Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Kalyan Banerjee

Lok SabhaAITCSreerampur · West Bengal

MP score82/10010th of 542 in the 18th Lok Sabha
3rd of 42 from West Bengal
Also an MP in the 17th Lok Sabha Then: 100% utilisation, 111 works completed, score 99.

Allocated limit

₹15.06 Cr

Median ₹14.70 Cr

Fund utilisation

63%

₹9.53 Cr recommended · 119 works
Below median (76%)

Paid to vendors

₹7.78 Cr

52% of allocation
Above median (37%)

Works completed

97

82% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP119 works

    ₹9.53 Cr · 63% of the ₹15.06 Cr allocated

  2. Sanctioned by the district119 works

    100% sanctioned · took 2.0 months on average (due within 45 days)

  3. Completed97 works

    ₹7.11 Cr final cost · 8.8 months from recommendation on average

In plain words

What the numbers say

  • Recommended 119 works worth ₹9.53 Cr, a fund utilisation of 63%, higher than 27% of 18th Lok Sabha MPs.
  • The district has sanctioned 119 of them, taking 2.0 months on average.
  • ₹7.78 Cr has been paid to vendors, 52% of the allocation.
  • 97 works are complete, typically 8.8 months after recommendation. 97 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 83 vendors. The largest received 6.5%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 82/100: finishing works counts most

  1. Works completed 30%82Completed ÷ recommended works.
  2. Spending efficiency 20%91Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%63Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%52Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: Sushanta Dutta, 6.5% of payments across 83 vendors.

District sanction speed

98/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%98Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

119 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • CONSTRUCTION OF CC ROAD FROM ZP ROAD TO BAKSHA UDAY SANGHA CLUB MATH UNDER BAKSHA G.P. UNDER CHANDITALA- II PANHAYET SAMITY, HOOOGHLY

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hooghly· #236812

    ₹3.5 L Completed 1 Oct 2026Rec. 23 Sep 2025Paid ₹3.5 L
  • SUPPLY DELIVERY ERECTION COMMISSIONING OF 6 NO 9MTR OCTAGONAL HIGH MAST TOWER 6 x 150 WATT LED LIGHT SYSTEM WITH DUAL CHANNEL 24 HR TEILIGHT TIMER OPERATION TIMER OPERATION FOR HOOGHLY DISTRIC EXCLUDING SERVICE CONNECTION, CHARGE.Danbatipur Primary School,Naity Jalapara,Garalgacha Ganguli Para,Beledanga Adak Para Near Tarama Mandir,Barijahatty Tarnu Sangha Club Paly Ground,Kalachara Near Hunuman Mandir.

    Electricity & lightingLighting of public spaces· Hooghly· #236813

    ₹8.8 L Completed 1 Oct 2026Rec. 23 Sep 2025Paid ₹8.8 L
  • PURCHASE 50 NO. CCTV AND INSTALLATION IN HOWRAH POLICE COMMISSIONERATE JURIDICTION 22 PLACE AT DOMJUR AND LILUAH PS UNDER DOMJUR ASSEMBLY CONSTITUENCY.

    Safety & securityProviding CCTV camera system for security of public areas· Howrah· #237651

    ₹25.0 L Sanctioned · 23 Sept 2026Rec. 25 Sep 2025
  • CONSTRUCTION OF AWC (NO – 140) AT RADSHIDPUR SANGJUKTA PRY. SCHOOL IN RADISHIPUR GRAM PANCHAYAT

    Education & librariesConstruction of buildings for crèches and anganwadies· Hooghly· #145785

    ₹12.1 L Completed 3 Sept 2026Rec. 5 Oct 2024Paid ₹12.1 L
  • CONSTRUCTION OF CONCRETE ROAD FROM LAND OF RADHANATH SAU TO D1 CULVERT NEAR MORHAL BALIJOLA PLAYGROUND AT MORHAL AT RAJBALHAT I GRAM PANCHAYAT UNDER JANGIPARA DEVELOPMENT BLOCK.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hooghly· #160081

    ₹6.0 L Completed 3 Sept 2026Rec. 19 Dec 2024Paid ₹6.0 L
  • CONSTRUCTION OF PASSENGER RCC WAITING SHED INFRONT OF PNB RAJBALHAT UNDER RAJBALHAT-II GRAM UNDER JANGIPARA DEVELOPMENT BLOCK

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Hooghly· #160082

    ₹9.8 L Completed 3 Sept 2026Rec. 19 Dec 2024Paid ₹9.8 L
  • CONSTRUCTION OF JAL SATRA AT DINGALHATI HIGH SCHOOL AT DIGALHATI UNDER KOTALPUR GRAM PANCHAYAT UNDER JANGIPARA DEVELOPMENT BLOCK.

