Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
74%
₹10.92 Cr recommended · 239 works
About the median
Paid to vendors
₹7.40 Cr
50% of allocation
Above median (37%)
Works completed
140
59% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP239 works
₹10.92 Cr · 74% of the ₹14.70 Cr allocated
- Sanctioned by the district214 works
90% sanctioned · took 51 days on average (due within 45 days)
- Completed140 works
₹5.84 Cr final cost · 4.5 months from recommendation on average
25 works are still awaiting sanction, 13 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 239 works worth ₹10.92 Cr, a fund utilisation of 74%, higher than 47% of 18th Lok Sabha MPs.
- The district has sanctioned 214 of them, taking 51 days on average.
- ₹7.40 Cr has been paid to vendors, 50% of the allocation.
- 140 works are complete, typically 4.5 months after recommendation. 139 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 22 vendors. The largest received 20%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 74/100: finishing works counts most
- Works completed 30%59Completed ÷ recommended works.
- Spending efficiency 20%79Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%74Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%99Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%50Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: PRAYAS, 20% of payments across 22 vendors.
District sanction speed
96/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%96Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
239 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Construction of cement concrete road with Paver Block from Susha Barui House to Manik Das House of Thanamakua G.P under A.C 173 in MPLAD
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Howrah· #324557
₹5.0 L Awaiting sanction · 6 daysRec. 26 Oct 2026Construction of cement concrete road with Paver Block from Amar Das House to Andul Road of Thanamakua G.P under A.C 173 in MPLAD
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Howrah· #324558
₹4.9 L Awaiting sanction · 6 daysRec. 26 Oct 2026Construction of cement concrete road with Paver Block from Tarak Das House to Basanta Majhi house via Narahari house of Thanamakua G.P under A.C 173 in MPLAD
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Howrah· #324559
₹5.0 L Awaiting sanction · 6 daysRec. 26 Oct 2026Construction of cement concrete road with Paver Block at Tara Maa Mandir to Sukumar Sarkar House via Tapati Das house of Thanamakua G.P under A.C 173 in MPLAD
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Howrah· #324560
₹5.0 L Awaiting sanction · 6 daysRec. 26 Oct 2026Construction of cement concrete road with Paver Block from Sahauddin House to Sajjad Mallick house of Thanamakua G.P under A.C 173 in MPLAD
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Howrah· #324561
₹5.0 L Awaiting sanction · 6 daysRec. 26 Oct 2026Construction of cement concrete road with Paver Block from Akshay Mondal House to Simul Laskar house of Thanamakua G.P under A.C 173 in MPLAD
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Howrah· #324562
₹5.0 L Awaiting sanction · 6 daysRec. 26 Oct 2026Construction of cement concrete road with Paver Block from Mintu Middey House to Toufik house of Thanamakua G.P under A.C 173 in MPLAD
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Howrah· #324563
₹5.0 L Awaiting sanction · 6 daysRec. 26 Oct 2026Construction of cement concrete road with Paver Block at Sukhen Laskar House to Prasanta Adhikary Land of Thanamakua G.P under A.C 173 in MPLAD
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Howrah· #324564
₹5.0 L Awaiting sanction · 6 daysRec. 26 Oct 2026Construction of cement concrete road with Paver Block from Mousin Molla House to Dulal house via Babur Maa House of Thanamakua G.P under A.C 173 in MPLAD
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Howrah· #324565
₹5.0 L Awaiting sanction · 6 daysRec. 26 Oct 2026Construction of cement concrete road with Paver Block from Abhijit Da House to Gita Shaw house of Thanamakua G.P under A.C 173 in MPLAD
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Howrah· #324566
₹5.0 L Awaiting sanction · 6 daysRec. 26 Oct 2026Construction of cement concrete road with Paver Block from Dhopa Tea Shop to Somnath Shop via Barafkal Area of Thanamakua G.P under A.C 173 in MPLAD
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Howrah· #324567
₹5.0 L Awaiting sanction · 6 daysRec. 26 Oct 2026Construction of cement concrete road with Paver Block at Kalipada Porel House to Sona Ganguly house of Thanamakua G.P under A.C 173 in MPLAD
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Howrah· #324568
₹5.0 L Awaiting sanction · 6 daysRec. 26 Oct 2026Supply installation of 2 Nos and Mini High Mast Light at Different places of Ramkristopur Ghat under Ward No-29 of HMC under AC-171 in MPLAD
Electricity & lightingLighting of public spaces· Howrah· #252603
₹5.9 L Completed 8 Oct 2026Rec. 7 Dec 2025Paid ₹5.9 LSupply installation of LED Street light and Mini High Mast at Naskar Para Road, Sashi Bhusan Mukherjee Road and different Lane and Road under Ward No-3 of HMC under AC-170 in MPLAD
Electricity & lightingLighting of public spaces· Howrah· #252604
₹18.1 L Completed 8 Oct 2026Rec. 7 Dec 2025Paid ₹18.1 LProviding Mini High Mast with Glow sign board at South Sankrail Jangshon of South Sankrail GP under A.C -174 in MPLAD
Electricity & lightingLighting of public spaces· Howrah· #266415
₹1.5 L Completed 6 Oct 2026Rec. 5 Feb 2026Paid ₹1.5 L
18th Lok Sabha MPs from West Bengal
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Asit Kumar Mal · Bolpur | 89% | 60% | 146 | 83 |
| 2 | Pratima Mondal · Joynagar | 66% | 50% | 180 | 82 |
| 3 | Kalyan Banerjee · Sreerampur | 63% | 52% | 97 | 82 |
| 4 | Shri Deepak (Dev) Adhikari · Ghatal | 95% | 56% | 166 | 81 |
| 5 | Shri Abhishek Banerjee · Diamond Harbour | 64% | 49% | 254 | 79 |
| 6 | Kalipada Saren · Jhargram | 78% | 49% | 40 | 76 |
| 7 | Prasun Banerjee · Howrah | 74% | 50% | 140 | 74 |
| 8 | Kakoli Ghosh Dastidar · Barasat | 87% | 43% | 82 | 71 |
| 9 | Smt Sajda Ahmed · Uluberia | 72% | 34% | 96 | 71 |
| 10 | Saumitra khan · Bishnupur | 98% | 44% | 48 | 71 |
| 11 | Bag Mitali · Arambag | 96% | 41% | 95 | 71 |
| 12 | Smt Satabdi Roy (Banerjee) · Birbhum | 48% | 32% | 62 | 71 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.