Allocated limit
₹15.48 Cr
Median ₹14.70 Cr
Fund utilisation
68%
₹10.57 Cr recommended · 102 works
Below median (76%)
Paid to vendors
₹8.31 Cr
54% of allocation
Above median (37%)
Works completed
31
30% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP102 works
₹10.57 Cr · 68% of the ₹15.48 Cr allocated
- Sanctioned by the district100 works
98% sanctioned · took 49 days on average (due within 45 days)
- Completed31 works
₹2.71 Cr final cost · 6.3 months from recommendation on average
2 works are still awaiting sanction, 2 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 102 works worth ₹10.57 Cr, a fund utilisation of 68%, higher than 37% of 18th Lok Sabha MPs.
- The district has sanctioned 100 of them, taking 49 days on average.
- ₹8.31 Cr has been paid to vendors, 54% of the allocation.
- 31 works are complete, typically 6.3 months after recommendation. 29 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 10 vendors. The largest received 20%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 55/100: finishing works counts most
- Works completed 30%30Completed ÷ recommended works.
- Spending efficiency 20%33Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%68Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%94Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%54Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: DEVKI ENTERPRISES, 20% of payments across 10 vendors.
District sanction speed
98/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%98Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
102 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Bhindiya Toal, Bada Chandganj mein Makan No. 531-62 se Makan No. 531-72 ki aur 60 Meter Sadak avm Nali ka nirman karya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #279649
₹3.9 L Sanctioned · 27 Aug 2026Rec. 5 May 2026Khadra main Kashyap ke Makan se lekar Srivastava ke makan tak 50 Meter CC Sadak avm Nali Nirman ka karya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #279650
₹5.0 L Sanctioned · 27 Aug 2026Rec. 5 May 2026Mohalla Machali Phatak Colony main kale ke Control ke Bagal wali gali ki aur 162 Meter CC Sadak avm Nali Nirman Karya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #279651
₹14.5 L Sanctioned · 27 Aug 2026Rec. 5 May 2026Parvej Mirja ke makan se lekar Radhylal Yadav ke main ki aur 104 Meter Lambi avm 6 Meter Chodi CC Sadak avm Nali ka Nirman Karya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #279652
₹8.0 L Sanctioned · 27 Aug 2026Rec. 5 May 2026Rajiv Nagar Colony main Chandan Soni ke Makan se Bina Devdi ke makan hote hue Manish Singh ks Makan ki aur 135 Meter Interlocking Sadak avm Nali Nirman Karya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #279653
₹17.6 L Sanctioned · 27 Aug 2026Rec. 5 May 2026Keshav Nagar near Gurudiksha Inter College main 78 Meter Interlocking Sadak avm Nali Nirman ka Karya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #279654
₹9.2 L Sanctioned · 27 Aug 2026Rec. 5 May 2026Hardoi Road par General Store se Bhism Dev Bajpai ke Ghar ki aur 128 Meter CC Sadak avm Nali Nirman Karya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #279655
₹12.5 L Sanctioned · 27 Aug 2026Rec. 5 May 2026Shivalik Enclave Phase-1 main Deepak ki General Marchant ki Dukan se Anil Sharma ke ghar tak 125 Meter Sadak avm Nali Nirman karya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #279656
₹11.0 L Sanctioned · 27 Aug 2026Rec. 5 May 2026Ramnagar main Hirdiyay Prakash Srivastav ke ghar se Rekha Pal ke ghar tak Sadak avm Nali ka Nirman karya. Length approx 45 Meter
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #263639
₹2.4 L Sanctioned · 28 Feb 2026Rec. 30 Jan 2026Mohalla Lokhariya main Dorilal Lodhi ke Makan se Ram Sevak ke makan tak Sadak ka nirman karya. Length Approx. 145 Meter
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #263640
₹14.0 L Sanctioned · 28 Feb 2026Rec. 30 Jan 2026Sultanpur gaon main ambedkar park ke bagal se rajender ke ghar hote hue chanderpal ke ghar ki aur Sadak and Nali Nirman ka karya. Length 120 Meter
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #260286
₹7.5 L Vendor Identification · 23 Feb 2026Rec. 20 Jan 2026Paid ₹7.5 LDisha Sirjan School main road se Advocate Mohan Singh ke awas ki aur Sadak aur nali nirman ka karya. Length 100 Meter
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #260287
₹16.1 L Vendor Identification · 23 Feb 2026Rec. 20 Jan 2026Paid ₹15.0 LHarihar Nagar Indira Nagar main Anup Singh ke makan No D-69 se C-122 Rekha Prajapati General Store ke aur Sadak aur Nali Nirman ka karya. Length 90 Meter
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #260289
₹10.5 L Vendor Identification · 23 Feb 2026Rec. 20 Jan 2026Paid ₹10.2 LMohalla Yogipuram main Amar Singh ke makan se hote hue Shelender Sharma ke makan ki aur RCC Sadak and Nali Nirman ka karya. Length Approx 30 Meter
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #260291
₹2.5 L Sanctioned · 23 Feb 2026Rec. 20 Jan 2026Mohalla Asiyamau main Dargahi ke Ghar se Rais ke Ghar tak RCC Sadak avm Nali Nirman ka karya. Length Approx 92 Meter
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #260292
₹10.0 L Vendor Identification · 23 Feb 2026Rec. 20 Jan 2026Paid ₹10.0 L
18th Lok Sabha MPs from Uttar Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Shri Narendra Modi · Varanasi | 62% | 60% | 207 | 89 |
| 2 | Rajkumar Chahar · Fatehpur Sikri | 90% | 71% | 45 | 84 |
| 3 | Awadhesh Prasad · Faizabad | 98% | 65% | 143 | 84 |
| 4 | Utkarsh Verma Madhur · Kheri | 85% | 53% | 349 | 83 |
| 5 | Shri Arun Kumar Sagar · Shahjahanpur | 100% | 94% | 5 | 83 |
| 6 | Vinod Kumar Bind · Bhadohi | 81% | 58% | 525 | 82 |
| 7 | Ramesh Awasthi · Kanpur | 84% | 57% | 104 | 79 |
| 8 | Babu Singh Kushwaha · Jaunpur | 79% | 39% | 622 | 78 |
| 9 | Daroga Prasad Saroj · Lalganj | 65% | 56% | 212 | 76 |
| 10 | Mohibbullah · Rampur | 75% | 51% | 318 | 76 |
| 11 | Neeraj Maurya · Aonla | 100% | 91% | 17 | 75 |
| 12 | Mukesh Rajput · Farrukhabad | 99% | 91% | 246 | 74 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.