Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Rajnath Singh

Lok SabhaLucknow · Uttar Pradesh

MP score94/10075th of 539 in the 17th Lok Sabha
14th of 81 from Uttar Pradesh
Re-elected to the 18th Lok Sabha Then: 68% utilisation, 31 works completed, score 55.
  • Payments concentrated with one vendor

    66% of vendor payments went to DEVKI ENTERPRISES.

Allocated limit

₹4.13 Cr

Median ₹8.60 Cr

Fund utilisation

100%

₹4.13 Cr recommended · 42 works
About the median

Paid to vendors

₹4.13 Cr

100% of allocation
Above median (88%)

Works completed

42

100% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP42 works

    ₹4.13 Cr · 100% of the ₹4.13 Cr allocated

  2. Sanctioned by the district42 works

    100% sanctioned · took 38 days on average (due within 45 days)

  3. Completed42 works

    ₹4.13 Cr final cost · 9.2 months from recommendation on average

In plain words

What the numbers say

  • Recommended 42 works worth ₹4.13 Cr, a fund utilisation of 100%, higher than 87% of 17th Lok Sabha MPs.
  • The district has sanctioned 42 of them, taking 38 days on average.
  • ₹4.13 Cr has been paid to vendors, 100% of the allocation.
  • 42 works are complete, typically 9.2 months after recommendation. 42 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 2 vendors. The largest received 66%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 94/100: finishing works counts most

  1. Works completed 30%100Completed ÷ recommended works.
  2. Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%100Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    42
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: DEVKI ENTERPRISES, 66% of payments across 2 vendors.

District sanction speed

100/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%100Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Sectors

Value of works by category

  1. Roads & bridges42₹4.13 Cr

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

42 works · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Parvatiya Samajothan (Parisad Bhawan Parwatashram) 5 awadh vihar Indiranagar Lucknow ke samne 80 Meter Interlocking Sadak avam Nali Nirman Karya

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #99039

    ₹6.8 L Completed 18 Jan 2026Rec. 7 Feb 2024Paid ₹6.8 L
  • Mayapuri Colony main Sh. Deepnarain ke makan se Smt. Rekha Pandey ke makan ki aur 35 Meter interlocking sadak avm nali nirman karya.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #99016

    ₹4.5 L Completed 16 Jun 2025Rec. 7 Feb 2024Paid ₹4.5 L
  • Mayapuri Colony main Sh. Pintu ke makan hote hue Sh. Neeraj Yadav ke makan ki aur 30 Meter Interlocking sadak avm Nali Nirman Karya.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #99017

    ₹3.8 L Completed 16 Jun 2025Rec. 7 Feb 2024Paid ₹3.8 L
  • Gyanender Vihar colony, pink city main Sh. B.K. Awasthy ke makan se Sh. G.S. Gupta ke awas tak 50 Meter interlocking tiles avm nali nirman karya

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #99021

    ₹3.9 L Completed 16 Jun 2025Rec. 7 Feb 2024Paid ₹3.9 L
  • Mayapuram main RCC Road se Sh. Ram Singh ke makan ki aur 140 Meter Interlocking tiles avm nali nirman karya

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #99023

    ₹12.2 L Completed 16 Jun 2025Rec. 7 Feb 2024Paid ₹12.2 L
  • Mayapuri Colony main Sh. Bhuwan Bhatt ke makan se Sh. Surender ke makan ki aur 110 Meter Interlocking Sadak avm Nali Nirman karya

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #99035

    ₹13.9 L Completed 16 Jun 2025Rec. 7 Feb 2024Paid ₹13.9 L
  • Kapariya Baba mazar ke paas Sh. Chhel Bihari ke makan se Sh. Negi ji ke makan tak 110 Meter Interlocking Sadak avm nali nirman karya

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #99040

    ₹12.9 L Completed 16 Jun 2025Rec. 7 Feb 2024Paid ₹12.9 L
  • Bhaptamau main Maurya Medical Store se Chota Rathore wali gali main 110 Meter Interlocking Sadak avm nali nirman karya

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #99043

    ₹11.8 L Completed 15 Apr 2025Rec. 7 Feb 2024Paid ₹11.8 L
  • Manasvihar colony main Sh Subedar ke Makan se Sh. Devrilal ke Makan ki aur 135 Meter CC Road & Nali Nirman ka karya

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #61936

    ₹11.0 L Completed 20 Mar 2025Rec. 14 Dec 2023Paid ₹11.0 L
  • Mayapuri Colony main nahriya road par Sh. Dinesh Kumar Jaiswal ke makan se Sh. Anurag Singh ke makan hote hue Sh. Ramchanran Yadav ke makan ki aur 50 Meter Interlocking Sadak avm nali nirman karya.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #99018

    ₹6.3 L Completed 20 Mar 2025Rec. 7 Feb 2024Paid ₹6.3 L
  • Adarshnagar Colony main H.No. A-1 se A-10 tak 90 Meter Interlocking tiles avm nali nirman karya

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #99024

    ₹7.8 L Completed 20 Mar 2025Rec. 7 Feb 2024Paid ₹7.8 L
  • Mayapuri Colony main Sonu Timber se Sh. Ramshankar Viskarma, Adv (Thapa) ke makan ki aur 100 Meter Interlocking tiles avm nali nirman karya

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #99025

    ₹11.7 L Completed 20 Mar 2025Rec. 7 Feb 2024Paid ₹11.7 L
  • Madhuban city Suggamau mai main road se Sh. Akbar Ali ke makan hote hue Smt. Nazma ke makan ki aur 125 Meter Interlocking sadak avm nali nirman karya

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #99028

    ₹13.0 L Completed 20 Mar 2025Rec. 7 Feb 2024Paid ₹13.0 L
  • Sector-16 main sithit Malviyay Park ka sondriyakaran ka karya

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #99029

    ₹12.1 L Completed 20 Mar 2025Rec. 7 Feb 2024Paid ₹12.1 L
  • Panchwati Colony main Rajat Degree College ke nikat Sh. Y.P. Singh ke makan se Sh. Arun Yadav ke makan ki aur 105 Meter Interlocking sadak avm nali nirman karya

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #99030

    ₹12.6 L Completed 20 Mar 2025Rec. 7 Feb 2024Paid ₹12.6 L

17th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi100%100%296100
2Mahesh Sharma · Gautam Buddha Nagar100%97%8899
3Anurag Sharma · Jhansi100%100%13798
4Seyed Tufail Hasan · Moradabad100%98%18897
5Shri Ajay (Teni) Misra · Kheri97%97%5197
6Shri Kunwar Danish Ali · Amroha100%97%32597
7Kirti Vardhan Singh · Gonda96%96%13096
8Girish Chandra · Nagina95%95%23896
9Shri Lallu Singh · Faizabad98%94%6296
10Shri Shafiqur Rahman Barq · Sambhal99%97%20695
11Rajesh Verma · Sitapur100%100%2295
12Prof SP Singh Baghel · Agra100%100%3695

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.