Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Shri Shafiqur Rahman Barq

Lok SabhaSambhal · Uttar Pradesh

MP score95/10049th of 539 in the 17th Lok Sabha
10th of 81 from Uttar Pradesh

Allocated limit

₹4.91 Cr

Median ₹8.60 Cr

Fund utilisation

99%

₹4.85 Cr recommended · 209 works
About the median

Paid to vendors

₹4.74 Cr

97% of allocation
Above median (88%)

Works completed

206

99% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP209 works

    ₹4.85 Cr · 99% of the ₹4.91 Cr allocated

  2. Sanctioned by the district207 works

    99% sanctioned · took 45 days on average (due within 45 days)

  3. Completed206 works

    ₹4.74 Cr final cost · 18.5 months from recommendation on average

2 works are still awaiting sanction, 2 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 209 works worth ₹4.85 Cr, a fund utilisation of 99%, higher than 57% of 17th Lok Sabha MPs.
  • The district has sanctioned 207 of them, taking 45 days on average.
  • ₹4.74 Cr has been paid to vendors, 97% of the allocation.
  • 206 works are complete, typically 18.5 months after recommendation. 206 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 5 vendors. The largest received 49%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 95/100: finishing works counts most

  1. Works completed 30%99Completed ÷ recommended works.
  2. Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%99Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%97Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    64
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: NATIONAL INFRATECH, 49% of payments across 5 vendors.

District sanction speed

100/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%100Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

209 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • GRAM CHANGERI BLOCK BILARI ME CHORAHE KE PASS SEMI HIGH MAST L.E.D LIGHT (04 LIGHTO WALI) KARYDAYI SANSTHA UPSIC MORADABAD)

    Electricity & lightingLighting of public spaces· Moradabad· #51207

    ₹1.5 L Completed 7 Sept 2026Rec. 21 Nov 2023Paid ₹1.5 L
  • GRAM SATARAN BLOCK BILARI ME CHORAHE KE PASS SEMI HIGH MAST L.E.D LIGHT (04 LIGHTO WALI) KARYDAYI SANSTHA UPSIC MORADABAD)

    Electricity & lightingLighting of public spaces· Moradabad· #51208

    ₹1.5 L Completed 7 Sept 2026Rec. 21 Nov 2023Paid ₹1.5 L
  • GRAM SISONA BLOCK BILARI ME CHORAHE KE PASS SEMI HIGH MAST L.E.D LIGHT (04 LIGHTO WALI) KARYDAYI SANSTHA UPSIC MORADABAD)

    Electricity & lightingLighting of public spaces· Moradabad· #51212

    ₹1.5 L Completed 7 Sept 2026Rec. 21 Nov 2023Paid ₹1.5 L
  • VIKAS KHAND BILARI KE GRAM SATARAN MOHD SALMAN KE MAKAAN SE JULFEKAR BHAI KE MAKAAN KI TARAF LGBHG 100 METER CC TILES NALI NIRMAAN KARYA

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Moradabad· #84381

    ₹11.2 L Completed 7 Sept 2026Rec. 18 Jan 2024Paid ₹11.2 L
  • VIKAS KHAND BILARI KE GRAM RUSTAM NAGAR SAHASPUR ME RANI PRITAM KUNWAR SCHOOL SE SADAK KI TARAF LAGBHAG 100 METER CC TILES NALI NIRMAAN KARYA

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Moradabad· #84382

    ₹9.8 L Completed 7 Sept 2026Rec. 18 Jan 2024Paid ₹9.8 L
  • VIKAS KHAND BILARI GRAM BICHOLA DHOOKI ME MASJID SE KAYYUM BHAI KE MAKAAN KI TARAF LGBHAG 80 METER CC TILES TILES NALI NIRMAN KARYA

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Moradabad· #84383

    ₹7.9 L Completed 7 Sept 2026Rec. 18 Jan 2024Paid ₹7.9 L
  • GRAM NAHAR THAIR BLOCK SAMBHAL M KABRISTAN KE PASS SAMI HIGH MAST LIGHT (04 LIGHTO WALI)

