This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Anurag Sharma

Lok SabhaJhansi · Uttar Pradesh

MP score98/10012th of 539 in the 17th Lok Sabha
3rd of 81 from Uttar Pradesh
Re-elected to the 18th Lok Sabha Then: 64% utilisation, 95 works completed, score 65.

Allocated limit

₹9.31 Cr

Median ₹8.60 Cr

Fund utilisation

100%

₹9.31 Cr recommended · 138 works
About the median

Paid to vendors

₹9.27 Cr

100% of allocation
Above median (88%)

Works completed

137

99% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP138 works

    ₹9.31 Cr · 100% of the ₹9.31 Cr allocated

  2. Sanctioned by the district138 works

    100% sanctioned · took 57 days on average (due within 45 days)

  3. Completed137 works

    ₹9.26 Cr final cost · 13.3 months from recommendation on average

In plain words

What the numbers say

  • Recommended 138 works worth ₹9.31 Cr, a fund utilisation of 100%, higher than 87% of 17th Lok Sabha MPs.
  • The district has sanctioned 138 of them, taking 57 days on average.
  • ₹9.27 Cr has been paid to vendors, 100% of the allocation.
  • 137 works are complete, typically 13.3 months after recommendation. 117 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 54 vendors. The largest received 8.7%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 98/100: finishing works counts most

  1. Works completed 30%99Completed ÷ recommended works.
  2. Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%85Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%100Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: GOVIND DAS ARYA, 8.7% of payments across 54 vendors.

District sanction speed

98/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%98Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

138 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Yatree shed construction near Jayanti Palace Chauraha Mauranipur.

    Community buildings & public spacesConstruction of bus-sheds or bus-stops· Jhansi· #12330

    ₹3.4 L Completed 26 Feb 2026Rec. 23 Aug 2023Paid ₹3.4 L
  • 150 mtr Apex road and nali construction in village Sonjana Block Mehroni from Ramkishor Mishra house to Jagat house.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lalitpur· #40901

    ₹6.2 L Completed 12 Nov 2025Rec. 26 Oct 2023Paid ₹6.2 L
  • CC road 300mtr and Nali construction at Mithauaapura village Jakhlon near Santosh Kushwaha Puliya to Rajekhan towards Shamshanghat

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lalitpur· #115232

    ₹15.0 L Completed 6 Oct 2025Rec. 26 Feb 2024Paid ₹15.0 L
  • 100 mtr Apex Road and Nali construction in village Nibooja block Bamaur from Sarman house towards.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jhansi· #40460

    ₹5.0 L Completed 4 Sept 2025Rec. 25 Oct 2023Paid ₹5.0 L
  • Transformer installation to increase electricity power at Village Sakrar Block Bangra Jhadi Baba place.

    Electricity & lightingStreet lights· Jhansi· #120123

    ₹8.2 L Completed 25 Aug 2025Rec. 4 Mar 2024Paid ₹8.2 L
  • Yatree shed construction near Agarsen Degree college Mauranipur.

    Community buildings & public spacesConstruction of bus-sheds or bus-stops· Jhansi· #12329

    ₹3.4 L Completed 14 Aug 2025Rec. 23 Aug 2023Paid ₹3.4 L
  • Yatree shed construction near Tahseel Mauranipur.

    Community buildings & public spacesConstruction of bus-sheds or bus-stops· Jhansi· #12331

    ₹3.4 L Completed 14 Aug 2025Rec. 23 Aug 2023Paid ₹3.4 L
  • Yatree shed construction near Ambedkar Chauraha Mauranipur.

    Community buildings & public spacesConstruction of bus-sheds or bus-stops· Jhansi· #12332

    ₹3.4 L Completed 14 Aug 2025Rec. 23 Aug 2023Paid ₹3.4 L
  • Yatree shed construction near Garautha Chauraha Mauranipur.

    Community buildings & public spacesConstruction of bus-sheds or bus-stops· Jhansi· #12333

    ₹3.4 L Completed 14 Aug 2025Rec. 23 Aug 2023Paid ₹3.4 L
  • Apex road construction at Super Market maidan Baruasagar.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jhansi· #12344

    ₹7.8 L Completed 13 Aug 2025Rec. 23 Aug 2023Paid ₹7.8 L
  • Apex road/Nali construction from Arvind Pathak house to Ashok Kumar Sharma to Asheesh Mishra to Jitendra Samadiya to Hirdesh Tiwari house to Rajendra Parmaar house Baruasagar.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jhansi· #12345

    ₹12.6 L Completed 13 Aug 2025Rec. 23 Aug 2023Paid ₹12.6 L
  • 100 mtr Apex Road and Nali construction in village Khiriyaram block chirgaon from Nivi-Samthari LR Sanjay Dubey khet to Primary School.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jhansi· #40445

    ₹5.0 L Completed 30 Apr 2025Rec. 25 Oct 2023Paid ₹5.0 L
  • Apex road/Nali construction from Mannu Kushwaha house to Ramsevak house todifatehpur.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jhansi· #12335

    ₹5.8 L Completed 29 Apr 2025Rec. 23 Aug 2023Paid ₹5.8 L
  • Apex road/Nali construction from Dr. Kishori Sharan to MRF centre Badagaon.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jhansi· #12336

    ₹5.0 L Completed 28 Apr 2025Rec. 23 Aug 2023Paid ₹5.0 L
  • Apex road/Nali construction from Sachin Babu saini house to dheemar colony Badagaon.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jhansi· #12337

    ₹7.0 L Completed 28 Apr 2025Rec. 23 Aug 2023Paid ₹7.0 L

17th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi100%100%296100
2Mahesh Sharma · Gautam Buddha Nagar100%97%8899
3Anurag Sharma · Jhansi100%100%13798
4Seyed Tufail Hasan · Moradabad100%98%18897
5Shri Ajay (Teni) Misra · Kheri97%97%5197
6Shri Kunwar Danish Ali · Amroha100%97%32597
7Kirti Vardhan Singh · Gonda96%96%13096
8Girish Chandra · Nagina95%95%23896
9Shri Lallu Singh · Faizabad98%94%6296
10Shri Shafiqur Rahman Barq · Sambhal99%97%20695
11Rajesh Verma · Sitapur100%100%2295
12Prof SP Singh Baghel · Agra100%100%3695

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.