed 29 Jan 2026Rec. 12 Jan 2024Paid ₹4.9 L
  • Construction of Side Drain from Mohammad Pasha House to Thirupathi House at Mulugu (T), (M) & (D)

    Sanitation & drainageProviding drains and gutters for public drainage· Mulugu· #89889

    ₹5.0 L Completed 12 Dec 2025Rec. 27 Jan 2024Paid ₹5.0 L
  • Laying CC Road Around Bodrai and Hanuman Temple at Govindapuram (V), Gudur (M), Mahabubabad (D)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahabubabad· #82692

    ₹5.0 L Completed 25 Nov 2025Rec. 16 Jan 2024Paid ₹5.0 L
  • Laying CC Road at Ravigudem

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahabubabad· #28826

    ₹5.0 L Completed 22 Nov 2025Rec. 29 Sep 2023Paid ₹5.0 L
  • Installation of 150 W 6 Arm Highmast Flood Lights at Upparapally (V), Kesamudram (M), Mahabubabad (D)

    Electricity & lightingLighting of public spaces· Mahabubabad· #82685

    ₹3.5 L Completed 22 Nov 2025Rec. 16 Jan 2024Paid ₹3.5 L
  • Installation of 150 W 6 Arm Highmast Flood Lights at Shivalayam Temple Centre, Upparapally (V), Kesamudram (M), Mahabubabad (D)

    Electricity & lightingLighting of public spaces· Mahabubabad· #82686

    ₹3.4 L Completed 22 Nov 2025Rec. 16 Jan 2024Paid ₹3.4 L
  • Installation of 150 W 6 Arm Highmast Flood Lights at Ramalayam Temple Centre, Upparapally (V), Kesamudram (M), Mahabubabad (D)

    Electricity & lightingLighting of public spaces· Mahabubabad· #82687

    ₹3.5 L Completed 22 Nov 2025Rec. 16 Jan 2024Paid ₹3.5 L
  • Laying CC Road from Village to Smashanavatika (Grave Yard) at Banjara

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahabubabad· #28924

    ₹5.0 L Work partially Completed · 10 Jul 2025Rec. 30 Sep 2023Paid ₹4.4 L
  • Laying CC Road from Isampally Veeraiah House to Elthuri Ramulu House at Munigalaveedu

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahabubabad· #29491

    ₹5.0 L Completed 4 Jul 2025Rec. 30 Sep 2023Paid ₹5.0 L

17th Lok Sabha MPs from Telangana

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Ramulu Pothuganti · Nagarkurnool99%81%15890
2Smt Kavitha Malothu · Mahabubabad100%80%16187
3Shri Komati Reddy Venkat Reddy · Bhongir89%87%35685
4Gaddam Ranjith Reddy · Chelvella100%82%17485
5Anumula Revanth Reddy · Malkajgiri100%68%2884
6Uttam Kumar Nalamada Reddy · Nalgonda100%96%27083
7Venkatesh Netha Borlakunta · Peddapalle99%75%26479
8Dayakar Pasunoori · Warangel96%88%22678
9Bheemrao Baswanthrao Patil · Zahirabad100%68%39976
10Nama Nageswara Rao · Khammam87%71%19373
11Sanjay Kumar Bandi · Karimnagar99%58%29473
12Asaduddin Owaisi · Hyderabad96%70%3267

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.