Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Rajesh Verma

Lok SabhaSitapur · Uttar Pradesh

MP score95/10050th of 539 in the 17th Lok Sabha
11th of 81 from Uttar Pradesh
  • Payments concentrated with one vendor

    57% of vendor payments went to SWATANTRA ENTERPRISES.

Allocated limit

₹7.36 Cr

Median ₹8.60 Cr

Fund utilisation

100%

₹7.35 Cr recommended · 22 works
About the median

Paid to vendors

₹7.35 Cr

100% of allocation
Above median (88%)

Works completed

22

100% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP22 works

    ₹7.35 Cr · 100% of the ₹7.36 Cr allocated

  2. Sanctioned by the district22 works

    100% sanctioned · took 46 days on average (due within 45 days)

  3. Completed22 works

    ₹7.35 Cr final cost · 8.3 months from recommendation on average

In plain words

What the numbers say

  • Recommended 22 works worth ₹7.35 Cr, a fund utilisation of 100%, higher than 76% of 17th Lok Sabha MPs.
  • The district has sanctioned 22 of them, taking 46 days on average.
  • ₹7.35 Cr has been paid to vendors, 100% of the allocation.
  • 22 works are complete, typically 8.3 months after recommendation. 22 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 9 vendors. The largest received 57%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 95/100: finishing works counts most

  1. Works completed 30%100Completed ÷ recommended works.
  2. Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%100Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    54
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: SWATANTRA ENTERPRISES, 57% of payments across 9 vendors.

District sanction speed

100/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%100Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

22 works · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • SUPPLY AND INSTALLATION OF LED SEMI HIGH MAST LIGHT AT DIFFERENT PLACES FOR 4 NOS LIGHT

    Electricity & lightingLighting of public spaces· Sitapur· #54584

    ₹2.36 Cr Completed 14 Feb 2025Rec. 29 Nov 2023Paid ₹2.36 Cr
  • SARASWATI VIDYA MANDIR H.S.SCHOOL MADHAV NAGAR MUNSHI GANJ M 113.50MT BAUNDARY WALL CONSTRUCTION

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Sitapur· #79051

    ₹13.6 L Completed 2 Jul 2024Rec. 10 Jan 2024Paid ₹13.6 L
  • CONST. OF COMMUNITY TOILET NEAR TARAK NATH MANDIR

    Sanitation & drainageConstruction of toilet blocks· Sitapur· #536

    ₹12.5 L Completed 7 Jun 2024Rec. 7 Jun 2023Paid ₹12.5 L
  • GP KLARAK NAGAR K MAJRA TIKKANPUR M PRAI RIVAR PR 3 SPAN KI BARI RCC PULIYA NIRMAN KARYA ALIYA

    Roads & bridgesConstruction of culverts and bridges· Sitapur· #1590

    ₹39.9 L Completed 19 Apr 2024Rec. 24 Jun 2023Paid ₹39.9 L
  • CONST OF RCC PULIYA

    Roads & bridgesConstruction of culverts and bridges· Sitapur· #537

    ₹22.4 L Completed 18 Apr 2024Rec. 7 Jun 2023Paid ₹22.4 L
  • KURMINPURWA GAON M SARWAN KUMAR K GHAR SE PRATHMIK VIDHALIYA TAK INERLOCKING AND NALI NIRMAN

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sitapur· #559

    ₹16.7 L Completed 18 Apr 2024Rec. 7 Jun 2023Paid ₹16.7 L
  • BODHE PURWA SAMPARK MARG SE DARIYAPUR M PURANI INTERLOCKING TAK INTERLOCKING NIRMAN

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sitapur· #560

    ₹21.8 L Completed 18 Apr 2024Rec. 7 Jun 2023Paid ₹21.8 L
  • kanwa khera damar road se imaliya kothi ki aur solaing nirman karya 600 mt length GP SARAI BHAT BLOCK KHAIRABAD

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sitapur· #1582

    ₹15.9 L Completed 18 Apr 2024Rec. 24 Jun 2023Paid ₹15.9 L
  • KANDI AND NIRMALPURWA K MADHYA DRAIN 8*1200 MM DIA KA RAPTA NIRMAN KARYA GP GOLAK KODAR -REUSA

    Roads & bridgesConstruction of culverts and bridges· Sitapur· #1583

    ₹40.0 L Completed 18 Apr 2024Rec. 24 Jun 2023Paid ₹40.0 L
  • BHITHANA GAON K PASS DRAIN PR RCC PULIYA NIRMAN KARYA GP BHITHANAFARR- REUSA

    Roads & bridgesConstruction of culverts and bridges· Sitapur· #1585

    ₹40.0 L Completed 18 Apr 2024Rec. 24 Jun 2023Paid ₹40.0 L
  • GP RAMUWAPUR M BELHA RAMUWAPUR SAMPARK MARG PR LAUKIPURWA K PASS TALAB K KINARE 8*900 MM DIA KA RAPTA NIRMA KARYA

    Roads & bridgesConstruction of culverts and bridges· Sitapur· #1586

    ₹40.0 L Completed 18 Apr 2024Rec. 24 Jun 2023Paid ₹40.0 L
  • GP BELHA M BELHA RAMUWAPUR SAMPARK MARG PR BELHA K PASS TALAB K KINARE 3 SPAN KI BARI RCC PULIYA KA NIRMAN KARYA

    Roads & bridgesConstruction of culverts and bridges· Sitapur· #1587

    ₹40.0 L Completed 18 Apr 2024Rec. 24 Jun 2023Paid ₹40.0 L
  • GP HAJARATPUR M REUSA TAMBAUR DAMAR ROAD SE HAJARATPUR GAON TAK SOLAING AND 2*900 MM DIA KI 1 NAG PULIYA NIRMAN KARYA LENGTH 1140 MT

    Roads & bridgesConstruction of culverts and bridges· Sitapur· #1588

    ₹35.0 L Completed 18 Apr 2024Rec. 24 Jun 2023Paid ₹35.0 L
  • GP HAJARATPUR M SISAIYA DARIYANA DAMAR ROAD SE HATHA GAON TAK SOLIANG NIRMAN KARYA LENGTH 381 MT BLOCK BEHTA

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sitapur· #1589

    ₹10.0 L Completed 18 Apr 2024Rec. 24 Jun 2023Paid ₹10.0 L
  • GP PARA K LAHERPUR KHAIRABAD SAMPARK MARG PR SARYAN CHAURHA SE J.S.SINGH VIDHALIYA TAK 190 MT INTERLOCKING WORK

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sitapur· #34836

    ₹14.4 L Completed 18 Apr 2024Rec. 9 Oct 2023Paid ₹14.4 L

17th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi100%100%296100
2Mahesh Sharma · Gautam Buddha Nagar100%97%8899
3Anurag Sharma · Jhansi100%100%13798
4Seyed Tufail Hasan · Moradabad100%98%18897
5Shri Ajay (Teni) Misra · Kheri97%97%5197
6Shri Kunwar Danish Ali · Amroha100%97%32597
7Kirti Vardhan Singh · Gonda96%96%13096
8Girish Chandra · Nagina95%95%23896
9Shri Lallu Singh · Faizabad98%94%6296
10Shri Shafiqur Rahman Barq · Sambhal99%97%20695
11Rajesh Verma · Sitapur100%100%2295
12Prof SP Singh Baghel · Agra100%100%3695

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.