Allocated limit
₹14.84 Cr
Median ₹14.70 Cr
Fund utilisation
66%
₹9.77 Cr recommended · 225 works
Below median (76%)
Paid to vendors
₹7.44 Cr
50% of allocation
Above median (37%)
Works completed
180
80% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP225 works
₹9.77 Cr · 66% of the ₹14.84 Cr allocated
- Sanctioned by the district218 works
97% sanctioned · took 2.7 months on average (due within 45 days)
- Completed180 works
₹7.41 Cr final cost · 8.8 months from recommendation on average
7 works are still awaiting sanction.
In plain words
What the numbers say
- Recommended 225 works worth ₹9.77 Cr, a fund utilisation of 66%, higher than 33% of 18th Lok Sabha MPs.
- The district has sanctioned 218 of them, taking 2.7 months on average.
- ₹7.44 Cr has been paid to vendors, 50% of the allocation.
- 180 works are complete, typically 8.8 months after recommendation. 164 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Electricity & lighting.
- Payments went to 97 vendors. The largest received 13%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 82/100: finishing works counts most
- Works completed 30%80Completed ÷ recommended works.
- Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%66Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%91Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%50Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: SARDAR ENTERPRISE, 13% of payments across 97 vendors.
District sanction speed
94/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%94Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
225 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Sinking deep tube well at the near of Uttam Sarder's house , Mouza - Baneswarpur, Dag no-245, Khatian-137 G.P- Harinarayanpur, Block- Jaynagar-I
Drinking waterInstalling tube-wells and borewells· South 24 Parganas· #316893
₹3.2 L Awaiting sanction · 40 daysRec. 22 Sep 2026Sinking deep tube well at the near of Gayenpara Mosjid, Mouza - Harinarayanpur,JL No-50, Dag no-199, G.P- Harinarayanpur, Block- Jaynagar-I
Drinking waterInstalling tube-wells and borewells· South 24 Parganas· #316902
₹3.2 L Awaiting sanction · 40 daysRec. 22 Sep 2026Sinking of tube well along with Installetion of Water purified Machine with cold & natural water system by soler enerjy beside Eyasin Mollick Shop's under Harinarayanpur G.P
Drinking waterInstalling community drinking water plants· South 24 Parganas· #316907
₹13.0 L Awaiting sanction · 40 daysRec. 22 Sep 2026Construction of flooring and shed by coloured tin shede work of stage with in Jaynagar Institution free primary School of ward no-09, under Jaynagar Majilpur Municipality
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· South 24 Parganas· #316910
₹4.0 L Awaiting sanction · 40 daysRec. 22 Sep 2026Construction of PCC road from samotul Halder's house to Bhupal Naskar's house via Halder's Dalan , Mouza- Kripakhali, G.P - Kundakhali Godabar, Block Kultali
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #316917
₹4.5 L Awaiting sanction · 40 daysRec. 22 Sep 2026Installation of a 10-Metre Electric High Mast with 6 Nos. of 200-Watt LED Flood Lights Mounted on an Octagonal Pole, Complete with Dual-Channel Timer Operation, at the house of Ananda Halder's house Mouza- Dhonpota, JL No-132, Magrahat-II
Electricity & lightingStreet lights· South 24 Parganas· #316925
₹2.5 L Awaiting sanction · 40 daysRec. 22 Sep 2026Installation of a 10-Metre Electric High Mast with 6 Nos. of 200-Watt LED Flood Lights Mounted on an Octagonal Pole, Complete with DualChannelG.PTimert Charitable disprenssary at Dakshin Barasat Auto Stand G.P- Dakshin Barasat.
