Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Kalipada Saren

Lok SabhaAITCST seatJhargram · West Bengal

MP score76/10031st of 542 in the 18th Lok Sabha
6th of 42 from West Bengal

Allocated limit

₹14.74 Cr

Median ₹14.70 Cr

Fund utilisation

78%

₹11.56 Cr recommended · 64 works
About the median

Paid to vendors

₹7.18 Cr

49% of allocation
Above median (37%)

Works completed

40

63% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP64 works

    ₹11.56 Cr · 78% of the ₹14.74 Cr allocated

  2. Sanctioned by the district61 works

    95% sanctioned · took 3.0 months on average (due within 45 days)

  3. Completed40 works

    ₹6.45 Cr final cost · 14.6 months from recommendation on average

3 works are still awaiting sanction, 3 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 64 works worth ₹11.56 Cr, a fund utilisation of 78%, higher than 54% of 18th Lok Sabha MPs.
  • The district has sanctioned 61 of them, taking 3.0 months on average.
  • ₹7.18 Cr has been paid to vendors, 49% of the allocation.
  • 40 works are complete, typically 14.6 months after recommendation. 38 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 15 vendors. The largest received 30%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 76/100: finishing works counts most

  1. Works completed 30%63Completed ÷ recommended works.
  2. Spending efficiency 20%90Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%78Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%95Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%49Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    88
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: ATANU PATRA, 30% of payments across 15 vendors.

District sanction speed

91/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%91Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

64 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Installation of 11 Nos of Submersible Pumps with overhead Tank at Different Places of Garhbeta-III Development Block under the District of Paschim Medinipur.

    Drinking waterInstalling community drinking water plants· Paschim Medinipur· #302258

    ₹38.4 L Sanctioned · 30 Oct 2026Rec. 9 Aug 2026
  • Installation of 9 mts. Electric high mast pole with Six (6) nos. 200 watt light at 10 ( Ten) different place of Jogardanga GP in Garhbeta-II Panchayat Sumity of Paschim Medinipur.

    Electricity & lightingLighting of public spaces· Paschim Medinipur· #306231

    ₹28.7 L Sanctioned · 30 Oct 2026Rec. 21 Aug 2026
  • Installation of 70 (seventy) nos. Single arm 18 watt LED Based solar light at different place of Amlagora GP in Garhbeta-I Panchayat Samity of Paschim Medinipur.

    Electricity & lightingStreet lights· Paschim Medinipur· #311985

    ₹23.8 L Sanctioned · 30 Oct 2026Rec. 3 Sep 2026
  • Installation of 100 (one hundred) nos. Single arm 18 watt LED Based solar light at different place of Gangani GP in Garhbeta-I Panchayat Samity of Paschim Medinipur.

    Electricity & lightingStreet lights· Paschim Medinipur· #311986

    ₹34.0 L Sanctioned · 30 Oct 2026Rec. 3 Sep 2026
  • Installation of 10 (ten) nos. Single arm 18 watt LED Based solar light at different place of Kharkusma GP in Garhbeta-I Panchayat Samity of Paschim Medinipur.

    Electricity & lightingStreet lights· Paschim Medinipur· #311987

    ₹3.4 L Sanctioned · 30 Oct 2026Rec. 3 Sep 2026
  • Installation of 90 (Ninety) nos. Singel arm 18-watt LED Based solar light at different place of Gohaldanga GP in Garhbeta-II Panchayat Samity of Paschim Medinipur.

    Electricity & lightingStreet lights· Paschim Medinipur· #302238

    ₹30.6 L Sanctioned · 14 Oct 2026Rec. 9 Aug 2026
  • Installation of 90 (Ninety) nos. Single arm 18 watt LED Based solar light at different place of Nalbona GP in Garhbeta-III Panchayat Samity of Paschim Medinipur.

    Electricity & lightingStreet lights· Paschim Medinipur· #306229

    ₹30.6 L Sanctioned · 14 Oct 2026Rec. 21 Aug 2026
  • Installation of 90 (Ninety) nos. Single arm 18 watt LED Based solar light at different place of Nayabasat GP in Garhbeta-III Panchayat Samity of Paschim Medinipur.

    Electricity & lightingStreet lights· Paschim Medinipur· #306230

    ₹30.6 L Sanctioned · 14 Oct 2026Rec. 21 Aug 2026
  • Installation of 25 (Twenty-Five) nos. Single arm 18-watt LED Based solar light at different places of Digi GP in Manbazar-II Panchayat Samity of Purulia district.

    Electricity & lightingStreet lights· Purulia· #302239

    ₹8.5 L Sanctioned · 1 Oct 2026Rec. 9 Aug 2026
  • Installation of 30 (Thirty) nos. Single arm 18-watt LED Based solar light at different places of Ankro Borokadam GP in Manbazar-II Panchayat Samity of Purulia district.

    Electricity & lightingStreet lights· Purulia· #302240

    ₹10.2 L Sanctioned · 1 Oct 2026Rec. 9 Aug 2026
  • Installation of 25 (Twenty-Five) nos. Single arm 18-watt LED Based solar light at different places of Buribandh GP in Manbazar-II Panchayat Samity of Purulia district.

    Electricity & lightingStreet lights· Purulia· #302241

    ₹8.5 L Sanctioned · 1 Oct 2026Rec. 9 Aug 2026
  • Installation of 25 (Twenty-Five) nos. Single arm 18-watt LED Based solar light at different places of Bargoria Jamtoria GP in Manbazar-II Panchayat Samity of Purulia district.

    Electricity & lightingStreet lights· Purulia· #302242

    ₹8.5 L Sanctioned · 1 Oct 2026Rec. 9 Aug 2026
  • Installation of 25 (Twenty-Five) nos. Single arm 18-watt LED Based solar light at different places of Kumari GP in Manbazar-II Panchayat Samity of Purulia district.

    Electricity & lightingStreet lights· Purulia· #302243

    ₹8.5 L Sanctioned · 1 Oct 2026Rec. 9 Aug 2026
  • Installation of 25 (Twenty-Five) nos. Single arm 18-watt LED Based solar light at different places of Barijagda GP in Manbazar-II Panchayat Samity of Purulia district.

    Electricity & lightingStreet lights· Purulia· #302244

    ₹8.5 L Sanctioned · 1 Oct 2026Rec. 9 Aug 2026
  • Installation of 25 (Twenty-Five) nos. Single arm 18-watt LED Based solar light at different places of Boro Jaragora GP in Manbazar-II Panchayat Samity of Purulia district.

    Electricity & lightingStreet lights· Purulia· #302245

    ₹8.5 L Sanctioned · 1 Oct 2026Rec. 9 Aug 2026

18th Lok Sabha MPs from West Bengal

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Asit Kumar Mal · Bolpur89%60%14683
2Pratima Mondal · Joynagar66%50%18082
3Kalyan Banerjee · Sreerampur63%52%9782
4Shri Deepak (Dev) Adhikari · Ghatal95%56%16681
5Shri Abhishek Banerjee · Diamond Harbour64%49%25479
6Kalipada Saren · Jhargram78%49%4076
7Prasun Banerjee · Howrah74%50%14074
8Kakoli Ghosh Dastidar · Barasat87%43%8271
9Smt Sajda Ahmed · Uluberia72%34%9671
10Saumitra khan · Bishnupur98%44%4871
11Bag Mitali · Arambag96%41%9571
12Smt Satabdi Roy (Banerjee) · Birbhum48%32%6271

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.