11th of 81 from Uttar Pradesh
Payments concentrated with one vendor
57% of vendor payments went to SWATANTRA ENTERPRISES.
Allocated limit
₹7.36 Cr
Median ₹8.60 Cr
Fund utilisation
100%
₹7.35 Cr recommended · 22 works
About the median
Paid to vendors
₹7.35 Cr
100% of allocation
Above median (88%)
Works completed
22
100% of recommended
Above median (83%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP22 works
₹7.35 Cr · 100% of the ₹7.36 Cr allocated
- Sanctioned by the district22 works
100% sanctioned · took 46 days on average (due within 45 days)
- Completed22 works
₹7.35 Cr final cost · 8.3 months from recommendation on average
In plain words
What the numbers say
- Recommended 22 works worth ₹7.35 Cr, a fund utilisation of 100%, higher than 76% of 17th Lok Sabha MPs.
- The district has sanctioned 22 of them, taking 46 days on average.
- ₹7.35 Cr has been paid to vendors, 100% of the allocation.
- 22 works are complete, typically 8.3 months after recommendation. 22 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 9 vendors. The largest received 57%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 95/100: finishing works counts most
- Works completed 30%100Completed ÷ recommended works.
- Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%100Paid to vendors ÷ allocated limit.
- Vendor diversity 10%54How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: SWATANTRA ENTERPRISES, 57% of payments across 9 vendors.
District sanction speed
100/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%100Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
22 works · tap “Photos” to see geo-tagged photos from eSAKSHI
SUPPLY AND INSTALLATION OF LED SEMI HIGH MAST LIGHT AT DIFFERENT PLACES FOR 4 NOS LIGHT
Electricity & lightingLighting of public spaces· Sitapur· #54584
₹2.36 Cr Completed 14 Feb 2025Rec. 29 Nov 2023Paid ₹2.36 CrSARASWATI VIDYA MANDIR H.S.SCHOOL MADHAV NAGAR MUNSHI GANJ M 113.50MT BAUNDARY WALL CONSTRUCTION
Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Sitapur· #79051
₹13.6 L Completed 2 Jul 2024Rec. 10 Jan 2024Paid ₹13.6 LCONST. OF COMMUNITY TOILET NEAR TARAK NATH MANDIR
Sanitation & drainageConstruction of toilet blocks· Sitapur· #536
₹12.5 L Completed 7 Jun 2024Rec. 7 Jun 2023Paid ₹12.5 LGP KLARAK NAGAR K MAJRA TIKKANPUR M PRAI RIVAR PR 3 SPAN KI BARI RCC PULIYA NIRMAN KARYA ALIYA
Roads & bridgesConstruction of culverts and bridges· Sitapur· #1590
₹39.9 L Completed 19 Apr 2024Rec. 24 Jun 2023Paid ₹39.9 LCONST OF RCC PULIYA
Roads & bridgesConstruction of culverts and bridges· Sitapur· #537
₹22.4 L Completed 18 Apr 2024Rec. 7 Jun 2023Paid ₹22.4 LKURMINPURWA GAON M SARWAN KUMAR K GHAR SE PRATHMIK VIDHALIYA TAK INERLOCKING AND NALI NIRMAN
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sitapur· #559
₹16.7 L Completed 18 Apr 2024Rec. 7 Jun 2023Paid ₹16.7 LBODHE PURWA SAMPARK MARG SE DARIYAPUR M PURANI INTERLOCKING TAK INTERLOCKING NIRMAN
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sitapur· #560
₹21.8 L Completed 18 Apr 2024Rec. 7 Jun 2023Paid ₹21.8 Lkanwa khera damar road se imaliya kothi ki aur solaing nirman karya 600 mt length GP SARAI BHAT BLOCK KHAIRABAD
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sitapur· #1582
₹15.9 L Completed 18 Apr 2024Rec. 24 Jun 2023Paid ₹15.9 LKANDI AND NIRMALPURWA K MADHYA DRAIN 8*1200 MM DIA KA RAPTA NIRMAN KARYA GP GOLAK KODAR -REUSA
Roads & bridgesConstruction of culverts and bridges· Sitapur· #1583
₹40.0 L Completed 18 Apr 2024Rec. 24 Jun 2023Paid ₹40.0 LBHITHANA GAON K PASS DRAIN PR RCC PULIYA NIRMAN KARYA GP BHITHANAFARR- REUSA
Roads & bridgesConstruction of culverts and bridges· Sitapur· #1585
₹40.0 L Completed 18 Apr 2024Rec. 24 Jun 2023Paid ₹40.0 LGP RAMUWAPUR M BELHA RAMUWAPUR SAMPARK MARG PR LAUKIPURWA K PASS TALAB K KINARE 8*900 MM DIA KA RAPTA NIRMA KARYA
Roads & bridgesConstruction of culverts and bridges· Sitapur· #1586
₹40.0 L Completed 18 Apr 2024Rec. 24 Jun 2023Paid ₹40.0 LGP BELHA M BELHA RAMUWAPUR SAMPARK MARG PR BELHA K PASS TALAB K KINARE 3 SPAN KI BARI RCC PULIYA KA NIRMAN KARYA
Roads & bridgesConstruction of culverts and bridges· Sitapur· #1587
₹40.0 L Completed 18 Apr 2024Rec. 24 Jun 2023Paid ₹40.0 LGP HAJARATPUR M REUSA TAMBAUR DAMAR ROAD SE HAJARATPUR GAON TAK SOLAING AND 2*900 MM DIA KI 1 NAG PULIYA NIRMAN KARYA LENGTH 1140 MT
Roads & bridgesConstruction of culverts and bridges· Sitapur· #1588
₹35.0 L Completed 18 Apr 2024Rec. 24 Jun 2023Paid ₹35.0 LGP HAJARATPUR M SISAIYA DARIYANA DAMAR ROAD SE HATHA GAON TAK SOLIANG NIRMAN KARYA LENGTH 381 MT BLOCK BEHTA
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sitapur· #1589
₹10.0 L Completed 18 Apr 2024Rec. 24 Jun 2023Paid ₹10.0 LGP PARA K LAHERPUR KHAIRABAD SAMPARK MARG PR SARYAN CHAURHA SE J.S.SINGH VIDHALIYA TAK 190 MT INTERLOCKING WORK
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sitapur· #34836
₹14.4 L Completed 18 Apr 2024Rec. 9 Oct 2023Paid ₹14.4 L
17th Lok Sabha MPs from Uttar Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Shri Narendra Modi · Varanasi | 100% | 100% | 296 | 100 |
| 2 | Mahesh Sharma · Gautam Buddha Nagar | 100% | 97% | 88 | 99 |
| 3 | Anurag Sharma · Jhansi | 100% | 100% | 137 | 98 |
| 4 | Seyed Tufail Hasan · Moradabad | 100% | 98% | 188 | 97 |
| 5 | Shri Ajay (Teni) Misra · Kheri | 97% | 97% | 51 | 97 |
| 6 | Shri Kunwar Danish Ali · Amroha | 100% | 97% | 325 | 97 |
| 7 | Kirti Vardhan Singh · Gonda | 96% | 96% | 130 | 96 |
| 8 | Girish Chandra · Nagina | 95% | 95% | 238 | 96 |
| 9 | Shri Lallu Singh · Faizabad | 98% | 94% | 62 | 96 |
| 10 | Shri Shafiqur Rahman Barq · Sambhal | 99% | 97% | 206 | 95 |
| 11 | Rajesh Verma · Sitapur | 100% | 100% | 22 | 95 |
| 12 | Prof SP Singh Baghel · Agra | 100% | 100% | 36 | 95 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.