Electricity & lightingStreet lights· South 24 Parganas· #316930
₹2.5 L Awaiting sanction · 40 daysRec. 22 Sep 2026Renovation of ladies toilet at the near of Maydah Kalibari, Maydah G.P under Block Jaynagar-II , E/A- AEO Zillaparishad
Sanitation & drainageConstruction of toilet blocks· South 24 Parganas· #153845
₹3.0 L Completed 19 Sept 2026Rec. 21 Nov 2024Paid ₹3.0 LConstruction of Water Supply System with Submerssible Pump and Overhead Tank near Manirtat Manipukur Hat, Plot no-1238/1463, Khatian- 80, JL No-143, Mouza-Manirtat, Joynagar-II, Village- Manirtala
Drinking waterInstalling community drinking water plants· South 24 Parganas· #153991
₹4.3 L Completed 10 Sept 2026Rec. 22 Nov 2024Paid ₹4.3 LConstruction of Water Supply System with Submerssible Pump and Overhead Tank near Manirtat Raimani Institution, Plot no-3664, Khatian- 3296, JL No-143, Mouza-Manirtat, Jonagar-II, Village- Manirtala
Drinking waterInstalling community drinking water plants· South 24 Parganas· #153998
₹4.4 L Completed 10 Sept 2026Rec. 22 Nov 2024Paid ₹4.4 LConstruction of Concrete Road from Galam Hossain field to Alauddin Mallick field at Jugdia G.P.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #205652
₹2.0 L Completed 9 Sept 2026Rec. 1 Jun 2025Paid ₹2.0 LSupply and Installation of 19 nos. 7mtr. 100wt. LED Street Light from Kalikatala Mondal Para to Molla Para under Kalikatala G.P. of Canning-II Block
Electricity & lightingStreet lights· South 24 Parganas· #194287
₹7.0 L Completed 7 Sept 2026Rec. 24 Apr 2025Paid ₹7.0 LSupply and Installation of 32 nos. 7mtr. 100wt. LED Street Light from Parganti G.P. Office to Parganti Bazar under Deuli-II G.P. of Canning-II Block
Electricity & lightingStreet lights· South 24 Parganas· #194288
₹10.5 L Completed 7 Sept 2026Rec. 24 Apr 2025Paid ₹10.5 LSupply and Installation of 29 nos 7mtr 100wt LED Street Light from Kalibari to Iswaripur Bazar under Sarengabad G P of Canning II Block
Electricity & lightingLighting of public spaces· South 24 Parganas· #194286
₹10.0 L Completed 4 Sept 2026Rec. 24 Apr 2025Paid ₹10.0 LConstruction of Solar High Mast light at Gopalnagar Kalikapur AHAS SNGHA Play Ground under Baishata Gram Panchayat
Electricity & lightingStreet lights· South 24 Parganas· #153999
₹1.7 L Completed 3 Sept 2026Rec. 22 Nov 2024Paid ₹1.7 L
18th Lok Sabha MPs from West Bengal
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Asit Kumar Mal · Bolpur | 89% | 60% | 146 | 83 |
| 2 | Pratima Mondal · Joynagar | 66% | 50% | 180 | 82 |
| 3 | Kalyan Banerjee · Sreerampur | 63% | 52% | 97 | 82 |
| 4 | Shri Deepak (Dev) Adhikari · Ghatal | 95% | 56% | 166 | 81 |
| 5 | Shri Abhishek Banerjee · Diamond Harbour | 64% | 49% | 254 | 79 |
| 6 | Kalipada Saren · Jhargram | 78% | 49% | 40 | 76 |
| 7 | Prasun Banerjee · Howrah | 74% | 50% | 140 | 74 |
| 8 | Kakoli Ghosh Dastidar · Barasat | 87% | 43% | 82 | 71 |
| 9 | Smt Sajda Ahmed · Uluberia | 72% | 34% | 96 | 71 |
| 10 | Saumitra khan · Bishnupur | 98% | 44% | 48 | 71 |
| 11 | Bag Mitali · Arambag | 96% | 41% | 95 | 71 |
| 12 | Smt Satabdi Roy (Banerjee) · Birbhum | 48% | 32% | 62 | 71 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.