Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Uttam Kumar Nalamada Reddy

Lok SabhaNalgonda · Telangana

MP score83/100306th of 539 in the 17th Lok Sabha
6th of 16 from Telangana

Allocated limit

₹10.96 Cr

Median ₹8.60 Cr

Fund utilisation

100%

₹10.95 Cr recommended · 287 works
About the median

Paid to vendors

₹10.51 Cr

96% of allocation
Above median (88%)

Works completed

270

94% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP287 works

    ₹10.95 Cr · 100% of the ₹10.96 Cr allocated

  2. Sanctioned by the district286 works

    100% sanctioned · took 6.9 months on average (due within 45 days)

  3. Completed270 works

    ₹10.48 Cr final cost · 6.6 months from recommendation on average

1 works are still awaiting sanction, 1 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 287 works worth ₹10.95 Cr, a fund utilisation of 100%, higher than 78% of 17th Lok Sabha MPs.
  • The district has sanctioned 286 of them, taking 6.9 months on average.
  • ₹10.51 Cr has been paid to vendors, 96% of the allocation.
  • 270 works are complete, typically 6.6 months after recommendation. 10 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 74 vendors. The largest received 22%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 83/100: finishing works counts most

  1. Works completed 30%94Completed ÷ recommended works.
  2. Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%4Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%96Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    97
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: BHUKYA LAKSHMI, 22% of payments across 74 vendors.

District sanction speed

74/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%74Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

287 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Drilling of Bore Motor at Sarveshwarapuram Village of Kodad Mandal

    Drinking waterInstalling tube-wells and borewells· Suryapet· #223380

    ₹82,700 Completed 18 Feb 2026Rec. 6 Oct 2023Paid ₹82,700
  • Constn. of CC Road and Drain at ST Colony in Ekalaskanpet Village of Nadigudem Mandal

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Suryapet· #56919

    ₹4.0 L Completed 4 Feb 2026Rec. 5 Dec 2023Paid ₹4.0 L
  • Mineral Water Plant at Sarvaram(V) of Garidepally Mandal

    Drinking waterInstalling community drinking water plants· Suryapet· #60985

    ₹3.9 L Completed 24 Jan 2026Rec. 12 Dec 2023Paid ₹3.9 L
  • Drilling of Bore well Fixing of Hand Pump set near Gangadevamma temple at Srinivasapuram v

    Drinking waterInstalling tube-wells and borewells· Suryapet· #223574

    ₹80,000 Sanctioned · 31 Dec 2025Rec. 14 Feb 2020
  • Providing Mineral water Plant at Rangapuram Thanda

    Drinking waterInstalling community drinking water plants· Suryapet· #223599

    ₹4.0 L Sanctioned · 31 Dec 2025Rec. 5 Oct 2023
  • Drilling of Bore well Fixing of Hand pumpuset near Daravath Mangathi H of Anthya Thanda, Bheelyanaik Thanda GP Mattampally Mandal

    Drinking waterInstalling tube-wells and borewells· Suryapet· #223604

    ₹80,000 Sanctioned · 31 Dec 2025Rec. 11 Jan 2023
  • Drilling of Bore well Fixing of Hand pumpuset near Daravath Nagendra fields of Somla Thanda, Badava Thanda GP Mattampally Mandal

    Drinking waterInstalling tube-wells and borewells· Suryapet· #223605

    ₹80,000 Sanctioned · 31 Dec 2025Rec. 11 Jan 2023
  • Drilling of Bore well Fixing of Hand pumpuset near Bangari Maisamma Temple of Anthya Thanda, Bheelyanaik Thanda GP Mattampally Mandal

    Drinking waterInstalling tube-wells and borewells· Suryapet· #223606

    ₹80,000 Sanctioned · 31 Dec 2025Rec. 11 Jan 2023
  • Construction of Mineral water plant Ramachandra Nagar

    Drinking waterInstalling community drinking water plants· Suryapet· #223379

    ₹4.0 L Sanctioned · 30 Dec 2025Rec. 6 Oct 2023
  • Prov. of Bore with Hand Pump set besides Indian Oil Petrol Bunk at Huzurnagar town

    Drinking waterInstalling tube-wells and borewells· Suryapet· #223567

    ₹60,000 Sanctioned · 30 Dec 2025Rec. 14 Feb 2020
  • Drilling of Bore well Fixing of Hand Pump set at Kota Maisamma temple in Chennaipalem v

    Drinking waterInstalling tube-wells and borewells· Suryapet· #223571

    ₹80,000 Sanctioned · 30 Dec 2025Rec. 14 Feb 2020
  • Laying of CC Road from Community Hall to PACS Godawns in Kandibanda Village

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Suryapet· #223587

    ₹4.0 L Sanctioned · 30 Dec 2025Rec. 13 Aug 2023
  • Laying of CC Road from Banala Venkateswarlu H to MY Home Road in Mellacheruvu Village

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Suryapet· #223588

    ₹4.0 L Sanctioned · 30 Dec 2025Rec. 13 Aug 2023
  • Laying of CC road from Vallaba Venkateswarlu (H) to CH. Guruswamy (H) in Mellacheruvu

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Suryapet· #223589

    ₹4.0 L Sanctioned · 30 Dec 2025Rec. 13 Aug 2023
  • Providing Mineral water at Balaji nagar of Kodad Town

    Drinking waterInstalling community drinking water plants· Suryapet· #223596

    ₹4.0 L Sanctioned · 30 Dec 2025Rec. 5 Oct 2023

17th Lok Sabha MPs from Telangana

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Ramulu Pothuganti · Nagarkurnool99%81%15890
2Smt Kavitha Malothu · Mahabubabad100%80%16187
3Shri Komati Reddy Venkat Reddy · Bhongir89%87%35685
4Gaddam Ranjith Reddy · Chelvella100%82%17485
5Anumula Revanth Reddy · Malkajgiri100%68%2884
6Uttam Kumar Nalamada Reddy · Nalgonda100%96%27083
7Venkatesh Netha Borlakunta · Peddapalle99%75%26479
8Dayakar Pasunoori · Warangel96%88%22678
9Bheemrao Baswanthrao Patil · Zahirabad100%68%39976
10Nama Nageswara Rao · Khammam87%71%19373
11Sanjay Kumar Bandi · Karimnagar99%58%29473
12Asaduddin Owaisi · Hyderabad96%70%3267

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.