Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Shri Narendra Modi

Lok SabhaVaranasi · Uttar Pradesh

MP score100/1001st of 539 in the 17th Lok Sabha
1st of 81 from Uttar Pradesh
Re-elected to the 18th Lok Sabha Then: 62% utilisation, 207 works completed, score 89.

Allocated limit

₹10.77 Cr

Median ₹8.60 Cr

Fund utilisation

100%

₹10.75 Cr recommended · 296 works
About the median

Paid to vendors

₹10.75 Cr

100% of allocation
Above median (88%)

Works completed

296

100% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP296 works

    ₹10.75 Cr · 100% of the ₹10.77 Cr allocated

  2. Sanctioned by the district296 works

    100% sanctioned · took 6 days on average (due within 45 days)

  3. Completed296 works

    ₹10.75 Cr final cost · 4.8 months from recommendation on average

In plain words

What the numbers say

  • Recommended 296 works worth ₹10.75 Cr, a fund utilisation of 100%, higher than 74% of 17th Lok Sabha MPs.
  • The district has sanctioned 296 of them, taking 6 days on average.
  • ₹10.75 Cr has been paid to vendors, 100% of the allocation.
  • 296 works are complete, typically 4.8 months after recommendation. 295 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 68 vendors. The largest received 13%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 100/100: finishing works counts most

  1. Works completed 30%100Completed ÷ recommended works.
  2. Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%100Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: SUNROVER PVT LTD, 13% of payments across 68 vendors.

District sanction speed

100/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%100Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

296 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of open gym in Dumrav Bagh Park Assi.

    Sports & fitnessInstallation of fixed garden gym equipment· Varanasi· #56676

    ₹5.0 L Completed 21 Mar 2025Rec. 5 Dec 2023Paid ₹5.0 L
  • Interlocking work from Jakhhini marg from Rajatalab to field of Suresh Singh in Milkipur village of Gram Sabha Veersinghpur. L-245.00m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #57153

    ₹11.2 L Completed 21 Mar 2025Rec. 6 Dec 2023Paid ₹11.2 L
  • Gram Sabha Gangapur Ward No. 10 Interlocking work from near the transformer to the house of Surendra Yadav. length 126 m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #120630

    ₹6.0 L Completed 21 Mar 2025Rec. 8 Mar 2024Paid ₹6.0 L
  • Construction of road from Nagai Sav's Pokhara to Surendra Maurya Bhusawale in Gram Sabha Gangapur. L. 375.00 Mtr.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #57315

    ₹10.0 L Completed 5 Mar 2025Rec. 6 Dec 2023Paid ₹10.0 L
  • Beautification and maintenance work of Municipal Corporation Park, Premchand Nagar Colony, Pandeypur ward.

    Community buildings & public spacesDevelopment of public parks· Varanasi· #56757

    ₹6.0 L Completed 19 Feb 2025Rec. 5 Dec 2023Paid ₹6.0 L
  • Beautification work of Park opposite to from U.H. -1 to 72 and from U.H.-B.-1 to 30 in ward no. 95.

    Community buildings & public spacesDevelopment of public parks· Varanasi· #56775

    ₹7.2 L Completed 19 Feb 2025Rec. 5 Dec 2023Paid ₹7.2 L
  • Interlocking work from Ward No. 48 Sujabad Raju Seth's house to SK Academy School. length 80 m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #120591

    ₹2.5 L Completed 13 Feb 2025Rec. 8 Mar 2024Paid ₹2.5 L
  • Interlocking work from Vidyashankar Pandey's field to Kalindi Pandey's machine in Gram Sabha Kurauna. Length 89.00 m.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #120931

    ₹3.9 L Completed 5 Feb 2025Rec. 8 Mar 2024Paid ₹3.9 L
  • Interlocking work from Gram Sabha Ghamhapur Panchayat building to Bablu Patel's house. Length 246 m.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #120561

    ₹10.8 L Completed 25 Jan 2025Rec. 8 Mar 2024Paid ₹10.8 L
  • Interlocking work from Dharmendra Mishra's house to Mahendra Singh's house near Pitch Road in Gram Sabha Chitaunikot. Length 90 m.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #120825

    ₹5.0 L Completed 17 Jan 2025Rec. 8 Mar 2024Paid ₹5.0 L
  • Interlocking work from Amarnath Patel's house to Ram Narayan's house in Gram Sabha Bhadav. length 175 m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #120618

    ₹7.4 L Completed 2 Jan 2025Rec. 8 Mar 2024Paid ₹7.4 L
  • Interlocking work from Mahendra Tiwari's house to Warden Pandey Pandey's house in Kandava Kardameshwarpuram. length 176 m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #120579

    ₹12.3 L Completed 20 Dec 2024Rec. 8 Mar 2024Paid ₹12.3 L
  • Interlocking work from Chandram Pandey's office to Dih Baba Temple in Gram Sabha Kurhua. length 360 m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #120826

    ₹14.2 L Completed 20 Dec 2024Rec. 8 Mar 2024Paid ₹14.2 L
  • Interlocking work from Pramod Pandey's house near Radha Devi Maurya's house in Gram Sabha Gopalpur. length 40 m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #120621

    ₹2.1 L Completed 11 Dec 2024Rec. 8 Mar 2024Paid ₹2.1 L
  • Interlocking work from Jayapur Shankarji Temple to house of Ragini Ram. L-26.00m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #57151

    ₹1.3 L Completed 3 Dec 2024Rec. 6 Dec 2023Paid ₹1.3 L

17th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi100%100%296100
2Mahesh Sharma · Gautam Buddha Nagar100%97%8899
3Anurag Sharma · Jhansi100%100%13798
4Seyed Tufail Hasan · Moradabad100%98%18897
5Shri Ajay (Teni) Misra · Kheri97%97%5197
6Shri Kunwar Danish Ali · Amroha100%97%32597
7Kirti Vardhan Singh · Gonda96%96%13096
8Girish Chandra · Nagina95%95%23896
9Shri Lallu Singh · Faizabad98%94%6296
10Shri Shafiqur Rahman Barq · Sambhal99%97%20695
11Rajesh Verma · Sitapur100%100%2295
12Prof SP Singh Baghel · Agra100%100%3695

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.