    Electricity & lightingLighting of public spaces· Sambhal· #26659

    ₹1.4 L Completed 8 Apr 2026Rec. 26 Sep 2023Paid ₹1.4 L
  • GRAM DHAK SHAHID BLOCK ASMOLI ME KABRISTAN KE PASS SAMI HIGH MAST LIGHT (04 LIGHTO WALI)

    Electricity & lightingLighting of public spaces· Sambhal· #26660

    ₹1.4 L Completed 8 Apr 2026Rec. 26 Sep 2023Paid ₹1.4 L
  • GRAM BHAWANIPUR BLOCK PANWASA ME KABRISTAN KE PASS SAMI HIGH MAST LIGHT (04 LIGHTO WALI)

    Electricity & lightingLighting of public spaces· Sambhal· #26661

    ₹1.4 L Completed 8 Apr 2026Rec. 26 Sep 2023Paid ₹1.4 L
  • GRAM HINDOLI BLOCK PANWASA ME KABRISTAN KE PASS SAMI HIGH MAST LIGHT (04 LIGHTO WALI)

    Electricity & lightingLighting of public spaces· Sambhal· #26663

    ₹1.4 L Completed 8 Apr 2026Rec. 26 Sep 2023Paid ₹1.4 L
  • GRAM DHURETA BLOCK PANWASA ME KABRISTAN KE PASS SAMI HIGH MAST LIGHT (04 LIGHTO WALI)

    Electricity & lightingLighting of public spaces· Sambhal· #26870

    ₹1.4 L Completed 8 Apr 2026Rec. 26 Sep 2023Paid ₹1.4 L
  • GRAM NEHROLI BLOCK ASMAULI ME MASJID KE PASS SEMI HIGH MAST L.E.D LIGHT (04 LIGHTO WALI) KARYDAYI SANSTHA UPSIC MORADABAD

    Electricity & lightingLighting of public spaces· Sambhal· #51353

    ₹1.4 L Completed 8 Apr 2026Rec. 21 Nov 2023Paid ₹1.4 L
  • GRAM RAJAPUR GHALIBPUR BLOCK ASMAULI ME KABRISTAN KE PASS SEMI HIGH MAST L.E.D LIGHT (04 LIGHTO WALI) KARYDAYI SANSTHA UPSIC MORADABAD

    Electricity & lightingLighting of public spaces· Sambhal· #51354

    ₹1.4 L Completed 8 Apr 2026Rec. 21 Nov 2023Paid ₹1.4 L
  • GRAM RAJAPUR GHALIBPUR BLOCK ASMAULI ME DUSRE KABRISTAN KE PASS SEMI HIGH MAST L.E.D LIGHT (04 LIGHTO WALI) KARYDAYI SANSTHA UPSIC MORADABAD

    Electricity & lightingLighting of public spaces· Sambhal· #51355

    ₹1.4 L Completed 8 Apr 2026Rec. 21 Nov 2023Paid ₹1.4 L
  • GRAM RAMNAGAR BLOCK ASMAULI ME KABRISTAN KE PASS SEMI HIGH MAST L.E.D LIGHT (04 LIGHTO WALI) KARYDAYI SANSTHA UPSIC MORADABAD

    Electricity & lightingLighting of public spaces· Sambhal· #51357

    ₹1.4 L Completed 8 Apr 2026Rec. 21 Nov 2023Paid ₹1.4 L

17th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi100%100%296100
2Mahesh Sharma · Gautam Buddha Nagar100%97%8899
3Anurag Sharma · Jhansi100%100%13798
4Seyed Tufail Hasan · Moradabad100%98%18897
5Shri Ajay (Teni) Misra · Kheri97%97%5197
6Shri Kunwar Danish Ali · Amroha100%97%32597
7Kirti Vardhan Singh · Gonda96%96%13096
8Girish Chandra · Nagina95%95%23896
9Shri Lallu Singh · Faizabad98%94%6296
10Shri Shafiqur Rahman Barq · Sambhal99%97%20695
11Rajesh Verma · Sitapur100%100%2295
12Prof SP Singh Baghel · Agra100%100%3695

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.