    Drinking waterInstalling community drinking water plants· Hooghly· #160083

    ₹8.0 L Completed 3 Sept 2026Rec. 19 Dec 2024Paid ₹8.0 L
  • CONSTRUCTION OF CREMATORIUM AT CHALDA BURNING GHAT AT ANTPUR GRAM PANCHAYAT UNDER JANGIPARA BLOCK, HOOGHLY

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Hooghly· #160558

    ₹6.8 L Completed 3 Sept 2026Rec. 20 Dec 2024Paid ₹6.8 L
  • PURCHASE FOR A.C AMBULANCE AT FURFURA PHC UNDER JANGIPARA DEVELOPMENT BLOCK

    HealthPurchase of ambulances (Four, Three and Two wheelers)· Hooghly· #165402

    ₹12.6 L Completed 3 Sept 2026Rec. 14 Jan 2025Paid ₹12.6 L
  • CONTRUCTION OF ADDITIONAL CLASS ROOM OF BOGDADIYA SIDDIQUA SR MADRASAH AT DILAKAS GRAM PANCHAYT UNDER JANGIPARA DEVELOPMENT BLOCK

    Education & librariesConstruction of rooms and halls in school and colleges· Hooghly· #165403

    ₹12.0 L Completed 3 Sept 2026Rec. 14 Jan 2025Paid ₹12.0 L
  • CONSTRUCTION OF BURNING GHAT AT SONAMAGURI MALIPOTA SAMSAN.

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Hooghly· #207103

    ₹4.5 L Completed 3 Sept 2026Rec. 7 Jun 2025Paid ₹4.5 L
  • CONSTRUCTION OF BOUNDARY WALL AT SONAMAGURI MALIPOTA SAMSAN,UNDER MUNDALIKA GP UNDER JANGIPARA BLOCK.

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Hooghly· #207104

    ₹4.7 L Completed 3 Sept 2026Rec. 7 Jun 2025Paid ₹4.7 L
  • CONSTRUCTION OF ICDS AT POSHPUR PRY. SCHOOL, CENTER CODE NO - 302, KH. NO. - 882, PLOT NO -1230, MOUZA - POSHPUR, GP- RASHIDPUR UNDER JANGIPARA PANCHAYAT SAMITY, UNDER JANGIPARA BLOCK.

    Education & librariesConstruction of buildings for crèches and anganwadies· Hooghly· #207105

    ₹12.1 L Completed 3 Sept 2026Rec. 7 Jun 2025Paid ₹12.1 L
  • PARCHASE ONE AMBULANCE AT RADHANAGAR G.P.

    HealthPurchase of ambulances (Four, Three and Two wheelers)· Hooghly· #207107

    ₹15.0 L Completed 3 Sept 2026Rec. 7 Jun 2025Paid ₹15.0 L
  • CONSTRUCTION OF MINI JAL SATRA AT BORHAL BARORARYTALA, DILAKASH GP, DAG NO-374, MOUZA - BORHAL UNDER JANGIPARA PANCHAYAT SAMITY,

    Drinking waterInstalling community drinking water plants· Hooghly· #207106

    ₹4.5 L Completed 2 Sept 2026Rec. 7 Jun 2025Paid ₹4.5 L

18th Lok Sabha MPs from West Bengal

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Asit Kumar Mal · Bolpur89%60%14683
2Pratima Mondal · Joynagar66%50%18082
3Kalyan Banerjee · Sreerampur63%52%9782
4Shri Deepak (Dev) Adhikari · Ghatal95%56%16681
5Shri Abhishek Banerjee · Diamond Harbour64%49%25479
6Kalipada Saren · Jhargram78%49%4076
7Prasun Banerjee · Howrah74%50%14074
8Kakoli Ghosh Dastidar · Barasat87%43%8271
9Smt Sajda Ahmed · Uluberia72%34%9671
10Saumitra khan · Bishnupur98%44%4871
11Bag Mitali · Arambag96%41%9571
12Smt Satabdi Roy (Banerjee) · Birbhum48%32%6271

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.