Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Ravindra Shyamnarayan Alias Ravi Kishan Shukla

Lok SabhaBJPGorakhpur · Uttar Pradesh

MP score19/100517th of 542 in the 18th Lok Sabha
76th of 80 from Uttar Pradesh
Also an MP in the 17th Lok Sabha Then: 92% utilisation, 114 works completed, score 86.
  • Works waiting for sanction

    95 recommended works are still awaiting sanction more than 45 days later. Sanction is the district authority’s responsibility.

  • Payments concentrated with one vendor

    85% of vendor payments went to KILDEEP MISHRA KRISHI SEWA KENDRA.

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

70%

₹10.27 Cr recommended · 106 works
Below median (76%)

Paid to vendors

₹1.54 Cr

11% of allocation
Below median (37%)

Works completed

1

0.9% of recommended
Below median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP106 works

    ₹10.27 Cr · 70% of the ₹14.70 Cr allocated

  2. Sanctioned by the district9 works

    8.5% sanctioned · took 40 days on average (due within 45 days)

  3. Completed1 works

    ₹16.0 L final cost · 20.5 months from recommendation on average

97 works are still awaiting sanction, 95 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 106 works worth ₹10.27 Cr, a fund utilisation of 70%, higher than 40% of 18th Lok Sabha MPs.
  • The district has sanctioned 9 of them, taking 40 days on average.
  • ₹1.54 Cr has been paid to vendors, 11% of the allocation.
  • 1 works are complete, typically 20.5 months after recommendation. 1 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 3 vendors. The largest received 85%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 19/100: finishing works counts most

  1. Works completed 30%1Completed ÷ recommended works.
  2. Spending efficiency 20%10Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%70Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%20Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%11Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    19
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: KILDEEP MISHRA KRISHI SEWA KENDRA, 85% of payments across 3 vendors.

District sanction speed

55/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%55Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

106 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • VIKAS KHAND CHARGAWA JUNGLE CHHATRADHARI ME INFRONT OF HIRALAL BHARTI HOUSE 01 NO HIGHMAST LIGHT

    Electricity & lightingLighting of public spaces· Gorakhpur· #166529

    ₹16.0 L Completed 5 Oct 2026Rec. 18 Jan 2025Paid ₹16.0 L
  • GRAMSABHA MANGALPUR TOLA JAGDISHPUR SOUTH KE INTERNAL GALI ME CC ROAD AND NALI

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gorakhpur· #318176

    ₹23.5 L Awaiting sanction · 37 daysRec. 25 Sep 2026
  • gram sabha tikariya me baldev singh ke form se surendra singh ke rice mill hote hua chandrawati ke ghar tak cc road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gorakhpur· #318177

    ₹24.5 L Awaiting sanction · 37 daysRec. 25 Sep 2026
  • BLOCK PALI GRAM SONBARSA HADAHA ME MAIN ROAD SE RUMALI DEVI GHAR TAK CC ROAD

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gorakhpur· #311904

    ₹10.0 L Awaiting sanction · 59 daysRec. 3 Sep 2026
  • BLOCK PALI GRAM RAMDIH TORANI ME VIDYA NIVAS GHAR SE OMPRAKASH GHAR TAK CC ROAD

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gorakhpur· #311905

    ₹6.2 L Awaiting sanction · 59 daysRec. 3 Sep 2026
  • BLOCK PALI GRAM KESHWA KHOR ME CC ROAD SE VIJAY SINGH KE KHET TAK CC ROAD

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gorakhpur· #311906

    ₹9.1 L Awaiting sanction · 59 daysRec. 3 Sep 2026
  • BLOCK PALI GRAM MINWA ME RAVI GUPTA GHAR SE RAMJANKI MANDIR TAK CC ROAD

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gorakhpur· #311907

    ₹7.8 L Awaiting sanction · 59 daysRec. 3 Sep 2026
  • BLOCK PALI GRAM BHARSAR ME CC ROAD SE KALI MATA STHAN TAK CC ROAD

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gorakhpur· #311908

    ₹9.3 L Awaiting sanction · 59 daysRec. 3 Sep 2026
  • BLOCK SAHJANWA GRAM BARAULI ME RAMKRIPAL GHAR SE GOVIND CHAUBEY GHAR TAK CC ROAD

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gorakhpur· #311909

    ₹10.9 L Awaiting sanction · 59 daysRec. 3 Sep 2026
  • BLOCK SAHJANWA GRAM GANAURI ME PITCH ROAD SE SANDEEP SRIVASTAVA GHAR TAK CC ROAD

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gorakhpur· #311910

    ₹8.1 L Awaiting sanction · 59 daysRec. 3 Sep 2026
  • BLOCK SAHJANWA GRAM BAIDAULI ME CC ROAD SE GIRISHDHAR DUBEY GHAR TAK CC ROAD

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gorakhpur· #311911

    ₹8.7 L Awaiting sanction · 59 daysRec. 3 Sep 2026
  • BLOCK SAHJANWA GRAM NAGARA ME MATA KALI STHAN SE HANUMAN MANDIR TAK CC ROAD

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gorakhpur· #311912

    ₹9.7 L Awaiting sanction · 59 daysRec. 3 Sep 2026
  • BLOCK SAHJANWA WARD NO 7 ME MANJU DEVI GHAR SE VIRENDRA SINGH GHAR TAK CC ROAD

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gorakhpur· #311913

    ₹3.5 L Awaiting sanction · 59 daysRec. 3 Sep 2026
  • BLOCK SAHJANWA WARD NO 7 ME MANIKA YADAV GHAR SE RAGHUVAR DAYAL SINGH GHAR TAK CC ROAD

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gorakhpur· #311914

    ₹23.5 L Awaiting sanction · 59 daysRec. 3 Sep 2026
  • P S KHADKHADIYA ME SMART CLASS

    Education & librariesPurchase of smart boards, visual display units and projectors· Gorakhpur· #311496

    ₹2.8 L Awaiting sanction · 60 daysRec. 2 Sep 2026

18th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi62%60%20789
2Rajkumar Chahar · Fatehpur Sikri90%71%4584
3Awadhesh Prasad · Faizabad98%65%14384
4Utkarsh Verma Madhur · Kheri85%53%34983
5Shri Arun Kumar Sagar · Shahjahanpur100%94%583
6Vinod Kumar Bind · Bhadohi81%58%52582
7Ramesh Awasthi · Kanpur84%57%10479
8Babu Singh Kushwaha · Jaunpur79%39%62278
9Daroga Prasad Saroj · Lalganj65%56%21276
10Mohibbullah · Rampur75%51%31876
11Neeraj Maurya · Aonla100%91%1775
12Mukesh Rajput · Farrukhabad99%91%24674

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.