6th of 16 from Telangana
Allocated limit
₹10.96 Cr
Median ₹8.60 Cr
Fund utilisation
100%
₹10.95 Cr recommended · 287 works
About the median
Paid to vendors
₹10.51 Cr
96% of allocation
Above median (88%)
Works completed
270
94% of recommended
Above median (83%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP287 works
₹10.95 Cr · 100% of the ₹10.96 Cr allocated
- Sanctioned by the district286 works
100% sanctioned · took 6.9 months on average (due within 45 days)
- Completed270 works
₹10.48 Cr final cost · 6.6 months from recommendation on average
1 works are still awaiting sanction, 1 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 287 works worth ₹10.95 Cr, a fund utilisation of 100%, higher than 78% of 17th Lok Sabha MPs.
- The district has sanctioned 286 of them, taking 6.9 months on average.
- ₹10.51 Cr has been paid to vendors, 96% of the allocation.
- 270 works are complete, typically 6.6 months after recommendation. 10 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 74 vendors. The largest received 22%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 83/100: finishing works counts most
- Works completed 30%94Completed ÷ recommended works.
- Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%4Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%96Paid to vendors ÷ allocated limit.
- Vendor diversity 10%97How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: BHUKYA LAKSHMI, 22% of payments across 74 vendors.
District sanction speed
74/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%74Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
287 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Drilling of Bore Motor at Sarveshwarapuram Village of Kodad Mandal
Drinking waterInstalling tube-wells and borewells· Suryapet· #223380
₹82,700 Completed 18 Feb 2026Rec. 6 Oct 2023Paid ₹82,700Constn. of CC Road and Drain at ST Colony in Ekalaskanpet Village of Nadigudem Mandal
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Suryapet· #56919
₹4.0 L Completed 4 Feb 2026Rec. 5 Dec 2023Paid ₹4.0 LMineral Water Plant at Sarvaram(V) of Garidepally Mandal
Drinking waterInstalling community drinking water plants· Suryapet· #60985
₹3.9 L Completed 24 Jan 2026Rec. 12 Dec 2023Paid ₹3.9 LDrilling of Bore well Fixing of Hand Pump set near Gangadevamma temple at Srinivasapuram v
Drinking waterInstalling tube-wells and borewells· Suryapet· #223574
₹80,000 Sanctioned · 31 Dec 2025Rec. 14 Feb 2020Providing Mineral water Plant at Rangapuram Thanda
Drinking waterInstalling community drinking water plants· Suryapet· #223599
₹4.0 L Sanctioned · 31 Dec 2025Rec. 5 Oct 2023Drilling of Bore well Fixing of Hand pumpuset near Daravath Mangathi H of Anthya Thanda, Bheelyanaik Thanda GP Mattampally Mandal
Drinking waterInstalling tube-wells and borewells· Suryapet· #223604
₹80,000 Sanctioned · 31 Dec 2025Rec. 11 Jan 2023Drilling of Bore well Fixing of Hand pumpuset near Daravath Nagendra fields of Somla Thanda, Badava Thanda GP Mattampally Mandal
Drinking waterInstalling tube-wells and borewells· Suryapet· #223605
₹80,000 Sanctioned · 31 Dec 2025Rec. 11 Jan 2023Drilling of Bore well Fixing of Hand pumpuset near Bangari Maisamma Temple of Anthya Thanda, Bheelyanaik Thanda GP Mattampally Mandal
Drinking waterInstalling tube-wells and borewells· Suryapet· #223606
₹80,000 Sanctioned · 31 Dec 2025Rec. 11 Jan 2023Construction of Mineral water plant Ramachandra Nagar
Drinking waterInstalling community drinking water plants· Suryapet· #223379
₹4.0 L Sanctioned · 30 Dec 2025Rec. 6 Oct 2023Prov. of Bore with Hand Pump set besides Indian Oil Petrol Bunk at Huzurnagar town
Drinking waterInstalling tube-wells and borewells· Suryapet· #223567
₹60,000 Sanctioned · 30 Dec 2025Rec. 14 Feb 2020Drilling of Bore well Fixing of Hand Pump set at Kota Maisamma temple in Chennaipalem v
Drinking waterInstalling tube-wells and borewells· Suryapet· #223571
₹80,000 Sanctioned · 30 Dec 2025Rec. 14 Feb 2020Laying of CC Road from Community Hall to PACS Godawns in Kandibanda Village
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Suryapet· #223587
₹4.0 L Sanctioned · 30 Dec 2025Rec. 13 Aug 2023Laying of CC Road from Banala Venkateswarlu H to MY Home Road in Mellacheruvu Village
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Suryapet· #223588
₹4.0 L Sanctioned · 30 Dec 2025Rec. 13 Aug 2023Laying of CC road from Vallaba Venkateswarlu (H) to CH. Guruswamy (H) in Mellacheruvu
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Suryapet· #223589
₹4.0 L Sanctioned · 30 Dec 2025Rec. 13 Aug 2023Providing Mineral water at Balaji nagar of Kodad Town
Drinking waterInstalling community drinking water plants· Suryapet· #223596
₹4.0 L Sanctioned · 30 Dec 2025Rec. 5 Oct 2023
17th Lok Sabha MPs from Telangana
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Ramulu Pothuganti · Nagarkurnool | 99% | 81% | 158 | 90 |
| 2 | Smt Kavitha Malothu · Mahabubabad | 100% | 80% | 161 | 87 |
| 3 | Shri Komati Reddy Venkat Reddy · Bhongir | 89% | 87% | 356 | 85 |
| 4 | Gaddam Ranjith Reddy · Chelvella | 100% | 82% | 174 | 85 |
| 5 | Anumula Revanth Reddy · Malkajgiri | 100% | 68% | 28 | 84 |
| 6 | Uttam Kumar Nalamada Reddy · Nalgonda | 100% | 96% | 270 | 83 |
| 7 | Venkatesh Netha Borlakunta · Peddapalle | 99% | 75% | 264 | 79 |
| 8 | Dayakar Pasunoori · Warangel | 96% | 88% | 226 | 78 |
| 9 | Bheemrao Baswanthrao Patil · Zahirabad | 100% | 68% | 399 | 76 |
| 10 | Nama Nageswara Rao · Khammam | 87% | 71% | 193 | 73 |
| 11 | Sanjay Kumar Bandi · Karimnagar | 99% | 58% | 294 | 73 |
| 12 | Asaduddin Owaisi · Hyderabad | 96% | 70% | 32 | 67 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.