Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Shri Abhishek Banerjee

Lok SabhaAITCDiamond Harbour · West Bengal

MP score79/10026th of 542 in the 18th Lok Sabha
5th of 42 from West Bengal
Also an MP in the 17th Lok Sabha Then: 100% utilisation, 149 works completed, score 97.

Allocated limit

₹14.89 Cr

Median ₹14.70 Cr

Fund utilisation

64%

₹9.57 Cr recommended · 320 works
Below median (76%)

Paid to vendors

₹7.23 Cr

49% of allocation
Above median (37%)

Works completed

254

79% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP320 works

    ₹9.57 Cr · 64% of the ₹14.89 Cr allocated

  2. Sanctioned by the district315 works

    98% sanctioned · took 2.9 months on average (due within 45 days)

  3. Completed254 works

    ₹6.79 Cr final cost · 10.4 months from recommendation on average

5 works are still awaiting sanction, 5 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 320 works worth ₹9.57 Cr, a fund utilisation of 64%, higher than 30% of 18th Lok Sabha MPs.
  • The district has sanctioned 315 of them, taking 2.9 months on average.
  • ₹7.23 Cr has been paid to vendors, 49% of the allocation.
  • 254 works are complete, typically 10.4 months after recommendation. 200 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 142 vendors. The largest received 7.3%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 79/100: finishing works counts most

  1. Works completed 30%79Completed ÷ recommended works.
  2. Spending efficiency 20%94Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%64Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%79Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%49Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: S S CONSTRUCTION, 7.3% of payments across 142 vendors.

District sanction speed

92/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%92Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

320 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of CC Road from Jagroto Sangha to H/O Asokh Gayen and Pintu Naskar to Bapi Pandey and Ajoy Mistry to Khokon Mistry and Haran Naskar to H/O Horen Naskar. (211 mtr)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #138672

    ₹3.0 L Completed 30 Sept 2026Rec. 3 Sep 2024Paid ₹3.0 L
  • Construction of CC Road from H/O Raju Mahato to H/O Sanjib Bachhar at Natun Pole. (311.45 mtr)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #139240

    ₹5.0 L Completed 30 Sept 2026Rec. 5 Sep 2024Paid ₹5.0 L
  • Construction of CC Road from House of Amit Sengupta to House of Raju Datta at Santinagar Ujjal Sangha. (Length- 65 Mtr.)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #201445

    ₹2.5 L Completed 30 Sept 2026Rec. 21 May 2025Paid ₹2.5 L
  • Construction of CC Road from Shitala Temple to house of Kestho Mondal at Beledanga. (Length- 150 mtr)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #202266

    ₹2.3 L Completed 30 Sept 2026Rec. 23 May 2025Paid ₹2.3 L
  • Construction of CC Road From H/O Saud Molla to H/O Miraj Molla at Laskar Para. (59.9 mtr)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #138577

    ₹99,182 Completed 28 Sept 2026Rec. 3 Sep 2024Paid ₹99,182
  • Construction of CC Road from H/O Debashish to H/O Swapon & Vombol's shop to H/O Bimol Halder and H/O Bishonath Mondal to H/O Uttom Mondal (127 mtr)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #138589

    ₹3.0 L Completed 28 Sept 2026Rec. 3 Sep 2024Paid ₹3.0 L
  • Construction of CC Road with Cover Drain from Lotus Club to H/O SK Najrul via H/O Sk Bhola. (177 mtr)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #139238

    ₹5.0 L Completed 28 Sept 2026Rec. 5 Sep 2024Paid ₹5.0 L
  • Construction of CC Road from Loknath Medical Hall to H/O Chandan Ghosh at Bidhangarh. (150 mtr)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #139241

    ₹5.0 L Completed 28 Sept 2026Rec. 5 Sep 2024Paid ₹5.0 L
  • Construction of CC Road from Opposite of Triveni tirtha club to house of Happy Sarkar. (Length- 130 mtr)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #202264

    ₹2.2 L Completed 28 Sept 2026Rec. 23 May 2025Paid ₹2.2 L
  • Construction of CC Cover Slab Drain from H/O Sintu Sadhukhan to Mahadevpur Khal At Sadhukhan Para. (90 mtr)

    Sanitation & drainageProviding drains and gutters for public drainage· South 24 Parganas· #138575

    ₹3.0 L Completed 25 Sept 2026Rec. 3 Sep 2024Paid ₹3.0 L
  • Construction of CC Road From H/O Akash Nandi to H/O Uttam Halder. (70 mtr)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #138580

    ₹3.0 L Completed 25 Sept 2026Rec. 3 Sep 2024Paid ₹3.0 L
  • Construction of CC Road With Drain With Cover Slab from H/O Azadul to H/O Tuttun Khan at Boganoa Para. (98.3 mtr)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #138586

    ₹2.0 L Completed 25 Sept 2026Rec. 3 Sep 2024Paid ₹2.0 L
  • Construction of CC Road from Durga Mandir to Tufan Ice Creamr (293 mtr)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #138681

    ₹10.0 L Completed 25 Sept 2026Rec. 3 Sep 2024Paid ₹10.0 L
  • Construction of CC Road from H/O Arun Shaw to H/O Sarvan Shaw via Shankar Dhanuk Gally, T.G Road. (215 mtr)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #139234

    ₹5.0 L Completed 25 Sept 2026Rec. 5 Sep 2024Paid ₹5.0 L
  • Construction of CC Road from H/O Ranadeb Mitra to H/O Shankar Dutta at Kalinagar. (187 mtr)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #139242

    ₹6.0 L Completed 25 Sept 2026Rec. 5 Sep 2024Paid ₹6.0 L

18th Lok Sabha MPs from West Bengal

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Asit Kumar Mal · Bolpur89%60%14683
2Pratima Mondal · Joynagar66%50%18082
3Kalyan Banerjee · Sreerampur63%52%9782
4Shri Deepak (Dev) Adhikari · Ghatal95%56%16681
5Shri Abhishek Banerjee · Diamond Harbour64%49%25479
6Kalipada Saren · Jhargram78%49%4076
7Prasun Banerjee · Howrah74%50%14074
8Kakoli Ghosh Dastidar · Barasat87%43%8271
9Smt Sajda Ahmed · Uluberia72%34%9671
10Saumitra khan · Bishnupur98%44%4871
11Bag Mitali · Arambag96%41%9571
12Smt Satabdi Roy (Banerjee) · Birbhum48%32%6271

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.