Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Prof SP Singh Baghel

Lok SabhaSC seatAgra · Uttar Pradesh

MP score95/10059th of 539 in the 17th Lok Sabha
12th of 81 from Uttar Pradesh
Re-elected to the 18th Lok Sabha Then: 100% utilisation, 55 works completed, score 69.
  • Payments concentrated with one vendor

    61% of vendor payments went to TANYA CONSTRUCTION.

Allocated limit

₹4.91 Cr

Median ₹8.60 Cr

Fund utilisation

100%

₹4.89 Cr recommended · 36 works
About the median

Paid to vendors

₹4.89 Cr

100% of allocation
Above median (88%)

Works completed

36

100% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP36 works

    ₹4.89 Cr · 100% of the ₹4.91 Cr allocated

  2. Sanctioned by the district36 works

    100% sanctioned · took 15 days on average (due within 45 days)

  3. Completed36 works

    ₹4.89 Cr final cost · 27.2 months from recommendation on average

In plain words

What the numbers say

  • Recommended 36 works worth ₹4.89 Cr, a fund utilisation of 100%, higher than 74% of 17th Lok Sabha MPs.
  • The district has sanctioned 36 of them, taking 15 days on average.
  • ₹4.89 Cr has been paid to vendors, 100% of the allocation.
  • 36 works are complete, typically 27.2 months after recommendation. 36 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 2 vendors. The largest received 61%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 95/100: finishing works counts most

  1. Works completed 30%100Completed ÷ recommended works.
  2. Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%100Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    49
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: TANYA CONSTRUCTION, 61% of payments across 2 vendors.

District sanction speed

100/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%100Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

36 works · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • cc work in nai ki saray agra from rajbir house to mahabir house

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Agra· #40195

    ₹17.1 L Completed 30 Jan 2026Rec. 25 Oct 2023Paid ₹17.1 L
  • construction of cc road from agra jagner road to dori lal house

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Agra· #40237

    ₹26.1 L Completed 30 Jan 2026Rec. 25 Oct 2023Paid ₹26.1 L
  • construction of cc road from manoj lalwani house to ramesh chandra house

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Agra· #40238

    ₹22.8 L Completed 30 Jan 2026Rec. 25 Oct 2023Paid ₹22.8 L
  • construction of cc road from sardar ji bulding metarial to shyam ji marbal in dushyant sikandra

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Agra· #40239

    ₹28.3 L Completed 30 Jan 2026Rec. 25 Oct 2023Paid ₹28.3 L
  • construction of cc road from agra jagner road to barwali gali daroga ji house

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Agra· #40240

    ₹13.2 L Completed 30 Jan 2026Rec. 25 Oct 2023Paid ₹13.2 L
  • construction of cc road from dr sk singh housse shop to munnesh baghel house in khandari chok agra

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Agra· #40241

    ₹35.5 L Completed 30 Jan 2026Rec. 25 Oct 2023Paid ₹35.5 L
  • construction of cc road from nekram house to mahesh house in sikandra

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Agra· #40242

    ₹27.7 L Completed 30 Jan 2026Rec. 25 Oct 2023Paid ₹27.7 L
  • construction of cc road from hari singh house to gyan singh house in indra nagar transh yamuna colony

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Agra· #40243

    ₹11.1 L Completed 30 Jan 2026Rec. 25 Oct 2023Paid ₹11.1 L
  • Construction of CC road From ravisharma house to bhola thakur house in anand nagar

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Agra· #40270

    ₹17.1 L Completed 30 Jan 2026Rec. 25 Oct 2023Paid ₹17.1 L
  • Construction of CC road From vikram sharma house to ramlakhan sharma house in sarswati bihar sevala

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Agra· #40271

    ₹19.1 L Completed 30 Jan 2026Rec. 25 Oct 2023Paid ₹19.1 L
  • Construction of CC road From Abhishek updhyay house to dataram house in sec 10 avas vikas colony sikandra

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Agra· #40272

    ₹11.2 L Completed 30 Jan 2026Rec. 25 Oct 2023Paid ₹11.2 L
  • Construction of CC road From pramod sharma house to naveen sharma house in garhi bhadauriya

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Agra· #40273

    ₹4.7 L Completed 30 Jan 2026Rec. 25 Oct 2023Paid ₹4.7 L
  • Construction of CC road From birpal house to raju house in burj akbarpur parihar

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Agra· #40274

    ₹30.7 L Completed 30 Jan 2026Rec. 25 Oct 2023Paid ₹30.7 L
  • Construction of CC road From parihar chauraha to birpal house in village parihar

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Agra· #40275

    ₹19.6 L Completed 30 Jan 2026Rec. 25 Oct 2023Paid ₹19.6 L
  • Construction of CC road From rameshwar baghel plot to son devi house in hasanpur nagala harshukh baghel basti

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Agra· #40276

    ₹22.8 L Completed 30 Jan 2026Rec. 25 Oct 2023Paid ₹22.8 L

17th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi100%100%296100
2Mahesh Sharma · Gautam Buddha Nagar100%97%8899
3Anurag Sharma · Jhansi100%100%13798
4Seyed Tufail Hasan · Moradabad100%98%18897
5Shri Ajay (Teni) Misra · Kheri97%97%5197
6Shri Kunwar Danish Ali · Amroha100%97%32597
7Kirti Vardhan Singh · Gonda96%96%13096
8Girish Chandra · Nagina95%95%23896
9Shri Lallu Singh · Faizabad98%94%6296
10Shri Shafiqur Rahman Barq · Sambhal99%97%20695
11Rajesh Verma · Sitapur100%100%2295
12Prof SP Singh Baghel · Agra100%100%3695

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.