Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Ravindra Shyamnarayan Alias Ravi Kishan Shukla

Lok SabhaGorakhpur · Uttar Pradesh

MP score86/100249th of 539 in the 17th Lok Sabha
37th of 81 from Uttar Pradesh
Re-elected to the 18th Lok Sabha Then: 70% utilisation, 1 works completed, score 19.

Allocated limit

₹7.98 Cr

Median ₹8.60 Cr

Fund utilisation

92%

₹7.31 Cr recommended · 135 works
Below median (98%)

Paid to vendors

₹6.83 Cr

86% of allocation
About the median

Works completed

114

84% of recommended
About the median

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP135 works

    ₹7.31 Cr · 92% of the ₹7.98 Cr allocated

  2. Sanctioned by the district134 works

    99% sanctioned · took 3.6 months on average (due within 45 days)

  3. Completed114 works

    ₹5.97 Cr final cost · 24.1 months from recommendation on average

1 works are still awaiting sanction, 1 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 135 works worth ₹7.31 Cr, a fund utilisation of 92%, higher than 20% of 17th Lok Sabha MPs.
  • The district has sanctioned 134 of them, taking 3.6 months on average.
  • ₹6.83 Cr has been paid to vendors, 86% of the allocation.
  • 114 works are complete, typically 24.1 months after recommendation. 85 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 28 vendors. The largest received 21%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 86/100: finishing works counts most

  1. Works completed 30%84Completed ÷ recommended works.
  2. Spending efficiency 20%87Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%92Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%75Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%86Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    99
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: AVADH KAARYA SOLUTIONS, 21% of payments across 28 vendors.

District sanction speed

90/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%90Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

135 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Loksabha kshetr Gorakhpur mein 119 vibhinn sthalon par CCTV camera ki sthapana ka kary

    Safety & securityProviding CCTV camera system for security of public areas· Gorakhpur· #238110

    ₹22.6 L Completed 5 Oct 2026Rec. 14 Jan 2023Paid ₹22.6 L
  • Rajpur Doobi e CC road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gorakhpur· #73358

    ₹3.5 L Completed 20 Mar 2026Rec. 2 Jan 2024Paid ₹3.5 L
  • Majanu mirpur road se kurwa gaon ke pokhare tak CC road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gorakhpur· #73359

    ₹17.8 L Completed 20 Mar 2026Rec. 2 Jan 2024Paid ₹17.8 L
  • Under ground Nali

    Sanitation & drainageProviding drains and gutters for public drainage· Gorakhpur· #73360

    ₹4.8 L Completed 20 Mar 2026Rec. 2 Jan 2024Paid ₹4.8 L
  • Agya me chauhan tent house se krishan chaudhari ke murgi form tak CC road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gorakhpur· #73412

    ₹10.9 L Completed 20 Mar 2026Rec. 2 Jan 2024Paid ₹10.9 L
  • Khtahan ke tola charam me krishan murari ke ghar se madan pandey ke ghar tak CC road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gorakhpur· #73413

    ₹2.7 L Completed 20 Mar 2026Rec. 2 Jan 2024Paid ₹2.7 L
  • Jainpur tola muhamadbarwa nahar pich road se kura nistarn kendra tak CC road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gorakhpur· #73414

    ₹9.6 L Completed 20 Mar 2026Rec. 2 Jan 2024Paid ₹9.6 L
  • Pipriech block Basantpur me 4 mt. puliya

    Roads & bridgesConstruction of culverts and bridges· Gorakhpur· #73759

    ₹9.0 L Completed 20 Mar 2026Rec. 3 Jan 2024Paid ₹9.0 L
  • Jangal ekla no. 2 bichala tola me CC road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gorakhpur· #73760

    ₹14.9 L Completed 20 Mar 2026Rec. 3 Jan 2024Paid ₹14.9 L
  • APJabdul kalam IIT Kabari road se sunita tripathi ke ghar tak cc

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gorakhpur· #73761

    ₹8.2 L Completed 20 Mar 2026Rec. 3 Jan 2024Paid ₹8.2 L
  • Kaithawaliya me Dih baba sashthan se salim ke ghar tak CC

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gorakhpur· #73762

    ₹9.0 L Completed 20 Mar 2026Rec. 3 Jan 2024Paid ₹9.0 L
  • M p inter college gkp

    Education & librariesPurchase of smart boards, visual display units and projectors· Gorakhpur· #73764

    ₹2.1 L Completed 20 Mar 2026Rec. 3 Jan 2024Paid ₹2.1 L
  • M.G. inter college

    Education & librariesPurchase of smart boards, visual display units and projectors· Gorakhpur· #73765

    ₹2.9 L Completed 20 Mar 2026Rec. 3 Jan 2024Paid ₹2.9 L
  • Maheep narayan inter coolege mhabeer chapara

    Education & librariesPurchase of smart boards, visual display units and projectors· Gorakhpur· #73766

    ₹2.9 L Completed 20 Mar 2026Rec. 3 Jan 2024Paid ₹2.9 L
  • D.A.V. inter college gkp

    Education & librariesPurchase of smart boards, visual display units and projectors· Gorakhpur· #73767

    ₹0 Completed 20 Mar 2026Rec. 3 Jan 2024

17th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi100%100%296100
2Mahesh Sharma · Gautam Buddha Nagar100%97%8899
3Anurag Sharma · Jhansi100%100%13798
4Seyed Tufail Hasan · Moradabad100%98%18897
5Shri Ajay (Teni) Misra · Kheri97%97%5197
6Shri Kunwar Danish Ali · Amroha100%97%32597
7Kirti Vardhan Singh · Gonda96%96%13096
8Girish Chandra · Nagina95%95%23896
9Shri Lallu Singh · Faizabad98%94%6296
10Shri Shafiqur Rahman Barq · Sambhal99%97%20695
11Rajesh Verma · Sitapur100%100%2295
12Prof SP Singh Baghel · Agra100%100%3695

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.