This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Kirti Vardhan Singh

Lok SabhaGonda · Uttar Pradesh

MP score96/10034th of 539 in the 17th Lok Sabha
7th of 81 from Uttar Pradesh
Re-elected to the 18th Lok Sabha Then: 76% utilisation, 40 works completed, score 56.

Allocated limit

₹9.81 Cr

Median ₹8.60 Cr

Fund utilisation

96%

₹9.45 Cr recommended · 135 works
About the median

Paid to vendors

₹9.44 Cr

96% of allocation
Above median (88%)

Works completed

130

96% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP135 works

    ₹9.45 Cr · 96% of the ₹9.81 Cr allocated

  2. Sanctioned by the district132 works

    98% sanctioned · took 32 days on average (due within 45 days)

  3. Completed130 works

    ₹9.00 Cr final cost · 22.5 months from recommendation on average

3 works are still awaiting sanction, 3 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 135 works worth ₹9.45 Cr, a fund utilisation of 96%, higher than 39% of 17th Lok Sabha MPs.
  • The district has sanctioned 132 of them, taking 32 days on average.
  • ₹9.44 Cr has been paid to vendors, 96% of the allocation.
  • 130 works are complete, typically 22.5 months after recommendation. 128 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 25 vendors. The largest received 25%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 96/100: finishing works counts most

  1. Works completed 30%96Completed ÷ recommended works.
  2. Spending efficiency 20%95Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%96Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%98Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%96Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    94
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: AMARNATH PANDEY AMARNATH PANDEY CONTRACTOR, 25% of payments across 25 vendors.

District sanction speed

99/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%99Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

137 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Interlocking construction work of about 150 meters length from Gram Panchayat Kuwarpal, Mauja-Dadwa PWD Road to Balgovind Yadav's house.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gorakhpur· #102264

    ₹4.5 L Completed 20 Feb 2026Paid ₹4.5 L
  • S.No.13 Interlocking work of 150 meters length on the road leading from Chaypurwa Purvanchal RED Interlocking to Asphalt Road in village Pangaya Bujarg.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gonda· #114688

    ₹7.2 L Completed 17 Jan 2026Rec. 25 Feb 2024Paid ₹7.2 L
  • S.No.7 Construction work of 500 meters long earthen/Khadanja and one 900 mm hume pipe culvert from the front of the culvert from Harhara side between Harhara Ekma.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gonda· #114990

    ₹12.9 L Completed 17 Jan 2026Rec. 26 Feb 2024Paid ₹12.9 L
  • S.No.11 Interlocking work in 150 meter length from Banghusra to Kutti intersection.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gonda· #114686

    ₹6.6 L Completed 14 Nov 2025Rec. 25 Feb 2024Paid ₹6.6 L
  • S.No. 10- Interlocking work of 100 meters length on the road from Chetram's farm to America's house.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gonda· #44155

    ₹4.8 L Completed 12 Nov 2025Rec. 3 Nov 2023Paid ₹4.8 L
  • S.No. 5- Interlocking work of 200 meters length on Chhotka Turkadiha road from Belwa pented road.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gonda· #44185

    ₹9.4 L Completed 12 Nov 2025Rec. 3 Nov 2023Paid ₹9.4 L
  • S.No. 6- Interlocking work of 200 meters length on the road leading from PWD Road to Ram Narayan's house via Jhalmal Munnababa Temple.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gonda· #44186

    ₹8.1 L Completed 12 Nov 2025Rec. 3 Nov 2023Paid ₹8.1 L
  • S.No. 7- Interlocking work in 125 meter length on the road leading from Pradhan Mantri Road to Nauwanpurwa pented road.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gonda· #44187

    ₹5.5 L Completed 12 Nov 2025Rec. 3 Nov 2023Paid ₹5.5 L
  • S.No. 8- Interlocking work of 150 meters length on the road leading from Katra Basti Highway to the house of Brishbhan Singh via his farm.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gonda· #44188

    ₹7.0 L Completed 12 Nov 2025Rec. 3 Nov 2023Paid ₹7.0 L
  • S.No. 10- Interlocking work in 200 meter length on the road leading from primary school to Dinesh Mishra's house via Harinarayan Yadav's house.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gonda· #44190

    ₹8.8 L Completed 12 Nov 2025Rec. 3 Nov 2023Paid ₹8.8 L
  • S.No. 12- Interlocking work of 100 meters length on the road leading to Prithviraj Singh's house from Chatolwa road in Magdoompur.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gonda· #44192

    ₹4.7 L Completed 12 Nov 2025Rec. 3 Nov 2023Paid ₹4.7 L
  • S.No. 6- Interlocking work of 57 meter length on the link road to Durgesh Verma's house in Majra Jhalhiya.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gonda· #44232

    ₹2.9 L Completed 12 Nov 2025Rec. 3 Nov 2023Paid ₹2.9 L
  • S.NO. 1 Interlocking work in 100 meter length from Hariprasad's house to Panchayat Bhawan road.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gonda· #57534

    ₹4.4 L Completed 12 Nov 2025Rec. 6 Dec 2023Paid ₹4.4 L
  • S.No. 5 Interlocking work of 200 meters length on Pvt. Achalpur road from front of the asphalt road in Majra Achalpur via Raghunandan's house.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gonda· #57538

    ₹8.8 L Completed 12 Nov 2025Rec. 6 Dec 2023Paid ₹8.8 L
  • S.No. 7 Interlocking work of 100 meters length on the road going from Kunwar Saheb Singh's house to Purba Bagh.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gonda· #57540

    ₹4.4 L Completed 12 Nov 2025Rec. 6 Dec 2023Paid ₹4.4 L

17th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi100%100%296100
2Mahesh Sharma · Gautam Buddha Nagar100%97%8899
3Anurag Sharma · Jhansi100%100%13798
4Seyed Tufail Hasan · Moradabad100%98%18897
5Shri Ajay (Teni) Misra · Kheri97%97%5197
6Shri Kunwar Danish Ali · Amroha100%97%32597
7Kirti Vardhan Singh · Gonda96%96%13096
8Girish Chandra · Nagina95%95%23896
9Shri Lallu Singh · Faizabad98%94%6296
10Shri Shafiqur Rahman Barq · Sambhal99%97%20695
11Rajesh Verma · Sitapur100%100%2295
12Prof SP Singh Baghel · Agra100%100%3695

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.