2nd of 16 from Telangana
Allocated limit
₹9.81 Cr
Median ₹8.60 Cr
Fund utilisation
100%
₹9.78 Cr recommended · 199 works
About the median
Paid to vendors
₹7.87 Cr
80% of allocation
Below median (88%)
Works completed
161
81% of recommended
About the median
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP199 works
₹9.78 Cr · 100% of the ₹9.81 Cr allocated
- Sanctioned by the district183 works
92% sanctioned · took 7.9 months on average (due within 45 days)
- Completed161 works
₹6.17 Cr final cost · 10.4 months from recommendation on average
16 works are still awaiting sanction, 16 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 199 works worth ₹9.78 Cr, a fund utilisation of 100%, higher than 73% of 17th Lok Sabha MPs.
- The district has sanctioned 183 of them, taking 7.9 months on average.
- ₹7.87 Cr has been paid to vendors, 80% of the allocation.
- 161 works are complete, typically 10.4 months after recommendation. 160 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Electricity & lighting.
- Payments went to 39 vendors. The largest received 25%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 87/100: finishing works counts most
- Works completed 30%81Completed ÷ recommended works.
- Spending efficiency 20%78Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%99Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%80Paid to vendors ÷ allocated limit.
- Vendor diversity 10%94How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: G Sampath Reddy, 25% of payments across 39 vendors.
District sanction speed
65/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%65Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
199 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Laying CC Road from Grama Panchayathi to Jagya Thanda at Vanthadpula
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahabubabad· #28917
₹5.0 L Physical Inspection · 15 Aug 2026Rec. 30 Sep 2023Paid ₹5.0 LLaying CC Road from Patha Bodrai to Vanthadpula Main Road
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahabubabad· #28918
₹5.0 L Physical Inspection · 15 Aug 2026Rec. 30 Sep 2023Paid ₹4.8 LInstallation of 24 W 4 Arm Solar Street Lights at Main Road to Sammakka Saralakka Gadde, Dameravancha (V), Gudur (M), Mahabubabad (D)
Electricity & lightingStreet lights· Mahabubabad· #92438
₹1.1 L Completed 31 Mar 2026Rec. 31 Jan 2024Paid ₹1.1 LConstruction of Side Drain from Gundeti Lingaiah House to Edaboina Aruna House at Mulugu (T) (M) & (D)
Sanitation & drainageProviding drains and gutters for public drainage· Mulugu· #89869
₹5.0 L Completed 11 Mar 2026Rec. 27 Jan 2024Paid ₹5.0 LConstruction of Community Building at Ramannagudem
Community buildings & public spacesConstruction of community centers and community halls· Mahabubabad· #30498
₹10.0 L Completed 16 Feb 2026Rec. 3 Oct 2023Paid ₹10.0 LConstruction of Drain from Somu Anji Reddy House to Yaram Ramakrishna Reddy Doddi at Laxmipuram (V), Burgampahad (M), Bhadradri Kothagudem (D)
Sanitation & drainageProviding drains and gutters for public drainage· Bhadradri Kothagudem· #66092
₹4.4 L Completed 29 Jan 2026Rec. 20 Dec 2023Paid ₹4.4 LLaying CC Road from Komaram Sujatha House to Boggam Srinu House at Gopalapuram (V) of Nakiripeta (GP), Burgampahad (M), Bhadradri Kothagudem (D)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhadradri Kothagudem· #80642
₹4.9 L Completed 29 Jan 2026Rec. 12 Jan 2024Paid ₹4.9 LConstruction of Side Drain from Mohammad Pasha House to Thirupathi House at Mulugu (T), (M) & (D)
Sanitation & drainageProviding drains and gutters for public drainage· Mulugu· #89889
₹5.0 L Completed 12 Dec 2025Rec. 27 Jan 2024Paid ₹5.0 LLaying CC Road Around Bodrai and Hanuman Temple at Govindapuram (V), Gudur (M), Mahabubabad (D)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahabubabad· #82692
₹5.0 L Completed 25 Nov 2025Rec. 16 Jan 2024Paid ₹5.0 LLaying CC Road at Ravigudem
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahabubabad· #28826
₹5.0 L Completed 22 Nov 2025Rec. 29 Sep 2023Paid ₹5.0 LInstallation of 150 W 6 Arm Highmast Flood Lights at Upparapally (V), Kesamudram (M), Mahabubabad (D)
Electricity & lightingLighting of public spaces· Mahabubabad· #82685
₹3.5 L Completed 22 Nov 2025Rec. 16 Jan 2024Paid ₹3.5 LInstallation of 150 W 6 Arm Highmast Flood Lights at Shivalayam Temple Centre, Upparapally (V), Kesamudram (M), Mahabubabad (D)
Electricity & lightingLighting of public spaces· Mahabubabad· #82686
₹3.4 L Completed 22 Nov 2025Rec. 16 Jan 2024Paid ₹3.4 LInstallation of 150 W 6 Arm Highmast Flood Lights at Ramalayam Temple Centre, Upparapally (V), Kesamudram (M), Mahabubabad (D)
Electricity & lightingLighting of public spaces· Mahabubabad· #82687
₹3.5 L Completed 22 Nov 2025Rec. 16 Jan 2024Paid ₹3.5 LLaying CC Road from Village to Smashanavatika (Grave Yard) at Banjara
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahabubabad· #28924
₹5.0 L Work partially Completed · 10 Jul 2025Rec. 30 Sep 2023Paid ₹4.4 LLaying CC Road from Isampally Veeraiah House to Elthuri Ramulu House at Munigalaveedu
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahabubabad· #29491
₹5.0 L Completed 4 Jul 2025Rec. 30 Sep 2023Paid ₹5.0 L
17th Lok Sabha MPs from Telangana
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Ramulu Pothuganti · Nagarkurnool | 99% | 81% | 158 | 90 |
| 2 | Smt Kavitha Malothu · Mahabubabad | 100% | 80% | 161 | 87 |
| 3 | Shri Komati Reddy Venkat Reddy · Bhongir | 89% | 87% | 356 | 85 |
| 4 | Gaddam Ranjith Reddy · Chelvella | 100% | 82% | 174 | 85 |
| 5 | Anumula Revanth Reddy · Malkajgiri | 100% | 68% | 28 | 84 |
| 6 | Uttam Kumar Nalamada Reddy · Nalgonda | 100% | 96% | 270 | 83 |
| 7 | Venkatesh Netha Borlakunta · Peddapalle | 99% | 75% | 264 | 79 |
| 8 | Dayakar Pasunoori · Warangel | 96% | 88% | 226 | 78 |
| 9 | Bheemrao Baswanthrao Patil · Zahirabad | 100% | 68% | 399 | 76 |
| 10 | Nama Nageswara Rao · Khammam | 87% | 71% | 193 | 73 |
| 11 | Sanjay Kumar Bandi · Karimnagar | 99% | 58% | 294 | 73 |
| 12 | Asaduddin Owaisi · Hyderabad | 96% | 70% | 32 | 67 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.