Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Shri Lallu Singh

Lok SabhaFaizabad · Uttar Pradesh

MP score96/10044th of 539 in the 17th Lok Sabha
9th of 81 from Uttar Pradesh

Allocated limit

₹7.36 Cr

Median ₹8.60 Cr

Fund utilisation

98%

₹7.21 Cr recommended · 65 works
About the median

Paid to vendors

₹6.94 Cr

94% of allocation
Above median (88%)

Works completed

62

95% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP65 works

    ₹7.21 Cr · 98% of the ₹7.36 Cr allocated

  2. Sanctioned by the district65 works

    100% sanctioned · took 2.5 months on average (due within 45 days)

  3. Completed62 works

    ₹6.86 Cr final cost · 17.6 months from recommendation on average

In plain words

What the numbers say

  • Recommended 65 works worth ₹7.21 Cr, a fund utilisation of 98%, higher than 49% of 17th Lok Sabha MPs.
  • The district has sanctioned 65 of them, taking 2.5 months on average.
  • ₹6.94 Cr has been paid to vendors, 94% of the allocation.
  • 62 works are complete, typically 17.6 months after recommendation. 57 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 19 vendors. The largest received 24%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 96/100: finishing works counts most

  1. Works completed 30%95Completed ÷ recommended works.
  2. Spending efficiency 20%99Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%98Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%92Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%94Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    94
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: PRATAP CONSTRUCTION, 24% of payments across 19 vendors.

District sanction speed

95/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%95Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

65 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Nagar Nigam Ayodhya Ke Jhalkari Bai Ward (Ward No. 3) me Rajarshi Dasrath Swasasi Medical Collage me Trama Centre Ward Block ke pass Male, Female aor Handicap ke liye Toilet Block ka Nirman karya.

    Sanitation & drainageConstruction of toilet blocks· Ayodhya· #103925

    ₹28.0 L Completed 23 Apr 2026Rec. 13 Feb 2024Paid ₹28.0 L
  • Nagar Panchayat Bikapur ke Composite Vidyalay me Tin shed aor Toilet Block ka nirman karya.

    Sanitation & drainageConstruction of toilet blocks· Ayodhya· #64361

    ₹9.9 L Completed 14 Jan 2026Rec. 17 Dec 2023Paid ₹9.9 L
  • Pirkhauli ke majra Jori me Gopi Kishan ke ghar se Gangaram ki baag wa Rajkishor ke ghar hote hue Ramsurat ke ghar tak Interlocking karya.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ayodhya· #56211

    ₹11.1 L Completed 13 Jan 2026Rec. 4 Dec 2023Paid ₹11.1 L
  • Tribhawan Pasi ke ghar se Om prakash Mishra ke ghar tak interlocking nirman karya.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ayodhya· #56213

    ₹7.1 L Completed 13 Jan 2026Rec. 4 Dec 2023Paid ₹7.1 L
  • Rajendra Dom ke ghar se CC road tak interlocking karya.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ayodhya· #56214

    ₹6.1 L Completed 13 Jan 2026Rec. 4 Dec 2023Paid ₹6.1 L
  • Daulatpur ke Mokalpur me Ram Dayal ke ghar se Jay prakash mishra ke ghar tak interlocking karya.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ayodhya· #56215

    ₹9.3 L Completed 13 Jan 2026Rec. 4 Dec 2023Paid ₹9.3 L
  • Khanpur Pursayen Rasoolabad road se puliya tak CC karya.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ayodhya· #56218

    ₹8.4 L Completed 13 Jan 2026Rec. 4 Dec 2023Paid ₹8.4 L
  • Gram Panchayat Gokula me anteshi sthal ka nirman karya.

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Ayodhya· #64360

    ₹11.8 L Completed 13 Jan 2026Rec. 17 Dec 2023Paid ₹11.8 L
  • Gram Panchayat Surwari me Prathmik Vidyalay Surwari me tin shed aor toilet block ka nirman karya

    Sanitation & drainageConstruction of toilet blocks· Ayodhya· #64362

    ₹3.6 L Completed 13 Jan 2026Rec. 17 Dec 2023Paid ₹3.6 L
  • Gram Panchayat sibar me Composite Vidyalay me tin shed ka nirman karya

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Ayodhya· #64363

    ₹7.1 L Completed 13 Jan 2026Rec. 17 Dec 2023Paid ₹7.1 L
  • Block Milkipur me Milkipur Amaniganj road se Ankit Shukla (Akhil Bhartiya Vidyarthi Parishad) ke ghar tak interlocking karya.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ayodhya· #78521

    ₹3.0 L Completed 13 Jan 2026Rec. 9 Jan 2024Paid ₹3.0 L
  • Block Harringtonganj me Gramsabha Rurukhas majre Parlipur me Ashok Mishra ki Tubewell se Ramesh Mishra ke Sauchalaya tak interlocking road karya.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ayodhya· #78524

    ₹11.1 L Completed 13 Jan 2026Rec. 9 Jan 2024Paid ₹11.1 L
  • Block Sohawal me Gramsabha Moiya Kapoorpur Majre Brijlal tiwari Purwa me pakki sadak se B.D. Tiwari ke ghar tak CC karya.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ayodhya· #78525

    ₹9.7 L Completed 13 Jan 2026Rec. 9 Jan 2024Paid ₹9.7 L
  • Nagar Panchayat kumarganj NH-330A se Chandrabali Singh Urmila PG Collage Shivnagar tak CC Karya.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ayodhya· #78526

    ₹10.1 L Completed 13 Jan 2026Rec. 9 Jan 2024Paid ₹10.1 L
  • Dhanaich Kund Mohalla Janki Vihar Colony ke peeche Rampal ke ghar se Ramraj Master ke ghar tak Nali aor Marg ka Ucchikarn Karya.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ayodhya· #103997

    ₹5.4 L Completed 13 Jan 2026Rec. 13 Feb 2024Paid ₹5.4 L

17th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi100%100%296100
2Mahesh Sharma · Gautam Buddha Nagar100%97%8899
3Anurag Sharma · Jhansi100%100%13798
4Seyed Tufail Hasan · Moradabad100%98%18897
5Shri Ajay (Teni) Misra · Kheri97%97%5197
6Shri Kunwar Danish Ali · Amroha100%97%32597
7Kirti Vardhan Singh · Gonda96%96%13096
8Girish Chandra · Nagina95%95%23896
9Shri Lallu Singh · Faizabad98%94%6296
10Shri Shafiqur Rahman Barq · Sambhal99%97%20695
11Rajesh Verma · Sitapur100%100%2295
12Prof SP Singh Baghel · Agra100%100%3695

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.