Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Kakoli Ghosh Dastidar

Lok SabhaAITCBarasat · West Bengal

MP score71/10073rd of 542 in the 18th Lok Sabha
8th of 42 from West Bengal
Also an MP in the 17th Lok Sabha Then: 100% utilisation, 54 works completed, score 87.
  • Works waiting for sanction

    80 recommended works are still awaiting sanction more than 45 days later. Sanction is the district authority’s responsibility.

Allocated limit

₹14.74 Cr

Median ₹14.70 Cr

Fund utilisation

87%

₹12.81 Cr recommended · 195 works
Above median (76%)

Paid to vendors

₹6.36 Cr

43% of allocation
Above median (37%)

Works completed

82

42% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP195 works

    ₹12.81 Cr · 87% of the ₹14.74 Cr allocated

  2. Sanctioned by the district105 works

    54% sanctioned · took 9.6 months on average (due within 45 days)

  3. Completed82 works

    ₹5.30 Cr final cost · 11.6 months from recommendation on average

90 works are still awaiting sanction, 80 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 195 works worth ₹12.81 Cr, a fund utilisation of 87%, higher than 68% of 18th Lok Sabha MPs.
  • The district has sanctioned 105 of them, taking 9.6 months on average.
  • ₹6.36 Cr has been paid to vendors, 43% of the allocation.
  • 82 works are complete, typically 11.6 months after recommendation. 85 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 35 vendors. The largest received 17%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 71/100: finishing works counts most

  1. Works completed 30%42Completed ÷ recommended works.
  2. Spending efficiency 20%83Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%87Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%99Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%43Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: BAIDYA NATH GHOSH, 17% of payments across 35 vendors.

District sanction speed

41/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%41Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

199 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Renovation and protection wall on canal side

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· North 24 Parganas· #320597

    ₹5.0 L Awaiting sanction · 25 daysRec. 7 Oct 2026
  • Construction of ladies toilet and painting at Sri nagar parthamik vidyalaya

    Sanitation & drainageConstruction of toilet blocks· North 24 Parganas· #320600

    ₹2.0 L Awaiting sanction · 25 daysRec. 7 Oct 2026
  • Construction of ladies toilet, plaster and pukka floor in kharki islamia senior madrasa bohera, Dutta pukur

    Sanitation & drainageConstruction of toilet blocks· North 24 Parganas· #319453

    ₹6.0 L Awaiting sanction · 31 daysRec. 1 Oct 2026
  • Supply and installation of 60KVA Silent type DG SET OF TRAINING INSTITUTE

    Electricity & lightingImprovement of electricity distribution infrastructure· North 24 Parganas· #189489

    ₹8.2 L Sanctioned · 29 Sept 2026Rec. 12 Apr 2025
  • Masonry Pucca drain

    Sanitation & drainageProviding drains and gutters for public drainage· North 24 Parganas· #196956

    ₹5.4 L Completed 27 Sept 2026Rec. 5 May 2025Paid ₹5.4 L
  • Masonry Pucca drain

    Sanitation & drainageProviding drains and gutters for public drainage· North 24 Parganas· #196957

    ₹7.9 L Completed 27 Sept 2026Rec. 5 May 2025Paid ₹7.9 L
  • Word no 3

    Sanitation & drainageProviding drains and gutters for public drainage· North 24 Parganas· #189485

    ₹5.0 L Completed 25 Sept 2026Rec. 12 Apr 2025Paid ₹5.0 L
  • Barasat Barrackpore road

    Community buildings & public spacesConstruction of bus-sheds or bus-stops· North 24 Parganas· #316246

    ₹3.0 L Awaiting sanction · 43 daysRec. 19 Sep 2026
  • Hearse van for barasat utsav committee

    Community buildings & public spacesPurchase of hearse van (Four, Three and Two wheelers)· North 24 Parganas· #316252

    ₹10.3 L Awaiting sanction · 43 daysRec. 19 Sep 2026
  • Footpath with iron railing

    Roads & bridgesConstruction of footpaths and pedestrian ways· North 24 Parganas· #316261

    ₹15.0 L Awaiting sanction · 43 daysRec. 19 Sep 2026
  • Cc road at mathurapur

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· North 24 Parganas· #316262

    ₹1.5 L Awaiting sanction · 43 daysRec. 19 Sep 2026
  • Cc road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· North 24 Parganas· #316279

    ₹3.0 L Awaiting sanction · 43 daysRec. 19 Sep 2026
  • Mini highmist solar light

    Electricity & lightingLighting of public spaces· North 24 Parganas· #316280

    ₹2.5 L Awaiting sanction · 43 daysRec. 19 Sep 2026
  • Road protection wall

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· North 24 Parganas· #316288

    ₹5.0 L Awaiting sanction · 43 daysRec. 19 Sep 2026
  • Open gym in park with solar light with boundary wall

    Community buildings & public spacesDevelopment of public parks· North 24 Parganas· #141107

    ₹10.0 L Sanctioned · 17 Sept 2026Rec. 15 Sep 2024

18th Lok Sabha MPs from West Bengal

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Asit Kumar Mal · Bolpur89%60%14683
2Pratima Mondal · Joynagar66%50%18082
3Kalyan Banerjee · Sreerampur63%52%9782
4Shri Deepak (Dev) Adhikari · Ghatal95%56%16681
5Shri Abhishek Banerjee · Diamond Harbour64%49%25479
6Kalipada Saren · Jhargram78%49%4076
7Prasun Banerjee · Howrah74%50%14074
8Kakoli Ghosh Dastidar · Barasat87%43%8271
9Smt Sajda Ahmed · Uluberia72%34%9671
10Saumitra khan · Bishnupur98%44%4871
11Bag Mitali · Arambag96%41%9571
12Smt Satabdi Roy (Banerjee) · Birbhum48%32%6271

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.